ayr corp presentation june 2014 v5 [read-only]... abn:20 109 361 195 asx: ayr company presentation...

16
www.alloyres.com.au ABN: 20 109 361 195 ASX: AYR ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 June 2014

Upload: others

Post on 07-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

www.alloyres.com.auABN: 20 109 361 195

ASX: AYRASX: AYR

COMPANY PRESENTATION

Exploring for a Great W.A. Gold Discovery

June 2014June 2014

Page 2: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

The Gold Project – Horse Well2 of 16

Yandal Belt in Western Australia

2014?

Large Gold Exploration play on the same belt as multi million ounce gold deposits

lDoray Minerals Farmin Agreement

• Fully funded exploration for 2014‐15

• Exploration commencing in July• Exploration commencing in July

• Large magnetic targets identified

• Walk up targets – continuous activity over the

1990

Walk up targets  continuous activity over the next two quarters

1890

Page 3: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

The Company3 of 16

A Western Australian based Gold Exploration Company

Board of Directors Experienced Corporate Executives

Peter Harold  Non‐Executive Chairman – (retiring June 30, MD Panoramic Resources)

Andy Viner Managing Director – Gold Exploration GeologistAndy Viner  Managing Director  Gold Exploration Geologist

Kevin Hart Non‐Executive Director and Company Secretary

Andre Marschke Non‐Executive Director – Major shareholder/Fund Manager 

Capital Structure Investors leveraged to success

Shares on Issue 440 million

Options (4.5c unlisted) 15.5 millionp ( )

Market Cap (@ 0.6c) $2.6 million

Cash (May 2014) $0.5 million

Shareholders

Top 40 58%

Directors 12%

Page 4: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Horse Well Project – Yandal Belt Target4 of 16

Looking for the next 5 Moz Gold Deposit

• 40km north of Jundee similar geology• 40km north of Jundee – similar geology

• Multiple drill targets for 2014

• Large magnetic targets, numerous soil anomalies

• Doray focussed on Crack of Dawn discovery

Jundee purchased by Northern Star Resources Ltd

• Renewed interest in Jundee region

• Mill capacity under‐utilised $82m purchase. ~ 2 years reserve life. Strategic value of resources

Page 5: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Farmin Partner ‐ Doray Minerals5 of 16

1. Project attracts Doray Minerals Limited into $2M farmin over 2 years for 60%

2. Minimum Yr 1 expenditure of $900k prior to withdrawal – Additional $150k from State Government EIS grant.

3. Alloy has opportunity to co‐fund 40% after earn‐in or reduce to 20% and free carry to PFScarry to PFS 

4. Doray or JV must spend another $2M in Yr 3. 

Page 6: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Gold Discoveries at Crack of Dawn6 of 16

Two Gold Prospects defined;

• Dusk til Dawn and Crack of Dawn

Mi i l di d d illi h d• Minimal expenditure and drilling has made discoveries   (refer ASX release 27 November 2013 –JORC 2004)

30m@ 2 g/t from 144 metres 30m @ 2 g/t from 144 metres

11m @ 3.6 g/t from 35 metres

• Whole granite contact prospective

Extensive Pyrite Alteration on contact

Granite 4.5km x 1.5km

Gold anomaly from drilling on eastern contactDusk til Dawn contact

Gold related pyrite alteration on contact where drilled

Dusk til Dawn30m @2 g/t AuAlloy discovery Crack of Dawn

11m @3.6 g/t AuEagle discoveryEagle discovery

Page 7: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Dusk til Dawn – RC Drill Discovery7 of 16

Mineralisation above granite contact in overlying metasediments

• 100 – 200m thick mineralised pyritic alteration zone – If gold bearing – significant size is possiblep

• 18 – 32 metre thick gold zone @ 1.2 – 1.94 g/t Au

• Internal higher grade zones of 9 – 12 metres at 1.91 – 3.56 g/t

(Refer ASX release 17 January 2014)

Page 8: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Crack of Dawn Granite8 of 16

Granny Smith deposit style gold mineralisation ^

• Shear‐hosted on Granite contact

• Reserve (1992) of 1.4 M Oz*

• 3km long, 5‐60m thick, +250m down‐dipdown dip

• Gold focussed on irregularities in contact orientation

• Also gold in overlying BIFAlso gold in overlying BIF

• “We have this deposit style at Dusk til Dawn”

^ Diagrams from;Mineral. Deposita 28, p409‐419, 1993

* From: 1992, MERIWA Project 195 – Preliminary Mine DatasheetV.J Ojala, S. Hunt and F. Vanderhor

Page 9: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Dusk til Dawn Prospect9 of 16

Low Cost – High Reward Target

• Located on granite contact  ‐ 1 kilometre long target

• Next drill program in July 2014

Diamond drill hole close to previous RC discovery hole

• Follow‐up RC drilling in September to define size and grade

Proposed RCProposed RCsectionssections

Di d H lDiamond Hole

Page 10: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Crack of Dawn Granite – Exploration Targets10 of 16

Entire Granite Contact is prospective

• East Contact – 4.5 km of strike

North ContactFlat ‘roof’ zone ‐ Untested

Anomalous Eagle Mining drilling ~ 1995

• Northern contact

East ContactFaultedDrill anomalies

Conceptually a strong target

• Western contact

Not drilled Not drilled

• Southern contact

Crack of Dawn prospect goldk l

Contact not drilledDusk til DawnEast‐Westcontact Crack of Dawn

East‐WestContactContact

Page 11: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Crack of Dawn Regional – Gold Targets11 of 16

Crack of Dawn Region Targets

• Almost no drilling away from Granite

• Alloy flew new Aeromagnetics in 2013

• Large ‘de‐magnetised’ Targets defined

• Fits with a large 30 km2 alteration system being present

Page 12: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Crack of Dawn ‐ Regional Drilling12 of 16

Planned and permitted air‐core program

• Commencing in August

• 7,000 metres of drilling

Granite contact targets

De‐magnetised zones

Eastern faulted ‘Jundee’ mafic rocks

Page 13: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Regional Gold Targets – Warmblood South13 of 16

• Four Gold Resources (100 koz) defined plus Warmblood Discovery in 2012/2013

• Three new soil anomalies along 7 kilometres of strike south of Warmblood (refer to ASX release 14 January 2014)  Trucking distance to Jundee

Page 14: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

SUMMARY14 of 16

1. Under‐explored highly prospective project in Yandal Belt region of W.A

2. Fully Funded 2014‐15 exploration by farmin partner Doray Minerals Limited

3. On the way to discovering a significant Gold Mineralised Systemy g g y

4. Crack of Dawn Granite Target is a ‘Granny Smith deposit’ look‐alike

5. Dusk til Dawn Prospect is DD & RC drill ready – potential game changer!

6. Crack of Dawn magnetic anomalies and strongly faulted eastern mafics – AC drill6. Crack of Dawn magnetic anomalies and strongly faulted eastern mafics  AC drill

7. Continuous exploration activity over next two quarters

Page 15: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Company Statements15 of 16

Horse Well Mineral Resources (JORC 2004)

PROJECT PROSPECTJORC

CATEGORY TONNESGRADE (g/t Au) OUNCES Au

HorseWell Palomino indicated 656 000 2 52 53 150Horse Well Palomino indicated 656,000 2.52 53,150

Inferred 105,000 3.71 12,525

Bronco indicated 41,400 1.59 2,117

Filly indicated 161,300 1.56 8,091

Filly SW indicated 90,400 7.85 22,817

Total 1,054,100 2.91 98,700

(This information was prepared and first disclosed under the JORC Code 2004(This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last updated.)

Page 16: AYR CORP Presentation June 2014 v5 [Read-Only]... ABN:20 109 361 195 ASX: AYR COMPANY PRESENTATION Exploring for a Great W.A. Gold Discovery June 2014 2 of 16 The Gold Project –Horse

Company Statements16 of 16

Disclaimer

This presentation has been prepared by Alloy Resources Limited (“Alloy”). The information contained in this presentation is a professional opinion only and is giveni d f ith C t i i f ti i thi d t h b d i d f thi d ti d th h All h t b li th t it i t t li blin good faith. Certain information in this document has been derived from third parties and though Alloy has no reason to believe that it is not accurate, reliable orcomplete, it has not been independently audited or verified by Alloy.

Any forward‐looking statements included in this document involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies,many of which are outside the control of, and maybe unknown to Alloy. In particular, they speak only as of the date of this document, they assume the success ofAlloy’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may varymaterially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document(“Recipients”) are cautioned to not place undue reliance on such forward‐looking statements.

Alloy makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility forupdating any information or correcting any error or omission which may become apparent after this document has been issued.

To the extent permitted by law, Alloy and its officers, employees, related bodies corporate and agents (“Agents”) disclaim all liability, direct, indirect orconsequential (and whether or not arising out of the negligence, default or lack of care of Alloy and/or any of its Agents) for any loss or damage suffered by aRecipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.

Exploration Results – reported under JORC 2004

The information in this report which relates to Exploration Results is based on information compiled by Andrew Viner, a Director of Alloy Resources Limited andwho is a Member of the Australasian Institute of Mining and Metallurgy. Mr Viner has sufficient experience which is relevant to the style of mineralisation andtype of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “AustralasianC d f R ti f E l ti R lt Mi l R d O R ” M Vi t t th i l i i th t f th tt b d thiCode for Reporting of Exploration Results, Mineral Resources and Ore Reserves.” Mr Viner consents to the inclusion in the report of the matters based on thisinformation in the form and context in which it appears. Mr Viner is a shareholder and option holder of Alloy Resources Limited. Mr Viner is a shareholder andoption holder of Alloy Resources.

Certain exploration drilling results are first disclosed under JORC code 2004. It has not been updated since to comply with the JORC code 2012 on the basis that theinformation has not materially changed since it was last reported.

The Company confirms that it is not aware of any new information or data that materially affects the information in the relevant ASX releases and the form andThe Company confirms that it is not aware of any new information or data that materially affects the information in the relevant ASX releases and the form andcontext of the announcements has not materially changed.

Mineral Resources

The resources in this release are based on work carried out by Dr. S. Carras FAusIMM of Carras Mining Pty Ltd. Dr. Carras has 30 years of experience which isrelevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person asdefined in the 2004 edition of the “Australian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves” and consents to the inclusion in thisreport of the information in the form and context in which it appears.

www.alloyres.com [email protected]