Auxiliary Dam Construction 2007

At Pail Factory BridgeAt Pail Factory Bridge Concord MA

Page 2: Auxiliary Dam Construction-2007 - Warner's Pond

The earthen Dam after tree removalThe earthen Dam after tree removal View from Higgin’s back yard

Page 3: Auxiliary Dam Construction-2007 - Warner's Pond

Cleared area near old spillway.

Page 4: Auxiliary Dam Construction-2007 - Warner's Pond

Spillway is cleared in preparation ofSpillway is cleared in preparation of installation of the Cofferdam

Page 5: Auxiliary Dam Construction-2007 - Warner's Pond

Installation of cofferdam

Page 6: Auxiliary Dam Construction-2007 - Warner's Pond

Diverting Water Away from Spillway g y p yto Main Stream Using Cofferdam in

Background

Page 7: Auxiliary Dam Construction-2007 - Warner's Pond

Diversion of water to main stream to beginDiversion of water to main stream to begin work on the spillway

Page 8: Auxiliary Dam Construction-2007 - Warner's Pond

Preparation of footings for new spillwayPreparation of footings for new spillway formwork plus installation of rebar

Page 9: Auxiliary Dam Construction-2007 - Warner's Pond

Installation of formwork and rebar forInstallation of formwork and rebar for new spillway dam and wing walls.

Page 10: Auxiliary Dam Construction-2007 - Warner's Pond

Installation of formwork for new spillwayInstallation of formwork for new spillway dam and wing walls

Page 11: Auxiliary Dam Construction-2007 - Warner's Pond

Grading earthworks adjacent to newGrading earthworks adjacent to new spillway

Page 12: Auxiliary Dam Construction-2007 - Warner's Pond

Wing walls of new spillway have beenWing walls of new spillway have been poured in stages

Page 13: Auxiliary Dam Construction-2007 - Warner's Pond

Grading of earthworks adjacent to newGrading of earthworks adjacent to new spillway, preparing for additional backfill

Page 14: Auxiliary Dam Construction-2007 - Warner's Pond

Installing riprap along earthworks and within new spillway

Page 15: Auxiliary Dam Construction-2007 - Warner's Pond

Preparing to remove cofferdam at newPreparing to remove cofferdam at new spillway site

Page 16: Auxiliary Dam Construction-2007 - Warner's Pond

Removing cofferdam and grading new riprapRemoving cofferdam and grading new riprap within spillway and along earthworks

Page 17: Auxiliary Dam Construction-2007 - Warner's Pond

New spillway completed and projectNew spillway completed and project closing for the winter

Page 18: Auxiliary Dam Construction-2007 - Warner's Pond

New spillway wearing a winter coatNew spillway wearing a winter coat waiting for Spring

Page 19: Auxiliary Dam Construction-2007 - Warner's Pond

What FollowsWhat Follows

• Work will commence on the main dam inWork will commence on the main dam in mid-summer of 2008, when water is at its lowest point in the pondlowest point in the pond.

• A pocket park is planned for the area to the left of the auxiliary damthe left of the auxiliary dam.

• Removal of non-native invasive plants will b i ith i t t thbegin with improvements to the area around the pond.