availability chec1
TRANSCRIPT
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 1/8
Availability check.
1. Activate TOR and AC at requirement class level – OVZG
2. Define requirement types and assign requirement class to Requirement
type - OVZH
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 2/8
It is important to remember that a requirement type can have only onerequirement class assigned to it, whereas a requirement class can be assigned tomultiple requirement types.
What is Requirement type?
Wheather it is daily requirement , individual requirement, No requirement etc..
3. Determination of Requirement types using transaction (set up
determination rule for TOR - OVZI)
Here SAP tries to determine the requirement type using:
A. Strategy group from material master
B. else MRP group from material master
C. else Material type from material master
D. else Item category & MRP type
E. else Item category
F. if any of these above combination is not found, system treats the
transaction as not relevant for availability check and TOR
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 3/8
4. Activate TOR and AC at schedule line category.-OVZ8
To activate TOR and AC at schedule line category the combination of
Item category + MRP type should be available in VOV5.
Then we can activate it at schedule line category in this transaction by tickingthe AC and TOR. This particular step also controls the availability check and TOR
to the particular sales document type. If we do not want the sales doc. Type to
be relevant for the AC or TOR then we can as well switch it off at this level.
5. Define checking group - OVZ2
This is an important controlling element for TOR. Checking group whether the
System should generate the individual requirement or collective requirement.
If the AC or TOR is required at all or not. Till this 5th step is relevant for TOR &
AC
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 4/8
6. Define scope of Availability check - OVZ9
If we tick mark at Replenishment lead time, means our system is not sure when
we are going to receive stock and replenishment time is not mentioned. So
whatever the orders are not honoured will go into Backorders, which can be seen
in V.15 and we can process from there once the plant receives stock from
external sources or production. I have ticked it to see if my orders are going to
Back orders.
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 5/8
Fine tuning the AC and TOR:
7. Define checking group default values- OVZ3
8. Define the default availability check rule for sales area- OVZ J
9. Define the material block for other user-OVZ1
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 6/8
(We have 2 blocks placed in AC and TOR at OVZ1 and OVZ2 (define checkinggroup).
Ovz1 is a soft block which blocks only confirmed quantities but where as
Ovz2 blocks the material completely, and will not allow the user to touch till
It is saved.
10. Creating a block quantity confirmation in delivery block OVZ7
In this scenario, if the order is blocked because of credit limit, in such case the
Material will be blocked forever, if it is not release or the order is not release,
To avoid such situation, we can specify the def. period as no: of days within
which,
If the order is not release the material qty will be added to restricted stock.
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 7/8
11. Maintain a user define requirement for AC and TOR OVB8
If user has any special requirement that we can assign here by using ABAP
coding.
12. Define the procedure for each delivery item category. OVZK
For e.g.: Return item category REN doesn’t need any AC, so you can switch it
off here.
13. Checking the rule for updating Backorder. OMIH
8/3/2019 Availability Chec1
http://slidepdf.com/reader/full/availability-chec1 8/8
If you are not able to see your plant at OMIH then probably you need to do the
following:
SPRO - Production - Material Requirements Planning - Plant Parameters - Carry
out Overall Maintenance of Plant Parameters -
Then select:
CreateEnter your plant
Check Rule: Backorder
In Short:
1. Activate AC and TOR at Requirement class - OVZG
2. Define Requirement type and assign Requirement class to it - OVZH
3. Determination of Requirement type using transaction - OVZI
4. Activate AC and TOR at Schedule line level – OVZ8
5. Define checking group – OVZ2
6. Define Scope of A.C heck – OVZ9
For fine tuning:
7. Define checking group default values – OVZ3
8. Define the default availability check rule for sales area- OVZ J
9. Define the material block for other user - OVZ1
10. Creating a block quantity confirmation in delivery block - OVZ7
11. Maintain a user define requirement for AC and TOR - OVB8
12. Define the procedure for each delivery item category – OVZK
13. Checking the rule for updating Backorder - OMIH