authority,sas nagar
TRANSCRIPT
PUNJAT PUNJAB POLLUTION CONTROL BOARD
YHA YEHE TAUH &T3
No.2153-99Dated: o9
To
1) The Chairman,District Legal Services Authority,
13) The District Development & Panchayat
Officer, Deptt. of Rural Development &
Panchayats, SAS Nagar SAS Nagar.
14) The Chief Agriculture Officer,
Deptt. of Agriculture, SAS Nagar
15) The District Soil Conservation Officer,
Deptt. of Soil and Water Conservation.
2) The Senior Superintendent of Police
SAS Nagar.
3) The Commissioner, Municipal Corporation, SAS Nagar.
16) Executive Engineer, PSIEC
18, Himalaya Marg, Udyog Bhawan,
Sector-17-A, Chandigarh. 17) The Executive Engineer (Drainage)-Cum-
District Mining Officer, Mining Division,
SAS Nagar
The Additional Chief Administrator, 4) GMADA, SAS Nagar.
5) The Sub Divisional Magistrate,Derabassi/ Mohali/ Kharar.
18) The Executive Engineer, PWD (B&R),
Central Works Division, Mohali. 19) The Executive Engineer, PWSSB
(Division-I/), Patiala.
The Secretary, Regional Transport6) Authority, SAS Nagar.
7) The District Revenue Officer,
SAS Nagar.
20) The Executive Engineer, Deptt. of Water Supply & Sanitation,
SAS Nagar
The Civil Surgeon, 8) Deptt. of Health & Family Welfare,
SAS Nagar.
21) Executive Officer, Municipal Council,
Derabassi/Banur/Lalru/Kharar/Zirakpur/
Kurali/ Naya Gaon.
9) The Superintending Engineer,PWD (B&R), SAS Nagar
10) The Divisional Forest Officer,
SAS Nagar.
22) The Regional Director, Central Ground Water Board,
Sector-27, Bhujal Bhawan, Chandigarh 23) The President, 11) The General Manager,
District Industries Centre, Derabassi Focal Point Association,
Derabassi. 24) The President,
SAS Nagar The District Controller Food & Civil
12) Supplies, SAS Nagar. Derabassi Industrial Association,
Derabassi
Minutes of 6" meeting of the District Environment Committee (DEC) held
under the Chairmanship of Additional Deputy Commissioner (D), SAS Nagar on
11.8.2021 at 03:00 PM in the Committee Room of District Administrative
Subject:
Complex, SAS Nagar.
Please find enclosed herewith the minutes of the meeting held under the
Chairmanship of ADC (D) on 11.8.2021, for information and necessary complance.
DA/ As above
Environmental Enginee
REGIONAL OFFICE, PLOT NO. 55, PHASE-2, SAS NAGAR.
Phone: 0172-5013300 E-mail : [email protected] Web: www.ppcb.punjab.gov.in
Endst. No.2785-86 Dated: 1lio2
A copy of the above is forwarded to the following with a request to bring into
the kind notice of the Competent Authorities:
PA to Deputy Commissioner, SAS Nagar. (i) (i)
PA to Addl. Deputy Commissioner (D)-cum-Member Secretary, DEC, SAS Nagar.
neineer Environherntal Engineer
Minutes of 6th District Environment Committee held on 11/08/2021 at 03:00 PM
at Deputy Commissioner Office, SAS Nagar under the Chairmanship of Additional
Deputy Commissioner (D) to review the progress of following: Subject:
Action Plan for Clean Ghaggar (a) (b) (c) (d) (e) () (8)
Action Plan for Clean Air Dera Bassi
Solid Waste Management Rules, 2016
Status of llegal and Sand Mining
Noise Pollution Management Plan
E-waste Management Prevention of Stubble Burning
**************************"******************************** *sesse ***************************
*** **************
**********************"*********
District Environment Committee, which is constituted as per notification dated
31/10/2019 issued by Deptt. of Science, Technology and Environment. The list of oficers
officials, who attended the meeting, is attached herewith as Annexure-1.
District Environment Committee shall have to work on the following specific
thematic areas and the concerned department/ Nodal Agencies for necessary compliance
Areas Implementing Agency
a) Compliance to Solid Waste Rules including Legacy MC, SAS Nagar and EO's of
Waste. b) Compliance to Bio Medical Waste Rules
MC's
R.O., PPCB and Civil
Surgeon, SAS Nagar. MC, SAS Nagar and EO's of
MC's District Administration, MC
Compliance to Construction & Demolition Waste
d) Compliance to E-Waste Rules SAS Nagar, EO's of MC's and
PPCB, SAS Nagar
eFor Water Poluted Stretches in the State For control on air pollution in the non-attainment city Stakeholders of AQMC
Dera Bassi
Status of STPs and Re-use of Treated Water
Stakeholders of DLSTF
Status of STPs- Local Govt./ PWSSB/ GMADA / PSIEC
Re-Use of Treated Water -
Soil Conservation and
Water Resource (Irrigation) h) Status of CETPs/ ETPs including performance CETP NIL
ETP PPCB, SAS Nagar Ground Water extraction Asstt. Geologist, Ground
Cell,
Ground Water extraction/ contamination and recharge.
Water Agriculture
Deptt.
To check contamination within industries and industrial cluster- PPCB, SAS
Nagar
In rural areas Rural Water
Supply and Sanitation, Rural
Development and
Panchayats
Air Pollution - PPCB, SAS
j) Air Pollution including noise pollution Nagar Noise Pollution SDM and
DSP and assistance of PPCB to measure of Noise level in
specific cases Department of Water
k) llegal sand mining Resources (Irrigation
Rural Govt Development Local and )Rejuvenation of Water Bodies
and
Panchayats District Administration, m) Crop Residue Burning
DR Agriculture Deptt., (Cooperative), PPCB, SAS
Nagar, Rural Development
and Panchayat
(A) Action Plan for Clean Ghaggar 1. Deptt. of Local Govt., Department of Soil Conservation and PWSSB:
EE, PPCB informed the status:
Municipal Corporation, Mohali (45 MLD)
STP installed by GMADA is not achieving the standards prescribed for discharges
and failed to achieve the prescribed standards in the month of May, June and
July. Further, the STP has not yet provided the pipeline network for utilization of
treated wastewater. GMADA has not obtained consent to operate of the Board
under the Water Act, 1974 and Air Act, 1981. GMADA has provided OCEMS and
cameras at the STP.
(i) Focal Point, Dera Bassi (2MLD)
STP installed at Focal Point, Dera Bassi has consistently failed to achieve the
prescribed standards in the month of March, April, May, June and July. PSIEC
has not provided OCEMS and cameras at the STP. PSIEC has not yet obtained
consent to operate of the Board under the Water Act, 1974 and Air Act, 1981.
The AEE, PSIEC informed that the STP is being upgraded to achieve the prescribed
standards, the tendering process for the same has already been started and the
work regarding the upgradation shall be completed within 09 months. Also, the
tenders has been called for installation of CEMS and CCTVs at the STP, which is
under process. Municipal Council, Derabassi (4MLD) (ii)
STP installed by GMADA at Dera Bassi is meeting with the prescribed standards of
the Board except for the month of June, 2021 wherein it failed to achieve the
prescribed standards. GMADA has provided cameras and OCEMS at the site. The
authority has not yet obtained consent to operate of the Board under the Water
Act, 1974 and Air Act, 1981.
(iv) Municipal Council, Banur (4.0 MLD)
STP installed by PWSSB is meeting with the prescribed standards of the Board.
The PWSSB has not yet provided the OCEMS but CCTVs has been provided at the
STP. Distribution network has been provided for utilization of treated wastewater
and has obtained consents of the Board under the Water Act, 1974 and the Air
Act, 1981.
(v) Municipal Council, Lalru (1.5 MLD)
STP installed by GMADA at Lalru was visited on 05.08.2021 by PPCB officer and
found in shut-down state. As per record, it was not being operated since last
month. Effluent was being bye-passed into hassanpur drain. However, the GMADA
has applied for renewal of consents of the Board under the Water Act, 1974 and
Air Act, 1981, which was under process The MC has also not yet provided pipeline
network for distribution of treated wastewater. GMADA has provided cameras
and OCEMS at the site.
(vi) Municipal Council, Zirakpur (17.3 MLD)
STP installed by PwSSB at Zirakpur has failed to meet with the prescribed
standards for discharge of treated wastewater from the outlet of STP for the
month of March, 2021. The STP is under capacity and has not yet provided the
OCEMS, has inadequate sludge handling capacity and has also not obtained
consents to operate under the Water Act, 1974 and Air Act, 1981. No pipeline
network for utilization of treated wastewater has been late till date. CCTVs
cameras has been provided in the premises of STP.
EE, PPCB further informed that a report had been sought by the Hon'ble Principle
Secretary Science Technology and Environment regarding gap in the treatment
capacity of sewerage for Zirakpur and Kharar town and the same had been
supplied with remarks that roughly 17 MLD for Zirakpur and 10 MLD for Kharar is
being presently bypass into water bodies leading to river Ghaggar.
(vi) Municipal Council, Kharar (11 MLD)
STP installed by PWSSB at Kharar has failed to meet with the prescribed standards
for discharge of treated wastewater from the outlet of STP in the month of March,
April and July, 2021. The STP is under capacity and the effluent is being bye passed
leading to stagnation in the nearby villages. PWSSB has not provided OCEMs.
Inadequate sludge handling capacity observed. Consent to operate under the
water Act, 1974 and Air Act, 1981 has not been obtained. No pipeline network for
utilization of treated wastewater. Cameras have been provided.
PWSSB informed that presently around 22 MLD of wastewater is received at the
SP.The present capacity of the STP is 11 MLD and another STP of capacity 10
MLD has been proposed and the same is to be installed adjacent to the existing
STP of capacity 11 MLD for which the MC, Kharar is required to clear the heaps of
solid waste lying dumped at site. Presently, the estimate for the STP has been
approved by the Competent Authority.
(vii) Municipal Council, Kurali (5 MLD)
STP installed by PWSSB and 0&M by MC at Kurali has failed to meet ith the
prescribed standards for discharge of treated wastewater from the outlet of STP in
the month of July, 2021. Cameras and OCEMS has been provided. Inadequate
sludge handling capacity observed. Consent to operate under the Water Act, 1974
and Air Act, 1981 has not been obtained. The STP already provided the pipeline
system for distribution of treated wastewater and it is operational.
ix) 200 & 300 KLD STP at Aerocity
GMADA has installed 02 no. STPs of capacity 200 KLD & 300 KLD as a temporary
arrangement to treat the domestic effluent of Aerocity Mohali, in place of the
proposed STP of capacity 15 MLD, which is under construction. These STPs have
failed to meet with the prescribed standards for discharge of treated wastewater
from the outlet of STP in the month of July, 2021. The STPs are under capacity.
GMADA has not provided oCEMS. Inadequate sludge handling capacity observed.
Consent to operate under the Water Act, 1974 and Air Act, 1981 has not been
obtained. No pipeline network for utilization of treated wastewater.
Status of proposed STPs:
EE, PPCB informed that as per action plan for clean Ghaggar, 4 new STPs proposed at Lalru
of capacity of 1.5 MLD, 1 MLD and two of 0.3 MLD.
AEE, PWSsB informed that a new site has been indentified for establishment of STP of
capacity 1.5 MLD and the tender for the same has been called. EO, Lalru informed that
alternate site has been identified for the installation of STP of capacity 1 MLD at Dappar
Lalru. He further informed that DNIT for the two STPs of 0.3 MLD each has been prepared
and shortly undergo tendering process.
AEE, PwSSB informed that DNIT for the two STPs of 2 MLD each at Derabassi has been
prepared and shortly undergo tendering process.
AEE, PWSSB informed that two new STPs of capacity of 0.5 MLD and 0.15 MLD has been
proposed at Banur. The work regarding construction of STP of capacity 0.5 MLD has been
75% completed & the same shall be commissioned by 31 October, 2021. The DNIT for
the STP of 0.15 MLD has been prepared and shortly undergo tendering process
AEE, PWSSB informed that the tendering for one additional STP of capacity of 17 MLD at
Zirakpur is under process.
It was brought to the knowledge of the Chairperson that no STP yet provided at the Naya
Gaon and the sullage generated from cleaning of soakage pit is collected through tankers
and treated at the STP located at Kharar and Kurali. The EO Naya Gaon submitted that the
STP of capacity 10 MLD has been proposed for Naya Gaon but due to non-availability of
land, the project is getting delayed. He further informed that one land was identified for
establishment of STP in village Nadha but the same has been halted due to complaints of
nearby residents. The matter has been stayed by the Financial Commissioner Revenue,
Punjab vide order dated 16/06/2020 with the directions to complainant to place the stay
application before the Divisional Commissioner, Roopnagar. Accordingly, the
complainants have filed their application for status quo in the court of Divisional
Commissioner, Roopnagar and the next date of hearing in the matter is 31/08/2021. The
DPR for construction of STP and laying of sewerage network in Naya Gaon has been
prepared by the PWSSB. In this regard the ADC(D) SAS Nagar had issued the possession
warrant for Khasra no. 129/1 to the MC, Naya Gaon, however, Sh. Harbhajan Singh Kahlon
&Ors. had issued application against the same in the IRD court and the court has imposed
status quo in the matter. The next date of hearing in the matter is on 14/10/2021. The
MC, Nayagaon is facing issues for installation of STP due to non-availability of land.
EE, PPCB informed that in the last meeting DLSCO in coordination with the respective MC
SAS Nagar/ GMADA/ EO MCs was directed to device proposal for the effective utilization
of the treated effluent from the STPs for construction as well as for irrigation purpose,
however, no report received till date.
Directions given:
PWSSB, MC, SAS Nagar, GMADA and PSIEC to ensure that STPs should run efficiently to
achieve the standards prescribed by MoEF and PPCB.
All MC's and STP operated by PWSSB, PSIEC shall maintain proper record for
generation/disposal of sludge in their respective STPs.
PWSSB shall submit fixed timelines for the proposed STPs with remarks on dates of
calling/ re-calling tenders for the same, within 10 days. The timelines provided by the
PWSSB for the same are attached as Annexure-2.
PWSSB, GMADA, MC, Banur, Zirakpur, Kharar, and PSIEC shall submit fixed timelinesfor
the installation of the Online Continuous Effluent Monitoring System (0CEMS) at their
respective STPS within 10 days.
Municipal Corporation, SAS Nagar, Derabassi, Zirakpur, Kharar, Kurali and PSIEC shall
obtain consent to operate for STPs from PPCB within 15 days without any failure.
ne mc Kharar shall expiditely clear the legacy waste from the proposed site of STP and
the land shall be provided to the PWssB, further shall submit written report to the office
of the ADC(D) SAS Nagar.
The MC, Lalru and PWssB shall jointly visit the proposed site of the STP of capacity 1
MLD at Dappar Lalru and submit report/ recommendations to the office of the ADCc(D)
regarding the status within 10 days.
EO, MC Nayagaon shall submit representation to the office of Deputy Commissioner,
SAS Nagar regarding the issues faced for installation of proposed 11 MLD STP at
Nayagaon and to follow up the matter personally in the Hon'ble Court & submit its
status from time to time.
The District Level Soil Conservation Officer in coordination with Municipal Corporation,
SAS Nagar, GMADA, EO, MCs shall device proposal for effective utilization of the treated
efjiluent from the STPs for construction as well as for irrigation purposes and submit
report within 10 days.
Inspection of 41 industries located in the catchment area of river Ghaggar
EE, PPCB informed that due to outbreak of second wave of COVID-9 pandemic and
engagement of all authorities in COVID related duties, further visits with the DLSTF could
not be carried out after Fetb, 2021. However, routine visits are being conducted by the
PPCB to the 41 industries located on the catchment area of river Ghaggar and 34 no.
industries had been inspected since March, 2021 to till date. Allindustries were found
complying except one industry namely M/s Suguna Foods Pvt. Ltd., Derabassi and the
renewal of consent to operate applied by the industry had been refused by the competent
authority and no further restoration of electricity supply granted to the industry. Further,
the PSPCL authorities were directed to disconnect the electricity supply available to the
industry. The same was restored after almost a month's time as the industry has made the
necessary compliances at site.
Plugging of the unauthorized outlets by MC, Zirakpur
EE, PPCB informed that there are many unauthorized outlets in the area under jurisdiction
of MC Zirakpur through which the domestic effluent is discharged into the natural drain.
The MC has to plug all these unauthorized outlets. A report was sought by the Hon'ble
Principle Secretary Science Technology and Environment regarding gap in the treatment
capacity of sewerage for Zirakpur & its present disposal and a survey was carried out by
PPCB wherein 06 no. bypass/ unauthorized outlets within MC Zirakpur into local water
bodies was observed.
EO, MC Zirakpur informed that the plugging has to be carried out by PwSsB alongwith the
installation of proposed STP of capacity 17 MLD for Zirakpur.
6
The Chairperson directed the PWsSB to submit report in coordination with M, Zirakpur
regarding the plugging of the unauthorized outlets and in the urban area within 10 days
without failed to ADC[D) office, SAS Nagar as well as to PPCB.
As the DDPO and/or his department representative, was not present in the meeting due to
administrative reasons; the Chairperson directed that the DDPO after receipt of the
proceedings5, in coordination with EE, Drainage shall submit the compliance w.r.t to the
tapping of unauthorized outlets in Rural areas of Zirakpur within 10 days, without fail to ADC
(D) Office, SAS Nagar as well as to Punjab Pollution Control Board.
Plugging of the unauthorized outlets by Mc, Kharar
EE, PPCB informed that there are many unauthorized outlets in the area under jurisdiction
of MC Kharar through which the domestic effluent is discharged into the natural drain(s).
The MC has to plug all these unauthorized outlets. A report was sought by the Hon'ble
Principle Secretary Science Technology and Environment regarding gap in the treatment
capacity of sewerage for Kharar & its present disposal and a survey was carried out by
PPCB wherein bypass/ unauthorized outlets within MC Kharar into local water bodies
were observed. Further, MC, Kharar and PwSsB were given hearing before Chairman,
PPCB on 01.06.2021 wherein MC was asked to carry out digital survey of unauthorized
residential/commercial establishment discharging untreated effluent into drain within 1
month and PWSSB was asked to submit PERT chart within 10 days for the completion of
sewer network to tap the unauthorized disposal.
EO, MC Kharar informed that digital survey of unauthorized residential/ commercial
establishment discharging untreated effluent into drain is being carried out. Further, the
plugging of unauthorized outlets has to be carried out by PWSSB alongwith the
installation of proposed STP of capacity 10 MLD for Kharar. The AEE, PWSSB informed that
the DPR for the proposed STP is under preparation.
The Chairperson directed the PWSSB to submit report in coordination with M, Kharar
regarding the plugging of the unauthorized outlets and in the urban area within 10 days to
ADC[D) office, SAS Nagar as well as to PPCB.
As the DDPO and/or his department representative, was not present in the meeting due to
administrative reasons; the Chairperson directed that the DDPO after receipt of the
proceedings, in coordination with EE, Drainage shall submit the compliance w.r.t to the
tapping of unauthorized outlets in Rural areas of Kharar within 10 days, to ADC (D) Office,
SAS Nagar as well as to Punjab Pollution Control Board.
Villages discharging their wastewater into drain leading to river Ghaggar and ldentification of
drains/nallahs/ choes, which are eventually meeting river Ghaggar
The EE, PPCB pointed out that the wastewater from certain villages is being discharged
into drains/ creeks/ nallah which falls into river Ghaggar, which needs to be checked
immediately likely Haibatpura Drain, Jharmal Choe, Basauli Drain, Dhabi Nallah etc.
because three cases are under progress in Hon'ble NGT w.r.t. Derabassi area. The matter
could not be reviewed as DDPO, SAS Nagar was not present in the meeting.
However, the Chairperson directed that the Department of Rural Development and
Panchayats after the receipt of the proceedings, shall provide the list of the villages where
proposal for installation of treatment plants are under process within 10 days.
Further, the EE, Drainage to keep regular check on all the drains and River Ghaggar of
District SAS Nagar to the effect that if any industry or other outlet is discharging treated
untreated efluent into any drain/ river, intimation be given to PPCB immediately.
Restoration of water bodies
As per OA no. 325 of 2015 in the matter of Lt. Col Sarvadaman Singh Oberoi Vs Union of
India & ors., the Hon'ble NGT has emphasized for protection and restoration of water
bodies for the environment and it has been directed by the Hon'ble NGT that various
ponds in the vilages be restored and new ponds be created in association with the District
Administration, Deptt. of Irrigation and Flood Control or other concerned Departments
such as Department of Rural Development/Urban Development/ Local Bodies / Forests/
Revenue etc. EE, PPCB informed that Chairman of the Board has issued direction u/s 33-A
of the Water (Prevention & Control of Pollution) Act, 1974 to the DDPOs of the State vide
no. 3326-48 dated 12/02/2021 as under:
Restoration of the water bodies shall be done in a time bound manner by involving village
Panchayats to ensure the compliance of the orders passed by the Hon'ble NGT on
25/02/2020, 01/06/2020 & 18/11/2020 in the matter of OA no. 325/2015 and to submit
PERT chart to the PPCB in this regard.
Deptt. of Rural Development & Panchayats shall issue necessary directions to all the
village Panchayats to the effect that no village shall be allowed to discharge the
untreated/ treated wastewater into borewell in any case and where ever such practice is
adopted, the same shall be stopped immediately. The compliance report be provided by
the DRDPO to the Environmental Engineer, PPCB of the respective area by 31/03/2021.
The Chairperson directed that DDPO shall ensure the compliance of the above directions
in true letter and spirit.
The matter could not be reviewed as DDPO, SAS Nagar was not present in the meeting. The
Chairperson directed that the Department of Rural Development and Panchayats after the
receipt of the proceedings, shall provide the report to the aforementioned points within 10
days. Further, DDPO, SAS Nagar and EE, Rural Development and Panchayats shall submit
8
the monthly progress report regarding ponds to PPCB as well as to the office of Additional
Deputy Commissioner (D), SAS Nagar and list of the vllages for protection and restoration
of water bodies for the environment in compliance to the NGT orders in compliance to OA
no. 325 of 2015.
Health Check Camps by Deptt. of Health & Family Welfare
EE, PPCB informed that 4 camps per month are required as per directions received from
Hon 'ble NGT Executive Committee. No report received from the Health Department.
The Chairperson directed the representative of Deptt. of Health & Family Welfare to ensure
the compliance of the above directions in true letter and spirit and to organize health
checkup camp in the catchment area of river Ghaggar alongside the vaccination camps
organized there under.
Sprinkling of treated STP water before sweeping of roads-OA no. 283 of 2020
EE, PPCB informed that vide orders dated 03/12/2020 passed in OA no. 283 of 2020; the
Hon'ble NGT directed that all the Municipal Corporations/ Local Bodies to take necessary
steps to ensure sprinkling of water before sweeping of roads using treated water of STPs
and take further steps of planting of grass/ raising small herbs and shrubs on the side of
the pavements/ road shoulders and on open dusty areas including areas on the side of the
pavements/ right of way. Further all the Municipal corporation/ Local Bodies were
required to furnish the reports by 01/02/2021 mentioning the steps initiated and action
taken report every subsequent quarter.
In this regard, PPCB vide letter no. 191 dated 18/01/2021 had requested the GMADA, MC
SAS Nagar and the ULBs to submit the compliance of points mentioned in the order within
15 days.
The Chairperson directed the GMADA, MC SAS Nagar and the ULBs to submit the report
within 10 days, to ADC (D) Office, SAS Nagar as well as to Punjab Pollution Control Board.
Ground water sampling
EE, PPCB informed that the Deptt. of Water Supply and Sanitation are carrying out the
ground water sampling to check the various parameters of the ground water at different
locations in the catchment area of river Ghaggar. Analysis results have not been
submitted by the Department of Water Supply and Sanitation regarding the same as there
are checking vans deputed by the department for carrying out the monitoring of ground
water.
The Chairperson directed that the DWSS shall submit the analysis report with comments of
the samples of drinking water tested from area/ villages along the bank of River Ghaggar
with the help of mobile van, within 10 days.
9
(B) Action Plan for Non- Attainment city Dera Bassi activities: The EE, PPCB informed that in the 4h meeting of the DEC, the Chairperson directed that a
second meeting at the sub-divisional level shall be conducted under the Chairmanship of
SDM, Dera bassi in which stake holder departments may be called and further progress
made at the Sub Divisional Level meeting w.r.t. compliance of activities mentioned in the
Action Plan will be reviewed in the District Environment Committee meeting. Accordingly,
a meeting was conducted at sub-division level on 05/03/2021 and the proceeding of the
meeting has been sent to the stakeholder departments. The next meeting is scheduled to
be held on 31/08/2021 The Chairperson directed that the progress regarding compliance of activities mentioned in
the Action Plon and proceeding of the meeting of AQMC to be held at Sub-divisional Level
shall be reviewed in the next meeting of DEC.
(C) Solid Waste Management:
The EE, PPCB informed that during the 5th meeting of the DEC, the following directions
were given:
EO, Zirakpur shall comply with the necessary directions passed by NGT vide its order
dated 18 02. 2021 in OA No. 143 of 2020 titled as Mohinder Singh Versus Union Territory
of Chandigarh
The Municipal Corporation, SAS Nagar and Deputy Director, Local Govt. (consolidated
report of all MCs) to ensure that the timelines prescribed by the monitoring committee
shall be complied with and also to submit the timely progress report to PPCB and the
same is to be put up in the next meeting. Deputy Director, Local Govt. shali hold regular
meetings with respect to all points pertaining to all Municipal Councils/ Nagar Panchayats
monthly and submit a consolidated report before the District Environment Committee in
every meeting
The Municipal Corporation, SAS Nagar, MC Dera Basi, Zirakpur, Banur, Lalru shall visit the
drains/ nallahs/ canals within municipal limits and ensure that solid waste, ying dumped
along the banks of these drains/ nallahs/ canas, are removed The progress regarding the
same shall be submitted within 15 days to ADC (D) Office, SAS Nagar as well as to PPCB
DDPO shall instruct the BDPOs to organize Awareness Camps for the officiaB of
Department of Rural Development and Panchayats regarding implementation of Plastic
waste Management Rules, 2016, in rural areas and submit progress within 15 days to the
office of ADC (D)
Directions given during the meeting:
The E0, Zirakpur shall submit its report w.r.t. the directions passed by the NGT
vide its order dated 18.02.2021 in OA No. 143 of 2020 titled as Mohinder Singh
Versus Union Territory of Chandigarh within 10 days.
10
The charge of Deputy 0irector iocal Giovt is being looked ofter by the ADC{G) of
respective district of the State, therefore, the Chairperson directed the tO MCs to
submit their repecthve report in the matter to the offee of ADKEG} SAS Magar on
monthly basis fin the proformas preseribed by the Nat monitoring comnittre) so
thot the compiled report con be diceusted in the meetings of Distriet
Environment Committee for reviewing the progress. The MCs SAS Nagar shalf
also submit the some report on monthiy bosis The Chairperson directed thot Municipol Corporation, SAS Nagar, MC Deru Bass
Zirakpur, Banur, Lalru, Kharar & Kurali shall survey the drains/ nallahs/ canals
within municipal limits and ensure that solid waste, lying dumped along the
banks of these drains/ nallahs/ canals, are removed. The report regarding the
same shall be submit within 15 days to the ADC[D) office as well as the PPCB.
The BDPOs shall organize Awareness Camps for the official of Department of
Rural Development and Panchayats regarding implementation of Plastic waste
Management Rules, 2016, in rural areas and submit progress within 15 days to
the office of ADC (D).
(D) Status of llegal sand Mining:
EE, Mining informed that regular Nakas are held at vuinerable road junctions and FIRs are
being registered against the defaulters vehicles carrying illegal mining material, Further,
regular meeting are being taken by the ADC(G) SAS Nagar and the progress being
reviewed there under.
The Chairperson directed the EE, Mining (ater Resources) to ensure that there shall be no
case of illegal mining and if any violations found, the matter may be brought into the
knowledge of DC Office without any lapse. The stone crushers shall be visited as per the
schedule fixed.
(E) Noise Pollution Management Plan:
EE, PPCB brought out that Hon'ble Punjab & Haryana High Court, Chandigarh has issued
fresh directions in the matter of CWP-PIL 32 of 2018 w.r.t. noise pollution and the
relevant part of the orders is as under:
"The Stotes of Punjab, Haryana and Union Territory, Chondigarh are directed to ensure thot the loudspeaker, public address system, musical instrument and sound amplifier are not played during night time except in auditoria, conference rooms, community halls, banquet halls as per norms laid down under the Noise Pollution (Regulation and Control) Rules, 2000. The States of Punjob, Haryana and Union Territory, Chandigarh are directed to ensure that loud speakers or public address systems are not used
between 10.00 pm to 6.00 am, except between 10.00 pm to 12.00 midnight during any cultural or religious festive occasion of a limited duration not exceeding 15 days in all
during a calender year, that too, the noise level shall not exceed 10 dB(A) above the ambient noise standards for the area. The peripheral noise level off a privately owned sound system or a sound producing instrument shall not, at the boundary of the
private place, exceed by more than 5dB(A)."
11
Directorate of Environment and Climate Change has formulated an Action Plan for Control
of Noise Pollution which was placed on record in the meeting for compliance to be made
by the stake holder departments.
The Chairperson directed that as per the Noise Rules, noise complaints may be dealt on
the priority by the authority designated under the above orders as well as under the Noise
Pollution (Regulation & Control) Rules, 2000 (not below the rank of SDM & DSP of
respective subdivision). In specific cases, where noise samples are to measured, help of
PPCB may be taken.
(F) E-Waste Management:
The Hon'ble NGT in Original Application No. 512/2018 has passed the orders dated
12.02.2019, wherein it was directed to check the informal trading, dismantling and
recycling of waste, facilitate collection and disposal of e- waste, Governance frame work
for monitoring compliance, Capacity building at district/State/CPCB level, IEC plan be
firmed up and executed and strengthen system of enforcement. These activities are to be
carried by the District Administration in-coordination with the stake holder departments.
For the effective implementation of the above orders w.rt. E-Waste Management Rules,
2016, a committee at sub divisional level was constituted to check the premises of
kabaris/ scavengers in the district for -waste and shall motivate bulk generators of E-
waste to get their waste lifted from authorized E-waste recycling facilities already
established in the district as under 1. Naib Tehsildar
2. Executive officer of respective MC
3. Representative of the PPCB.
The Chairperson directed to carry out a meeting at Sub-Divisional level to decide
the SOP and the committee shall visit the area for compliance of the same within
15 days.
(G) Stubble Burning:
EE, PPCB informed that meeting in the matter already taken by the worthy Deputy
Commissioner on 05/08/2021 and proceedings shall be sent to stakeholder departments
to act as per Action Plan notified by the Govt. of Punjab.
It is directed to all that above mentioned works cannot be completed by an individual
department and will be accomplished with the joint efforts of all the departments. Directions
given above as well as in the meeting taken by Hon'ble NGT Monitoring Committee shall be
12
complied with in Toto. Further, all the departments are directed to submit the requisite reports
within timelines as mentioned in the proceedings
The meeting ended with vote of thanks to the chair.
M
Additional Deputy çomrhissioner (D) Mohali
ANNEXURE -1
OFFICERS ATTENDED THE MEETING:
Sr. No. Name and designation of the Officer Sanjeev Kumar, DSP, Police Deptt. Sanjay Kanwar, SE, MC SAS Nagar Naveen Kumar, Drainage and Mining Deptt., SDO Dawinder Singh, Drainage and Mining Deptt., JE PS Mavi, Deptt. of Soil & Water Conservation Dr. RK Raheja, Agriculture CA0 Gurdial Kumar, Agriculture ADO Baljinder Singh, EO MC, Banur Sangeet Kumar, EO MC, Kharar
Harpreet Singh, AEE, MC Kharar
1. 2.
3 4. 5
6
7. 8. 9. 10.
11. Jang Bahadur Singh, JE, MC Kharar 12. Surmukh Singh, Superidentent, Department of Food & Civil Supply
13. Jasdeep Singh, Inspector Supply DFSC Office 14. Sukhwinder Singh, SDO, MC Kharar
Harsimran Singh, SDE, DWSS Division No. 3 16. |Himanshu Sandhu SDE, PH
D.S. Bhatia SO, S.RTA., Mohali Jasbir singh, JE, PWSSB, Zirakpur Rajnish Painuly, SDO, PWSSB on behalf of EE, Patiala
15.
17. 18.
19 20 Rahul Kaushal, EE, PWSS Division Ropar 21 Gurpartap Singh, ME, MC Derabassi,
Rishab Garg, Inspt. MC Derabassi Sandeep Singh, SDE, PSIEC Manjit Singh, PWD Central Works Division Mohali (SDE)
25.
22. 23. 24.
Mohit Bisht, AEE, PPCB
Balvinder Singh, Range Officer, SAS Nagar 27. Dr. Renu Singh, ACS, Mohali 28. Ashok Kumar, EO, MC, Lalru
26.
29. Jagjit Singh Solni, EO, MC Nayagaon 30. Krishan Kumar, DDPO, Steno 31. Rajeev Kumar, Xen PWD, Division PWD (B&R)
Annexure-2
Sr. No Town Description Time line to complete work
Zirakpur 17 MLD STP 30.09.2022
2 Derabassi 31.12.2023 2 MLD STP
31.12.2023 2 MLD STP
3 Lalru
I MLD STP 31.12.2022
.5 MLD STP 31.03.2023
0.15 MLD STP 31.12.2022 oasasaaaa.a
0.30 MLD STP 31.12.2022
0.30 MLD STP 31.12.2022 w
4 Banur wwwwwwwwwww www.w. *** ww **
www.aeam wAAw
0.5 MLD STP 31.03.2022 wwww.
0.15 MLD STP 30.09.2022 www.wwwwwww **** ww.w