Resume: Azhar Ali Summary Over the past Seven year of my professional Career, I worked on commercial, industrial,residential and admistrative buildings. I started my career with AL-Futtaim Carillion UAE(duration 3 years) in 2007 as Site Engineer on one of their project Emaal(Emirates Aluminum) Abu Dhabi . then I emigrated to Saudi Arabia joined Saudi Binladen Group ABCD in 2011 (duration 2 years and 6months) as Site Engineer , project name C.I.D Buildings in jizan KSA. Then I moved back to pakistan in 2013 and worked with Guarantee Engineers Pvt Ltd (duration 1 years and 6months) as a Construction Manager, on their project Emporium Mall lahore Pakistan.I have eperienced in making daily work plan,setting the daily targets to ensure that set priorities and targets are being achieved to quality, time and safety standards; Established the schedule of material delivery to the site in accordance with the contractual time schedule and prepare and maintain the material status report with the procurement department; Inspecting the activities during the execution of the work and make sure that work is proceeds as per the specification and work methodology; Prepared the material submittals; Prepared shop drawings for construction; Monitored compliance of equipment and materials with project specifications and ensure executions are within design tolerances;Coordinate with the sub-contractor and maintained the record of work done by them;Take off actual quantities executed at site; have good knowledge of concrete mix design; having a high level of integrity Versed in quality control management; Materials; site construction supervision and inspections. Professional Qualification Qualification Subject Establishment/Country Year Degree B.Sc Civil Engg. University of Engg. & Tech. Lahore, Pakistan 2007 Other Qualifications, Memberships, Certification Professional Engineer, Pakistan Engineering Council Prima Vera Project Planner P6, Pakistan engineering Congress Confined Space/ Incident Investigation Training, Al-Futtaim Carillion, 2009 Employment History Year Company Designation July 2013-Present Guarantee Engineers Construction Manager/ (1Year and 6months) Pvt Ltd, Pakistan Material Engineer Sept. 2011–May 2013 Saudi Binladin Group ABCD Site Engineer ( 2 years and 6months) (P1184) Jizan,KSA Jan 2011 – Aug. 2011 SKB Construction & Asst. Project Coordinator (8 months) Engg. Lahore, Pakistan Sept. 2007–Nov. 2010 AL Futtaim Carillion Site Engineer (3 years and 2months) Abu Dhabi UAE ENGR. AZHAR ALI (Construction Manager, Material Engineer,Site Engineer) Email ID: [email protected] Cell No. +93223369454

Upload: azhar-ali

Post on 18-Jul-2015

44 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Azhar civil engr(cv)

Resume: Azhar Ali

Summary

Over the past Seven year of my professional Career, I worked on commercial, industrial,residential and admistrative buildings. I started my career with AL-Futtaim Carillion UAE(duration 3 years) in 2007 as Site Engineer on one of their project Emaal(Emirates Aluminum) Abu Dhabi . then I emigrated to Saudi Arabia joined Saudi Binladen Group ABCD in 2011 (duration 2 years and 6months) as Site Engineer , project name C.I.D Buildings in jizan KSA. Then I moved back to pakistan in 2013 and worked with Guarantee Engineers Pvt Ltd (duration 1 years and 6months) as a Construction Manager, on their project Emporium Mall lahore Pakistan.I have eperienced in making daily work plan,setting the daily targets to ensure that set priorities and targets are being achieved to quality, time and safety standards; Established the schedule of material delivery to the site in accordance with the contractual time schedule and prepare and maintain the material status report with the procurement department; Inspecting the activities during the execution of the work and make sure that work is proceeds as per the specification and work methodology; Prepared the material submittals; Prepared shop drawings for construction; Monitored compliance of equipment and materials with project specifications and ensure executions are within design tolerances;Coordinate with the sub-contractor and maintained the record of work done by them;Take off actual quantities executed at site; have good knowledge of concrete mix design; having a high level of integrity Versed in quality control management; Materials; site construction supervision and inspections.

Professional Qualification

Qualification Subject Establishment/Country Year

Degree B.Sc Civil Engg. University of Engg. & Tech. Lahore, Pakistan

2007

Other Qualifications, Memberships, Certification Professional Engineer, Pakistan Engineering Council Prima Vera Project Planner P6, Pakistan engineering Congress Confined Space/ Incident Investigation Training, Al-Futtaim Carillion, 2009

Employment History

Year Company Designation July 2013-Present Guarantee Engineers Construction Manager/ (1Year and 6months) Pvt Ltd, Pakistan Material Engineer Sept. 2011–May 2013 Saudi Binladin Group ABCD Site Engineer ( 2 years and 6months) (P1184) Jizan,KSA Jan 2011 – Aug. 2011 SKB Construction & Asst. Project Coordinator (8 months) Engg. Lahore, Pakistan Sept. 2007–Nov. 2010 AL Futtaim Carillion Site Engineer (3 years and 2months) Abu Dhabi UAE

ENGR. AZHAR ALI

(Construction Manager, Material Engineer,Site Engineer) Email ID: [email protected] Cell No. +93223369454

Page 2: Azhar civil engr(cv)

Resume: Azhar Ali Working Experience

July 2013 – Present Guarantee Engineers Pvt Ltd. Lahore Pakistan Project:The Emporium Mall Lahore Construction Manager (Jan.2014-Present) Responsibilities;

Arranged and order the material and labour at site. Setting the daily targets Raising the inspection request schedule Ordering the concrete at site Ensuring that all construction works conform to quality control standards. Taking off actual quantities executed at site Maintained the record of the work done by sub-contractor Updating sub-contractors with latest project information such as revisions to drawings,

specifications and schedule. Project:The Emporium Mall lahore Material Engineer(July2013-Dec2013) Responsibilities;

Established the laboratory at site. Prepared the mix designs for 6000 Psi ; 4500Psi ; 3000Psi ; 2000Psi ; 1500Psi and 1000Psi Compliance of Material as per required standards and specification Ensuring that all quality tools and equipment to be used at site are all calibrated and certificates are

intact. Arranging field testing after discussion and instruction of all concern personnel. Making inclusive listing and schedule of all QC testing to be accomplished in the work site. Maintaining records of Test Certificates. Maintaining records of Daily cylinder crushing ; gradation of aggregates ; moisture correction of mix

designs and concrete delivered Prepared the daily material report and reconciliation of all materials at the end of the month. Calibration of batching plants on monthly basis. Assured and controlled the quality of concrete delivered at site. Maintaining the records of FDT Maintaining Stockpiles of aggregates and backfill material at site.

Sept. 2011 – May 2013 Saudi Binladin Group ABCD (P1184Jizan Area) Saudi Arabia Project: CID Buildings Site Engineer Key Responsibilities;

Monitoring compliance of equipment and materials with project specifications and ensure executions are within design tolerances;

Supervising and motivating work group employees in their daily performance to ensure that set priorities and targets are being achieved to quality, time and safety standards;

Ensuring that all construction works conform to quality control standards, and where necessary take action to correct inconsistencies;

Taking off actual quantities executed at site; Establishing the schedule of material delivery to the site in accordance with the contractual time

schedule and prepare and maintain the material status report with the procurement department; Updating sub-contractors with latest project information such as revisions to drawings,

specifications and schedule; Implementing practices and procedures to avoid the risk of accidents and injuries.

Page 3: Azhar civil engr(cv)

Resume: Azhar Ali

Jan 2011 – Aug. 2011 SKB CONSTRUCTION & ENGINEERING Project : Shahbaz Air Base Jacobabad Asst. Project Coordinator Key Responsibilities;

Maintaining drawings and specifications provided by the client to their most up to date revisions and provide it to the construction team at site

Prepare contracts and negotiate changes to contracts with architects, consultants, clients, suppliers, and subcontractors.

Prepared the material submittals Prepared shop drawings for construction Prepared the monthly presentation for the ongoing activities

Sept. 2007–Nov. 2010 AL FUTTAIM CARILLION Project : Emirates Aluminum Emaal Abu Dhabi Site Engineer Key Responsibilities;

Making the daily work plan Making the work Method Statement and Risk Assessment Briefing the work Method Statement and Risk Assessment to general foreman Arranging the material at site Obtaining required work permits (Hot work permit, Excavation and Confined Space permit) Inspecting the activities during the execution of the work and make sure that work is proceeds as

per the specification and work methodology Raising the inspection request schedule Coordinating with the sub contractor Arranging the revised set of drawing at site Generating the daily progress reports

Personel Information Passport # NG1795282

Year of birth 1981 Marital Status Married Nationality Pakistani

Languages

English Read, write and speak fluently Arabic Speak Urdu Read, write and speak fluently

Computer Skills and Software Used

MS Word / Excel / Powerpoint / Outlook MS Project Planner Prima Vera Project Planner P6 Autodesk Quantity Take off

Ideal Next Job

Looking for work immediately at Site.