autumnwood park pond retrofit project

9
Autumnwood Park Pond Retrofit Project Hunter Mill District, Tax Map No. 25-1 Project No. SD-000031-129

Upload: fairfax-county

Post on 09-May-2015

997 views

Category:

News & Politics


0 download

DESCRIPTION

Autumnwood Park Pond Retrofit Project

TRANSCRIPT

Page 1: Autumnwood Park Pond Retrofit Project

Autumnwood Park Pond Retrofit Project

Hunter Mill District, Tax Map No. 25-1 Project No. SD-000031-129

Page 2: Autumnwood Park Pond Retrofit Project

Project Details

Description: The purpose of this project is the retrofit of an existing Stormwater Management Facility, referred herein as Autumnwood Regional Pond 330DP. The pond is located at 11950 Walnut Branch Road in Reston, VA, along Walnut Branch Road just east of Fairfax County Parkway, just west of trails edge lane and south of Lake Newport Road. The primary goals of this project were to provide water quality and to increase the storage of the pond.

Project Overview: • Excavating and constructing one forebay, wetlands, seven cascade steps and three micro-pools.

• Installing seven 16” coir logs in the adjacent woodland space in order to prevent eroded sediment large debris from blocking flow

exiting the facility.

• Water quality benefits obtained are 7.7 lbs./year of phosphorus, 63.4 lbs./year of nitrogen, and 2,720 lbs./year of total suspended

solids from the runoff leading to Sugarland Run.

• The disturbed area was restored with riparian seed mixes and native trees.

• DPWES Project Team: * Project Manager: Fred Wilkins * Construction Manager: Yousef Rayyan * Survey Analyst: Gregory Harper * Project Inspector: Keith Ferrell

Page 3: Autumnwood Park Pond Retrofit Project

Autumnwood Park Pond Retrofit Project

Hunter Mill District, Tax Map No. 11-3

PROJECT SITE

LIMITS OF DISTURBANCE

An Existing Riser

NORTH

Page 4: Autumnwood Park Pond Retrofit Project

PRE-EXISTING CONDITIONS WETLAND CELL AREA

THE PRE-EXISTING POND BEGINS WITH A LARGE OPEN GRASS FIELD THAT GRADUALLY SLOPES TOWARD THE RISER STRUCTURE

THE RISER STRUCTURE

Page 5: Autumnwood Park Pond Retrofit Project

CONSTRUCTED WETLAND CELL WITH FOREBAY

CONSTRUCTED FOREBAY

CONSTRUCTED WETLANDS

PLACED REINFORCED BEDDING MATERIAL AT INFLOW LOCATION

PRE-EXISTING RISER

THREE CONSTRUCTED MICRO-POOLS

PRE-EXISTING 36” CPP PIPE

Page 6: Autumnwood Park Pond Retrofit Project

PRE-EXISTING CONDITIONS MICROPOOL AREA

LOGS AND OTHER LARGE DEBRIS FREQUENTLY CREATED

BLOCKAGES AND PREVENTED FLOW FROM PRE-EXITING THE

POND.

HIGH AMOUNTS OF SEDIMENT OFTEN CLOGGED THE TRASH RACK CREATING DRAINAGE

PROBLEMS.

Page 7: Autumnwood Park Pond Retrofit Project

PRE-EXISTING CONDITIONS MICROPOOL AREA

DAM EMBANKMENT PRE-EXISTING RISER BMP ORIFICE ERODING CHANNEL

Page 8: Autumnwood Park Pond Retrofit Project

CONSTRUCTED MICROPOOL AREA

FLOW FROM THE WETLAND CELL IS DIRECTED INTO MICRO-POOLS THROUGH A CASCADE

THREE NEWLY CONSTRUCTED MICRO-POOLS

PLACED REINFORCED BEDDING MATERIAL TO TREAT ERODED AREAS

PRE-EXISTING BMP ORIFACE