aveline. optimized maintenance planning gersis v3

43
We provide services Optimized Maintenance Planning Gersis Software LLC

Upload: gersis-software

Post on 21-Jun-2015

236 views

Category:

Data & Analytics


0 download

DESCRIPTION

Planning tool for enterprize with large assets. Levels load, decrease idle time and maintenance time.

TRANSCRIPT

Page 1: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Optimized Maintenance Planning

Gersis Software LLC

Page 2: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Maintenance planning in Oil&Gas. Problem statement

Problem scale:• More than 300 000 equipment units• 1 million man-hours for preventive maintenance• 0.5 million man-hours for reactive maintenance• >100 work orders per day• Forecasting for 10-20 years forward

Problems:• Equipment downtime should be as low as possible• Manual planning is difficult and error-prone• Errors cost millions of dollars• There are a lot of factors to consider (season, equipment

availability, relationships, etc.)

Page 3: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Aveline. Maintenance planning platform

• Software platform for automated planning• Automated planning in two modes:

– Strategic: long term planning (strategic)– Tactical: short term planning (tactical)

• Can be customized for specific needs• Uses data from existing ERP (SAP or other)

Page 4: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Aveline and SAP

Data Management in SAP – Automatic scheduling in Aveline.

Page 5: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Strategic Mode. Problem statement

• There are about 50 000 maintenance units

• Optimized resource forecast is to be done for 10-20 years ahead.

• A lot of factors to be considered (labor effectiveness, seasonality, etc.)

• Manual planning leads to forecast with workload peaks and idle times which cost the money

Page 6: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Strategic Mode. Example of possible losses

• Assume full cost of one man-hour equal 50$• Example existing forecast (based on real data): 10

years, ~350 maintenance units• Forecast has about 73,000 man-hours of overwork

and about 73,000 man-hours of idle time.

• Possible losses are about 7,5 million $.

Page 7: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Strategic Mode. Automated planning in Aveline

• Aveline automatically generates leveled man-resource forecast

• Aveline takes into account existing business rules (seasonality, monthly labor effectiveness, duty/standby equipment, etc.)

Page 8: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Tactical Mode. Problem statement

• Amount of work is always more than available resources

• There are hundreds of thousands of equipment and thousands of tasks. It is very difficult and error-prone to schedule them manually

• Aveline optimizes resource utilization and automatically schedules as much work as possible with available resources

• Aveline takes into account existing business constraints (Duty/Standby constraints, relationships between Operations, etc.)

Page 9: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Summary. Expected benefit

We expect reduction of work backlog by 20% as the result of optimized resource usage and work grouping. This results in: • Estimated decrease of equipment downtime by 5-10%• Increase of man-power utilization.• Reduced probability of equipment failure

Reference information:• Estimated revenue for one line for the gas production is

about 10,000$ per minute (14$ million per day).

Page 10: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Before we start. Glossary

• Work Order – combination of equipments and operations, which should be done on these equipments.

• Work Center – group of workers with similar skills (mechanics, electricians and etc.).

• Scope – set of Work Orders, which will be scheduled together, and period, for which schedule will be created.

• Planner Group - group of employees responsible for planning and processing maintenance tasks.

Page 11: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Work Scheduling Workflow

Import data from SAP

Prepare data

Create Scope

Adjust Scope

Automatic Scheduling

Final Tuning Consolidation

Export Results to SAP

Page 12: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Import data from SAP

SAP already contains information, which Aveline needs to work with:• Maintenance Items• Work Centers• Functional Location• Production Resources and Tools (PRT)

Aveline automatically imports data from files produced by SAP

Page 13: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Import data from SAP

Page 14: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Create Scope. Select Maintenance Items and Scheduling Period

• Aveline allows to define Scope name and description.

• Aveline allows to select scheduling period, for which Scope will be created.

Page 15: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Create Scope. Select Planner Group and Scheduling Period

Page 16: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Create Scope. Select Maintenance Items for scheduling

• As the next step User decides which Maintenance Items are to be included to Scope.

• Possible sources of Maintenance Items are– Maintenance Store– Local files– SAP

• Aveline also allows to include or exclude some Maintenance Items manually.

Page 17: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Create Scope. Select Maintenance Items for scheduling

Page 18: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Adjust Scope. Fix Maintenance Items

• Some Maintenance Items should stay fixed (automatic scheduling should not affect schedule defined by User).For example, some jobs should be completed in specific month.

• Aveline allows to fix Maintenance Items and their Scheduling Start Date will not be changed during automatic scheduling,

• Scheduler still have possibility to change it manually.

Page 19: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Adjust Scope. Fix Maintenance Items

Page 20: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Adjust Scope. Create/Edit Maintenance Item Packages

• Maintenance Items can be related. Scheduler may want to complete them in predefined order (at the same time or with some shift).

For example, operations for the same equipment can be grouped in order to shorten maintenance cycle.

• Aveline allows to create Maintenance Item Packages and change shifts between their Maintenance Items.

Page 21: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Adjust Scope. Create/Edit Maintenance Item Packages

Page 22: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Adjust Scope. Change Shifts

Page 23: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Additional Features. Seasonal Constraints

• Possibility to complete Maintenance Items frequently depends on season.

For example, it’s very dangerous to conduct any work around piping in a desert during summer.

• Aveline allows to create Seasonal Constraints, which define when jobs can be done, and assign them to Maintenance Items.

Page 24: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Additional Features. Create Seasonal Constraints

Page 25: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Additional Features. Assign Seasonal Constraints

Page 26: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Additional Features. Monthly Labor Effectiveness

• Workers efficiency/effectiveness for each month is different.

For example, Monthly Labor Effectiveness for August equals 50% as it is too hot to work the whole day.

• Aveline allows to configure value of workers effectiveness for each month.

Page 27: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Additional Features. Monthly Labor Effectiveness

Page 28: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Automatic Scheduling. Factors

During automatic scheduling Aveline

takes into account number of constraints:• Duty/Standby Constraints (describe when Duty

equipment should be turned off and which Standby equipment will work instead of it)

• Seasonal Constraints for specific Maintenance Items

• Relationships (shifts) between Maintenance Items

• Monthly Labor Effectiveness

Page 29: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Automatic Scheduling. Before Scheduling

Page 30: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Automatic Scheduling. After Scheduling

Page 31: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Automatic Scheduling. Work Cycle

2. Start Automatic Scheduling

3. Review Scheduling Results

Is Scheduler satisfied?

1.Configure Scheduling Scope

Page 32: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Adjust Scope. Configure Scheduling Parameters

• Overload for different Work Centres effects schedule quantity differently.

Page 33: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Final tuning. Check Violations

Aveline informs User about constraint violations (when business rule is not fulfilled):

• Seasonal Constraint Violations (Maintenance Items, which cannot be performed to given month because of weather conditions).

• Duty/Standby Violations (Maintenance Items, which cannot be performed to given month because of equipment state).

Page 34: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Final tuning. Check Violations

Aveline allows User to resolve constraint :

• Disable Seasonal Constraint• Exclude Maintenance Items

from Package or Scope• Unfix Maintenance Items and

Aveline will try to resolve violation during automatic scheduling.

Page 35: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Final tuning. Check Violations

Page 36: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Final tuning. Review Forecast

Aveline allows to review resource forecast for given schedule

Page 37: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Final tuning. Review Reports

Aveline allows to create report for given schedule variant.

Page 38: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Final tuning. Manual Scheduling

Aveline allows to use manual scheduling for final tuning

Page 39: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Consolidation

• Aveline allows to create lots of Scopes.

• It is necessary to review consolidated schedule for all Scopes to resolve resources clashes.

• Aveline allows to review forecast, reports and violations for Consolidated schedule.

Page 40: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Consolidation

Page 41: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Export data to SAP

• Prepared schedule should be exported to SAP

• Aveline allows to prepare files, which contain information about generated schedule and can be exported to SAP

Page 42: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Export data to SAP

Page 43: Aveline. optimized maintenance planning gersis v3

We provide servicesWe provide services

Thanks!