atwood improvement presentation july 2016

12
Welcome to Atwood Lake Park Master Plan Update Please hold questions until after the presentation is complete. MWCD Staff will be available at the stations set up around the room.

Upload: vuongdan

Post on 11-Jan-2017

215 views

Category:

Documents


1 download

TRANSCRIPT

Welcome toAtwood Lake Park

Master Plan Update

Please hold questions until after the presentation is complete. MWCD Staff will be

available at the stations set up around the room.

Chief of Recreation‐Scott Barnhart Deputy Chief of Parks‐Joe McGlothlin Deputy Chief of Projects‐Tony Luther Park Manager‐ Aaron Stump Recreation & Park Planner‐

Eric Stechschulte

Introductions

Director of Administrative Services Barbara Bennett

Assistant Chief Engineer‐Mike Rekstis

Program Manager Consultant‐Ken Ricker, MS Consultants

2013 2014 2015 2016

Master Plan Timeline

• Woolpert completes  overall conceptual master plan

• MWCD Board of Directors approves master plan in October

• Recreation Department prioritized projects

• Completed branding and design guidelines 

• Utilities survey & inventory completed at each park

• MS Consultants contracted as MWCD Project Management Consultant

• Aerial topography surveys completed

• 6 Individual Park Designers contracted and began refining preliminary designs on each park

• Individual Park Designers complete preliminary designs for each park

• Individual Park Designers begin detailed design on campground projects

• First campground park projects will be bid out and construction to begin in late 2016

Project Prioritization  Transitional Seasonal Camping Areas Infrastructure Stand Alone Projects

Atwood Lake ParkProject Phasing Strategy

Atwood Lake ParkProject Phasing Strategy

Atwood Lake ParkApproved ProjectsFUNDING‐ $18,500,000 Dollars

Beach Seawall‐Complete 2015 Trail construction, Phase 1‐Complete 

2016 Trail and Bridge ‐ Phase 2‐Complete 2016 Welcome Center‐Complete 2016 Amphitheater Trail Lighting‐ Complete 

2016 New Transient RV Campground ‐ Area 20 

(142 Lots)‐Scheduled 2017 Completion Sanitary Sewer ‐Main and Pump Station‐

Scheduled 2017 Completion Event Parking Improvements & New 

Dump Station‐ Area 2 & 17‐Scheduled 2017 Completion

Event Parking Improvements‐ Leveling / Drainage 3A‐Scheduled 2017 Completion

New Electric Main‐Scheduled 2017 Completion

New Seasonal RV Campground ‐ Area 4 (28 Lots)‐Scheduled 2018 Completion

Seasonal RV Campground ‐ Area 8 (78 Lots)‐(Current Area A) Scheduled 2018 Completion

New Gas Main‐Scheduled 2018 Completion

Seasonal Camper TemporaryMoving Transition Plan

MWCD is committed to providing assistance by moving your camper, deck and dock to your temporary site, and then moving them back to your newly renovated area.

Seasonal Campers will be notified by letter this fall regarding their temporary move scheduled for the end of the 2017 camping season. 

Seasonal Campers will receive a checklist that will address procedures for moving their camper, deck and dock. 

Seasonal Campers relocated in the fall of 2017 will be moved back to their newly renovated area in Fall of 2018.

New Shower/Restroom Building in Map Area 4 and Area 20

Proposed Seasonal Camping Lot Layout

Atwood Lake ParkAmenity Pictures

Master Plan Budget

*Chart based on information from: http://www.macrotrends.net/1369/crude-oil-price-history-chart

Crude Oil Prices 2013-June 2016

The Master Plan is being funded through responsible  stewardship of oil and gas resources.

In October of 2013 the MWCD Board of Directors approved the Master Plan.

$120 Million Dollars have been dedicated to Master Plan Projects over the next several years.

Atwood Lake Park Future ProjectsFUTURE PROJECTS AS FUNDING BECOMES AVAILABLE Seasonal Campground Renovation‐ Area 12 (84 Lots)

(Current Area F) Seasonal Campground Renovation‐ Area 9 (50 Lots) 

(Current  Areas B & C) Seasonal Campground Renovation‐ Area 10 (84 Lots) 

(Current Areas  D & E) Seasonal Campground Renovation‐ Area 16 (25 Lots) 

(Current Area 4) Seasonal Campground Renovation‐ Area 13 (17 

Lots)(Current Area 1) Activities Area (Splash Pad, Ropes Course, Putt‐putt, 

Game Courts)‐ Area 5 Recreation Center, Parking & Turn Around‐Area 6 Beach Area‐Boardwalk, Gazebo, Trails, Sand Volleyball 

– Area 7 Causeway Trail and Road Upgrade‐ Area 11 Seasonal Campground Renovation‐ Area 14 (44 

Lots)(Current Areas 2 &3) Picnic Area Renovation‐Area 18 New Transient Campground ‐ Area 19 (52 Lots) Amphitheater Expansion & Redevelopment‐ Area 21 Boaters Beach Upgrades‐Area 22 Camper Activity Center Renovation‐Area 3 Cabin Area Renovations‐ Area 23 Primitive Campground & Roadway Development‐ Area 

24 Lookout Improvements & New Zip Line‐ Area 25 New Group Campground‐ Area 26 New Cabins‐ Area 27 (10 Cabins) Maintenance Area Expansion‐ Area 30 Roadway & Trailhead‐ Area 31

2

MUSKINGUM WATERSHED CONSERVANCY DISTRICT | ATWOOD LAKE PARK PRELIMINARY DESIGN

Atwood Lake Park Overall Preliminary Plan

Thank You!Individual questions will be

answered at the stations around the room.