1 FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MOD DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Systems Engineering Challenges Air Force Systems Engineering Conference 17 August 2011 C. Douglas Ebersole Director of Engineering, F-35 Lightning II Program

Upload: bsweetman56

Post on 04-Oct-2014

1.056 views

Category:

Documents


0 download

DESCRIPTION

Briefing by JSF chief engineer Doug Ebersole

TRANSCRIPT

Page 1: August 2011 JSF brief

1FOR OFFICIAL USE ONLY // REL TO USA, GBR MOD, ITA MOD, NLD MOD, TUR MND, CAN DND, AUS DOD, DNK MOD, and NOR MODDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering Challenges Air Force Systems Engineering Conference

17 August 2011

C. Douglas EbersoleDirector of Engineering, F-35 Lightning II

Program

Page 2: August 2011 JSF brief

2DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Problem Statement

Identify systems engineering challenges to the execution of the F-35 program.

Identify means to mitigate negative impacts through effective systems engineering policy, practices and

people.

Page 3: August 2011 JSF brief

3DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Outline

• Overview of F-35 Program• Systems Engineering Challenges/Mitigations• Workforce Management and Support• Final Thoughts

Page 4: August 2011 JSF brief

4DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

• Key Attributes:– Stealth– Integrated Avionics– A/G Munitions– Intraflight DL– Adv A/C Survivability

• General Features:– Single seat– Speed: 700 kts or 1.6M (630/1.6M STOVL)– Ceiling: 50,000 ft+– Engine: PW F135

• Sensors– Fully integrated open architecture system– A/G – A/A radar/SAR– Electro Optical A/G Targeting system– A/A IRST– Electronic Support Measures (ESM)– Short range EO spherical coverage

F-35 Characteristics

Three Variants: Max Commonality And Interoperability

Length: 51.4 ftWing Area: 460 ft2

Weight (Empty): 29,400 lbInternal Fuel: 18,200 lbRange: 600 + nm

Length: 51.1 ftWing Area: 460 ft2

Weight (Empty): 32,600 lbInternal Fuel: 13,500 lbRange: 450 + nm

Length: 51.4 ftWing Area: 668 ft2

Weight (Empty): 34,900 lbInternal Fuel: 19,700 lbRange: 600 + nm

CTOL(AF)

STOVL(BF)

CV(CF)

Page 5: August 2011 JSF brief

5DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Derivatives and EnhancementsJSF SDD

1990 20351995 2000 2005 2010 2015 2020 2025 2030ASTOVL

MRF

AX

JAST JSFCDP

LRIP

Full Rate Production

Performance Based Global Sustainment

ATA

NATF

System Development and Demonstration

Low Rate Initial Production

F-35 Program At Nexus of Planned Concurrency

F-35 PRECURSOR PROGRAMS:

Advanced Short Takeoff Vertical LandingMulti-Role FighterAdvanced Tactical Aircraft Naval Advanced Tactical FighterAdvanced AttackJoint Advanced Strike Technology / Concept Demonstration Phase

Eglin AFB ITC Operations

FMS

Page 6: August 2011 JSF brief

6DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs,

Refine SystemPerformance Specs &

Environmental Constraints

Page 7: August 2011 JSF brief

7DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs,

Refine SystemPerformance Specs &

Environmental Constraints

Challenge: Maintaining common air system level requirements across broad stakeholder base.Mitigation:JSF Executive Steering Board control of system level requirements.

Page 8: August 2011 JSF brief

8DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs,

Refine SystemPerformance Specs &

Environmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Interpret User Needs, Refine System

Performance Specs &Environmental Constraints

Challenge: Performance Based Acquisition broad definition of system level requirements.Mitigation:Definition of required functional attributes necessary via mission de-comp, use cases, active user engagement, other.

453 Shall Statements

Page 9: August 2011 JSF brief

9DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs, Refine System

Performance Specs &Environmental Constraints

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Challenge:Government oversight of requirements of allocated baseline.Mitigation:Manage to risk. Taking active steps to recover control for identified risk areas.

Example: Helmet Mounted Display System3.2.1.1.1.3.7. The JSF Air System shall provide … and night vision target techniques, including visibility through aircraft structures to execute missions …

Gen II Helmet EODAS sensors HTS DMC-H Required specificity: Visual acuity as function of light conditions End to end system latency

Page 10: August 2011 JSF brief

10DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs,

Refine SystemPerformance Specs &

Environmental Constraints

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Individual CIVerification

DT&E

Challenge:Active management of program risk at lowest configuration item level.Mitigation:Access to program data artifacts, active TPM and risk management

Page 11: August 2011 JSF brief

11DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs,

Refine SystemPerformance Specs &

Environmental Constraints

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Challenge:Concurrent development of multiple air system software builds. Drives close coordination across major system components (flight sciences, mission systems, ALIS, PHM, training systems). Stresses program resources. Mitigation:Broad investment in component and system level test and laboratory infrastructure. Tools to have program level sight picture of all components. Disciplined burndown of SDD success criteria.Example: F-35 Software Build Status

Success Criteria Burndown

Page 12: August 2011 JSF brief

12DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

F-35 Software Build-Up Status

As of 26 July 2011

REQSIT

SC

DEV

REQ

DEV

SIT

SC

On-board SW

Off-board SW

RequirementsREQ

System Integration & Test/ ReworkSITDevelopment Code &Unit TestDEV

Delivery (DD250/Production Readiness)DELSecurity Cert/Govt. AcceptanceSC

Complete

>=95% of Plan

90-95% of Plan

<90% of Plan

SW Phase for each

LRIP fleet release

Fill Level Denotes % CompleteColor Denotes Status to Plan

Software Phase Status against plan

REQ

SIT

SC

REQ

DEV

SIT

SC

REQSIT

SC

Legend Notes• On-board SW includes IPT: MS, VS, PHM Prime SW, Suppliers• Off-board SW includes IPT: OMS, ALIS, AIHM• Color codes based on IPT with lowest status against plan• Relative weighted across requirements, development, SI&T and

SW based on effort

REQ

DEV

SIT

Block 1A(Eglin Ready for Training)

Block 1B(Multi-Level Security,Full Block 1 Avionics)

Block 2A

Block 2B(SW Retrofit)

Block 3 Initial(Tech Refresh 2)

Block 3 Final(Full SDD war-fighting capability, SW Retrofit)

Supplier Dev: 89% Act vs. 92% PlanPrime Dev: 15% Act vs. 36% Plan

AIHM Dev: 39% vs. 47% PlanALIS Dev: 88% vs. 100% Plan

MS Integration: 83% Act vs. 95% Plan

DEV

REQ

DEV

SIT

DEL

REQ

DEV

SIT

DEL

REQ

DEV

SIT

DEL

REQ

DEV

SIT

DEL

REQ

DEV

SIT

DEL

REQ

DEV

SIT

DEL

REQ

DEV

SIT

DEL

DEV

MS Integration: 5% Act vs. 26% Plan

SC

GLOC CTE projecting Aug Start vs May Plan

Page 13: August 2011 JSF brief

13DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

1175 SCs to Be closed

In 2016 and Beyond

Page 14: August 2011 JSF brief

14DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Systems Engineering “V” Pre-Milestone C

Trades

Trades

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

System DT&E, OT&E, LFT&E

& OAs Verify System Functionality & Constraints

Compliance to Specs

Fabricate, Assemble,

CodeUpdate Constraints, &

Cost/Risk Drivers

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

Interpret User Needs,

Refine SystemPerformance Specs &

Environmental Constraints

Combined DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental ConstraintsChallenge:

LRIP production aircraft delivery concurrent to continued SDD execution. Mitigation:Clear definition of incremental system level performance to be delivered with each LRIP lot to execute user mission needs. Example: Block development plan.

Page 15: August 2011 JSF brief

15DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Block Plan: Capabilities / Transition Plan

Includes Proposed “Accelerated” Block 2B Weapons (AF & CF)

NOTE: Block 2B and 3C Fleet Release timing under development (SDD Replan)

LRIP 1 LRIP2 LRIP3 LRIP4 LRIP5 LRIP6 LRIP 7 LRIP 8 +

1B 3C (3F)

Mission Capabilities

Initial TrainingMulti-Level Security

Full Warfighting / Export

Multi-ship Fusion, ORD Compliant

Altitude 40k 50kAirspeed 550 / 450 / -- 700 / 630 / 700

Mach 0.9 / 0.9 / -- 1.6AOA 18 50

G 5.5 / 4.5 / -- 9 / 7 / 7.5 2 AIM-120-C5/7 (A/B/C)2 JDAM (GBU-31) (A/C)

2 JDAM GBU-32 (B)2 GBU-12 Internal (A/B)

* Carriage/Employment Envelope Limited

2B / 3IFleet Release

40K

1.6 / 1.2 / 1.250

7 / 5.5 / 7.5

0.9 / 0.9 / 0.918

Initial Warfighting Basic CAS/Interdiction,

Initial A/A

Ready for TrainingBasic

Nav/Comm/Sensors

40k

0.9 / .8 / --18

5.0 / 4.5 / --

450 / 400 / -- 550 / 450 / 450 700 / 550 / 550

Full SDD WeaponsNo WeaponsWeapons

Enhanced TrainingBasic Mission SystemsInitial MADL, Link 16

40k

1A 2A

5.5 / 4.5 / 4.5

No WeaponsNo Weapons

Page 16: August 2011 JSF brief

16DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

A Bit About Personnel

CSAF Vector: "Improved acquisition performance begins with experienced professionals, using the right analytic tools and processes, all supported by transparent decision-making".

JSF DoE Challenge: Transition Engineering Community of Practice from one that “Reviews and Reports” to one

that “Engages and Influences”

• Current F-35 Engineering Workforce– 765 Engineers across numerous work sites representing 83 specific competencies

• Feb-Jun 11 we completed 100% audit of all spaces/75% of faces– Resulted in need to re-align workforce competencies and re-assign personnel– Committed to stand up FTW JPO engineering presence– Identified the requisite data and artifacts required for staff to meet expectations

• Transition of workforce to be accomplished throughout FY12

Page 17: August 2011 JSF brief

17DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Closing Thoughts

• VADM Venlet’s commitment to program execution coming out of the N-M re-certification.– Realism in planning– Transparency in all we do– Program grounded in disciplined systems engineering

• It’s not hard … it’s not free … but it requires discipline and commitment

• For most—simply follow your SEP– Systems Engineering Technical Reviews critical

• Enables “gated” approach to program execution

Page 18: August 2011 JSF brief

18DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Effective Use of SETR as Program Gates

Page 19: August 2011 JSF brief

19DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.