azpml + studio arch4
TRANSCRIPT
-
7/21/2019 AZPML + Studio ARCH4
1/35
1AZPML+ STUDIOARCH4
RESEARCH BY DESIGN: EXPLORING RESILIENT WAYS OF URBAN BY NATURETest Site: Osumi Island in Berat, Albania
OSUMIRIVERPARK
-
7/21/2019 AZPML + Studio ARCH4
2/35
2AZPML+ STUDIOARCH4
BERAT
-
7/21/2019 AZPML + Studio ARCH4
3/35
3AZPML+ STUDIOARCH4
Osum river
Gorica bridge
Pedestrian
PROJECT SITE
002
001
002 003
002
003
004
005
006
007
001
004005
006
007
008
001
003
001
002
004
003
001
002
003
004
005
006
005
006
007
008
009
010
011
002
003
013
001
004
005 006
007008
009
010
012
011
010011
012013
014
016
015
009
004003
002
005
006
005
006
007
008
001
004 007
Main vehicle axis
Secondary vehicle axis
Accessibility in the city
Dead Ends
Paths ending on squares in the historical site
FUNCTIONS & ACCESIBILITYLegend
-
7/21/2019 AZPML + Studio ARCH4
4/35
4AZPML+ STUDIOARCH4
B1
B2
B2
G3
G2
G1
T1
T2
T3
U1
U2
U3
G4
G5
G5
T4
INCREASING THE IMPORTANCE OF THE PUBLIC/NATURAL AND HISTORIC ATTRACTIONS
BERAT
URBAN ATTRACTIONSU U1
U2
U3 ISLAND main urban attraction
Central urban attractions
Less fraquented urban area
TOURIST ATTRACTIONSTT1
T2
T3
T4 OBSERVATION AREA/ EXPOSINGTHE HISTORICAL PART
CASTLE lack of direct access
MANGALEM most accessed area
GORRICA lacks of access fluidity
GREEN ATTRACTIONSG G1
G2
G3
G4
G5
NEW GREEN ATTRACTIONRECREATIONAL AREA
WILD VEGETATION RECREATION AREA
Most accessed green area
Lack of access in the green area/ most visual impact inthe city
Most accessed natural area reaching the river
the OSUMI RIVER PARKB B1U3
T4
G4
B2 G5 KEEP IT NATURAL
URBAN - NATURALRECREATION AREA
NATURAL & HISTORICAL ATTRACTIONS
-
7/21/2019 AZPML + Studio ARCH4
5/35
5AZPML+ STUDIOARCH4
65.000 banore25.000 turiste
Locals
Tourists
Tourists October - MayTourists May - September
Tourists < 25 years oldTourists > 45 years old
Tourists 25- 45 years old
70% 50%
Tourists from other parts of AlbaniaTourists from foreign countries
90%
Tourists with organized toursTourists without organized tours
50%
ORGANIZATIONPERIOD
TOURISTS INFORMATION
PROVENANCE AGE
TOURISM IN BERAT
-
7/21/2019 AZPML + Studio ARCH4
6/35
6AZPML+ STUDIOARCH4
ORGANIZED ITINERARIES
INFO POINTS
AGE ORIENTED FUNCTIONSCOMMON ACTIVITIESSEASONAL ACTIVITIES
DIFFERENT PATHS
ACTIVITIES
-
7/21/2019 AZPML + Studio ARCH4
7/35
7AZPML+ STUDIOARCH4
ORGANIZED ITINERARIES
INFO POINTS
AGE ORIENTED FUNCTIONSCOMMON ACTIVITIESSEASONAL ACTIVITIES
DIFFERENT PATHS
I I I I
I I
I II I II I I
I
30% more tourists
10% touristsgrowth annually
2008
15000
20000
25000
30000
2010 2012 2014 2016 2018 2020
35000
ACTIVITIES
TOURIST GROWTH
-
7/21/2019 AZPML + Studio ARCH4
8/358
AZPML+ STUDIOARCH4
ORGANIZED ITINERARIES
INFO POINTS
AGE ORIENTED FUNCTIONSCOMMON ACTIVITIESSEASONAL ACTIVITIES
DIFFERENT PATHS
I I I I
I I
I II I II I I
I
30% more tourists
10% touristsgrowth annually
2008
15000
20000
25000
30000
2010 2012 2014 2016 2018 2020
35000
INCOMES
I I I I
I I
I II I II I I
I
x 40Euro x 3days
25.000
= 120Euro
= 3 MILLIONEuro
per day ( average )
20
13
50.000
x 50Euro x 4days = 200Euro
= 10 MILLIONEuro
per day ( average )
2030
330%INCOME GROWTH
INCOMES GROWTH
2 013 202 0 2 030
3Mln
8Mln
10Mln
ACTIVITIES
TOURIST GROWTH
INCOMES
-
7/21/2019 AZPML + Studio ARCH4
9/359
AZPML+ STUDIOARCH4
CHALLENGES
WHAT WAYS WILL MAKE SURE THAT THE RIVER-
SIDE REGION IS RESILIENT ENOUGH TO REBOUND
FROM FUTURE FLOODING ?
HOW CAN WE DEVELOP THE LANDSCAPE
OF OSUMI ISLAND IN BERAT?
WHAT DESIGN SOLUTIONS WILL PROTECT THE
RESIDENTS FROM FUTURE CLIMATE EVENTS?
HOW CAN DESIGN SHAPE THE POTENTIAL
OF THE ISLAND?
CAN WE SAVE THE BIODIVERSITY?
HOW CAN WE DEVELOP LOW COST/HIGH
IMPACT SOLUTIONS?
-
7/21/2019 AZPML + Studio ARCH4
10/3510
AZPML+ STUDIOARCH4
STRATEGIES
STRATEGY 1
DAMS
WING DYKES
CHANNEL STRAIGHTENING
ARTIFICIAL CHANNELS
CHANNEL WIDENING
EXCAVATIONS
LINING THE BANKS
COST IMPLEMENTATION
TIME
BIODIVERSITY
IMPACT
USABILITY IMPACT IN THE
CITY
MAINTENANCE
-
7/21/2019 AZPML + Studio ARCH4
11/35
11AZPML+ STUDIOARCH4
VS
STRATEGY 2
ECOLOGICAL FLOODING
CONNECTIONS / FOOT-BRIDGES
AFFORESTATION
PATHS
STRATEGIESSTRATEGIES
STRATEGY 1
DAMS
WING DYKES
CHANNEL STRAIGHTENING
ARTIFICIAL CHANNELS
CHANNEL WIDENING
EXCAVATIONS
LINING THE BANKS
COST IMPLEMENTATION
TIME
BIODIVERSITY
IMPACT
USABILITY IMPACT IN THE
CITY
MAINTENANCE
-
7/21/2019 AZPML + Studio ARCH4
12/35
12AZPML+ STUDIOARCH4
COST IMPLEMENTATION
TIME
BIODIVERSITY
IMPACT
USABILITY IMPACT IN THE
CITY
MAINTENANCE
VS
STRATEGY 1
STRATEGY 2
DAMS
WING DYKES
CHANNEL STRAIGHTENING
ARTIFICIAL CHANNELS
CHANNEL WIDENING
EXCAVATIONS
LINING THE BANKS
ECOLOGICAL FLOODING
CONNECTIONS / FOOT-BRIDGES
AFFORESTATION
PATHS
STRATEGIES
-
7/21/2019 AZPML + Studio ARCH4
13/35
13AZPML+ STUDIOARCH4
AERIAL VIEW
-
7/21/2019 AZPML + Studio ARCH4
14/35
14AZPML+ STUDIOARCH4
EXISTING TRAJECTORIES
Osum river
Gorica bridge
Pedestrian
PROPOSED ACCESS
EMPHASIZING THE ACTUAL TRAJECTORIES
PROPOSING NEW CONNECTIONS AND A
CENTRAL LOOP
RRETHI
NEW CONNECTIONS
OSUMI RIVER PARK
-
7/21/2019 AZPML + Studio ARCH4
15/35
15AZPML+ STUDIOARCH4
EXISTING GREEN
1 2 3tall vegetation, different tree types lower vegetation, grass mud land
-
7/21/2019 AZPML + Studio ARCH4
16/35
16AZPML+ STUDIOARCH4
RIVER CONFIGURATIONS THROUGH TIME
-
7/21/2019 AZPML + Studio ARCH4
17/35
17AZPML+ STUDIOARCH4
lowest level
Raised level
Raised level
Maksimum historic level
Maksimum historic levelFlooding
lowest level
Flash Rain
FLOODING
PROBLEMS
SOLUTIONS
-
7/21/2019 AZPML + Studio ARCH4
18/35
-
7/21/2019 AZPML + Studio ARCH4
19/35
19AZPML+ STUDIOARCH4
PLAN1:500
54.7
56.2
NOV2005
JAN2003
NOV2005
JAN2003
JAN2003
NOV2005
JAN2
003
55.3
52.7
55.2
56.3
53.0
57.3
54.3
54.8
55.2
56.3
53.9
53.3
54.555.8
57.3
52.8
50.7
51.4
53.4
53.9
54.9
54.5
54.7
53.9
54.2
-
7/21/2019 AZPML + Studio ARCH4
20/35
20AZPML+ STUDIOARCH4
SECTION A-A
SECTION B-B
-
7/21/2019 AZPML + Studio ARCH4
21/35
21AZPML+ STUDIOARCH4
SUMMER PLAN
-
7/21/2019 AZPML + Studio ARCH4
22/35
22AZPML+ STUDIOARCH4
WINTER PLAN
-
7/21/2019 AZPML + Studio ARCH4
23/35
23AZPML+ STUDIOARCH4
RIVER FLOW
01River Flow
The scenario where the bridge is supporting thewater flow. The intensity of water fills up the river bed
and floods the wetlands. The river brings eluviationsuch as soils and pebbles.
-
7/21/2019 AZPML + Studio ARCH4
24/35
24AZPML+ STUDIOARCH4
SEDIMENTS DEPOSITION
02Sediments Depositions
Because of the eluviation the river deposits onthe bridge pylons sediments that create smaller
compositions of land.
-
7/21/2019 AZPML + Studio ARCH4
25/35
25AZPML+ STUDIOARCH4
NATURAL ADDITION LANDSCAPE
03Natural Addition Landscape
With the passing of time the deposition of sedimentswill augment and cause a natural growth of wild
vegetation. Such a way there will be a naturaladdition of the landscape.
-
7/21/2019 AZPML + Studio ARCH4
26/35
b
26AZPML+ STUDIOARCH4
-
7/21/2019 AZPML + Studio ARCH4
27/35
27AZPML+ STUDIOARCH4
AXONOMETRIC SECTIONS
-
7/21/2019 AZPML + Studio ARCH4
28/35
28AZPML+ STUDIOARCH4
RIVERFRONT
rampramp ramp rampstairs stairsgreenery greenery greenerygreenery entrance
footbridge stairsramp
-
7/21/2019 AZPML + Studio ARCH4
29/35
29AZPML+ STUDIOARCH4
01Current flowsThere is no connectionbetween the existingurban fabric and the
riverfront at the presentday.
02ConceptThe circle as elementof union, landmark andnatural shape.
03Defining the edgeThe circle sews upthe city of Berat withthe island by a new
riverfront.
04New connectionsThe circle generates anew flows system alongthe riverfront and inside
the island, activating thewhole area.
CONCEPT
-
7/21/2019 AZPML + Studio ARCH4
30/35
30AZPML+ STUDIOARCH4
TOOLKIT
rampramp ramp rampstairs stairsgreenery greenery greenerygreenery entrance
footbridge stairsramp
RIVER FRONT BARRIERS1 CLEANING OF THE SEDIMENTSRIVER2 ISLAND CONNECTIONSAFFORESTATION WITH
EXCISTING VEGETATION
STRENGTHEN OF THE BORDERS
strengthen of the borders
3
afforestation
RIVER FRONT
ISLAND CONNECTIONS
AFFORESTATION WITH
EXCISTING VEGETATION
STRENGTHEN OF THE BORDERS
CLEANING OF THE SEDIMENTS OF
THE RIVER CHANNELS
BARRIERS
RIVER
CITY
SOLUTIONS
r mr m r m r mst irs st irsr n ry r n ry r n ryr n r y ntr n
1
2
3
AREAS IN RISK OF FLOODING
SOUTH-WESTERN PARTS OF ALBANIA
NORTH-WESTERN PARTS OF ALBANIA
(LEZHA , SHKODRA ETC)
(FIER, NOVOSELE, BERAT, TEPELENE, PERMET, ETC)
-
7/21/2019 AZPML + Studio ARCH4
31/35
31AZPML+ STUDIOARCH4
VIEW FROM GORICA
-
7/21/2019 AZPML + Studio ARCH4
32/35
32AZPML+ STUDIOARCH4
ENTRANCE OF OSUMI RIVER PARK
-
7/21/2019 AZPML + Studio ARCH4
33/35
33AZPML+ STUDIOARCH4
OSUMI RIVER PARK
-
7/21/2019 AZPML + Studio ARCH4
34/35
-
7/21/2019 AZPML + Studio ARCH4
35/35