Australia Telescope. Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope provides world-class observing facilities in radio astronomy for astronomers at Australian and overseas institutions. Facilities. Parkes 64m diameter single dish - PowerPoint PPT PresentationTRANSCRIPT
Decadal Plan UNSW, 17 Dec 2004
Australia Telescope
Operated by CSIRO as a National Facility since 1990As a National Facility, the Australia Telescope provides world-class observing facilities in radio astronomy for astronomers at Australian and overseas institutions.
Decadal Plan UNSW, 17 Dec 2004
Facilities
Parkes– 64m diameter single dish– Operates over many bands in 0.44 - 22 GHz– including the 13-beam 21cm receiver
Compact Array (Narrabri)– Aperture synthesis array of 6 22m dishes, 6km baseline– 1.2 – 1.7, 2.2 – 2.6, 4.4 – 6.7, 8.0 – 9.2 GHz– 16 – 25 and 84 – 106 GHz
Mopra (Coonabarabran)– 22m single dish– 1.2 – 1.7, 2.2 – 2.6, 4.4 – 6.7, 8.0 – 9.2 GHz– 85 - 115 GHz
Decadal Plan UNSW, 17 Dec 2004
Facilities
Long Baseline Array (LBA)– Parkes, Mopra, ATCA– Hobart & Ceduna (U Tasmania)– Tidbinbilla (NASA Deep Space Network)– offshore facilites
Headquarters, LBA correlator and engineering development in Marsfield
Decadal Plan UNSW, 17 Dec 2004
Past decade - Instrumentation
Parkes– 13-beam 21cm receiver– 8GHz receiver and surface upgrade to 54m– Wideband digital correlator– 10/50cm receiver
ATCA– 214m North Spur– 12/3.5mm upgrade
Mopra– 600 MHz digital spectrometer
Decadal Plan UNSW, 17 Dec 2004
Past decade - Science
Pulsar surveys– ~1000 pulsars discovered– Double pulsar
HI surveys– SGPS– HIPASS
Deep radio continuum– Hubble/Chandra deep fields– 20GHz ATCA survey
Decadal Plan UNSW, 17 Dec 2004
Usage - ATCA
Long Baseline Array (LBA)
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
Decadal Plan UNSW, 17 Dec 2004
Usage - Parkes
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
Decadal Plan UNSW, 17 Dec 2004
User Profile
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
Compact Array Parkes
Decadal Plan UNSW, 17 Dec 2004
Publications
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
Decadal Plan UNSW, 17 Dec 2004
Student training
ATNF-affiliated PhD students– Joint University-ATNF supervision– Free accommodation at observatories– Support for page charges and one overseas trip– Top-up scholarships available via CSIRO (~2 per year)
Decadal Plan UNSW, 17 Dec 2004
Student training
Decadal Plan UNSW, 17 Dec 2004
ATNF Developments
The Big FiveNew Technology Demonstrator (NTD)– Part of SKA Roadmap
Compact Array Broadband Backend (CABB)– 512MHz Digital Filter Bank (DFB) operational – 2GHz available @ Mopra by June 2005– 8GHz @ ATCA by Jun 07
» Priority of broadband L/S & C/X upgrade?
Decadal Plan UNSW, 17 Dec 2004
ATNF Developments
The Big Five (continued)Parkes Methanol Multibeam 6 - 6.7 GHz (w/Jodrell Bank)– Preliminary mechanical design complete– Oct 2005 installation
ATCA 7mm system– Construction cost A$6.4M
» 50:50 cost sharing
– Commissioning Q4 2006 (w/CABB: Q2 2007)
Decadal Plan UNSW, 17 Dec 2004
ATNF Developments
The Big Five (continued)eVLBI– All stations network-ready – 512MB/s achieved
» Huygens demo» 31s photon-to-fringe
– Network connections» July 2005?
Decadal Plan UNSW, 17 Dec 2004
Future Strategic Directions
ATCA– Maximise pre-ALMA window-of-opportunity
Parkes– Major survey programs
Mileura– xNTD operations
Australasian LBA– eVLBI network (PKS/ATCA/Hobart/Ceduna/Mileura/NZ)
ATNF– SKA development
Decadal Plan UNSW, 17 Dec 2004
ATNF Issues
Future of MopraExtent of engagement in Virtual ObservatoryManaging 3 sites– Investment in new technology: NBR/PKS v SKA
Remote/queue observingMajor new initiatives– Extend N Spur @ Narrabri?– 20GHz Multibeam/FPA development @ Parkes?
Decadal Plan UNSW, 17 Dec 2004
Future
2005
2006
2007
2008
2009
MOPS
7mm
CABB
6GHz m’beameVLBI eVLBI
20GHz M’beam? NTD
xNTD
Narrabri/Mopra Parkes Mileura
Ext N Spur?FPA?