Page 1: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

ATTRACT Implementation

November 3rd 2015 meeting CERN

By Pablo G. Tello (KT CERN)

1www.attract-eu.org

Page 2: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

• Part 1• ATTRACT: what has been proposed to EC?

• Part 2• Present status of ATTRACT

• Part 3• Planning for the submission to H2020INFRAINNOV-1-2017

Presentation overview

2

Page 3: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

3

ATTRACT: What has been proposed to

EC?

Page 4: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

• ATTRACT is a new, open, pan-EU initiative to accelerate the development of high-performance detector and imaging technologies.

• It involves European Research Infrastructures (ERIs), European research institutes and RTOs, small and medium enterprises (SMEs), companies, universities and business and innovation specialists.

What is ATTRACT?

4

http://www.attract-eu.org/

Page 5: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

• Developing next generation scientific instrumentation in detection & imaging.

• Creating industrial/market opportunities through co-innovation and innovation experts.

Because developing cutting-edge scientific instrumentation within a co-innovation ecosystem approach generates new industrial and societal value (applications, products, business, markets, etc)

What is ATTRACT main target and rationale?

5

Page 6: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

• ATTRACT aims to fully capture the potential of actors and technologies under the paradigm of co-innovation.

• Co-innovation: All stakeholders are involved in a collaborative approach towards the definition and process of goal-setting and the continuous evaluation and exploitation of opportunities (win-win scenario).

What ATTRACT proposes as a new paradigm?

6

Page 7: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

• Develop long term R&D&I partnerships between ERIs, Industry and Innovation specialists in detection and imaging technologies.

• Propose a co-innovation model to continuously generate, scale and deploy breakthrough technologies with market and social value.

• Ramping up ATTRACT within the Horizon 2020 programme towards a self-sustained model that will balance public and private interests and investments beyond 2020.

What are the challenges?

7

Page 8: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

What is the overall envisioned implementation route?

8

FPA: Framework Partnership Agreement

Note: Proposed to EC 19/02/2015

Page 9: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

“Mini-ATTRACT” phases 1 and 2

9

Phase 1 (2016-2017): Research and Innovation Action (12 M Euros EC funding) with autonomy to launch open calls with the following objectives:

• Identification of a wide spectrum of technology opportunities with breakthrough potential across the 28 EU Member States and Associated Countries.

• Assessment of the feasibility and scalability of the identified opportunities.• Selection and clustering of those opportunities with a clear potential for industrial

implementation (transition towards phase 2).

Phase 2 (2017-2020): Candidate FPA (40 M Euros) with autonomy to launch open calls with the following objectives:

• Continuation with the selected opportunities from phase 1 towards industrial applications having societal value.

• Advancement towards a strategic model for a sustainable ATTRACT initiative.

Page 10: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

“Mini-ATTRACT” phases 1 and 2: targeted results

10

Phase 1• A wide scope of technologies with breakthrough potential

(TRL 2 to 4).• Selection process based on industrial scalability and social

added value.

Phase 2• Scalability of phase 1-selected technologies towards

industrial deployment (TRL 5 to 9).• Construction and establishment of a self-sustained initiative

(“Maxi” ATTRACT).

Page 11: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

“Mini-ATTRACT” phases 1 and 2: targeted impact

11

• Increased capacity to generate, absorb and use new technology in Europe.

• Enhanced innovation capability of ERIs.

• Generated specific market opportunities for industry and different funding bodies and organizations.

• Translated technological opportunities into industrial and societal value and jobs.

• Acquired momentum and experience for the transition towards “Maxi” ATTRACT.

Page 12: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

12

“Mini” ATTRACT phase 1: draft governing proposal

EC

Independent R&D&I Committee (IC)

Project Advisory Committee (PAC)

Call for nominations

Project Administrative Office

(PAO)

Call for nominations

Project Consortium Board(PCB)

Contact with EC

Work Packages structure (see slide 27 onwards)

Administrative Support

Page 13: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

13

“Mini” ATTRACT phase 1: main features

Governance

• Small consortium (up to 10 partners) and consisting of entities with proven skills and capacity to reach out and activate actors and organizations at pan-European level.

• Project Management costs limited to 10% of EC contribution to be shared among all consortium partners. 90% of EC budget for funding open calls. If all partners agree CERN can coordinate the project.

• Nomination of a Project Advisory Committee (PAC).

• PAC launches a call to nominate an Independent R&D&I Committee (IC).

• IC decides on topics for open calls and evaluation (= the project is NOT consortium biased).

• Consortium only offers Management support through the Project Administrative Office (PAO).

Page 14: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

14

“Mini” ATTRACT phase 1: draft operational proposal

Page 15: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

15

“Mini” ATTRACT phase 1: main featuresOperational

• Open calls themes and evaluation by the Independent R&D&I Committee (IC).

• Open calls based on breakthrough challenges in detection and imaging technologies.

• Different projects granted per challenge with value between 100 to 300 kEuros: main objective is to “explore” the EU landscape for breakthrough technologies.

• Short proposals and “lump sum” concept for each project encouraging SME participation.

• Full transparency of evaluation results and experts evaluation (open accessible documentation).

• Project Administrative Office (PAO) only plays a logistic and admin supporting role.

• IC monitors project R&D&I deliverables and finally decides which ones will continue to be funded in “Mini” ATTRACT phase 2.

Page 16: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

16

“Mini” ATTRACT phase 2: draft governing proposal

EC

Independent R&D&I Committee (RDIC)

Executive Committee (ECM)

Elects

Management Office(MO)

Call for nominations

General Assembly(GA)

Administrative Support

Contact with EC

Page 17: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

17

“Mini” ATTRACT phase 2: main featuresGovernance

• Constitution of a General Assembly (GA) composed of representatives of all organizations participating in phase 2.

• Main role of GA is steering the preparation for “Maxi” ATTRACT.

• Election of an Executive Committee (ECM) by the GA for the executive supervision of phase 2.

• ECM nominates a Management Office (MO) for daily management and administration of phase 2.

• ECM launches a call to nominate an Independent R&D&I Committee (RDIC).

• RDIC decides on topics for open calls and evaluation (= the project is NOT consortium biased).

• MO is established as an Independent Legal Entity (see next slides).

Page 18: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

18

“Mini” ATTRACT phase 2: draft operational proposal

Page 19: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

19

“Mini” ATTRACT phase 2: main featuresOperational

• Management Office (MO) becomes an Independent Legal Entity acting on behalf of the ATTRACT GA to sign the Framework Partnership Agreement (FPA) with EC as well as the Special Grant Agreement (SGA).

• Open calls themes and evaluation by the Independent R&D&I Committee (RDIC).

• Open calls based on breakthrough projects in detection and imaging technologies selected on phase 1.

• Encouragement for new organizations to join the projects.

• Different projects granted per challenge with value in the order of x M Euros: main objective is to achieve industrial deployment.

• Short proposals and “lump sum” concept for each project encouraging SME participation.

• Full transparency of evaluation results and experts evaluation (open accessible documentation).

• RDIC monitors project R&D&I deliverables and finally decides which ones will continue to be funded in “Mini” ATTRACT phase 2.

• MO as Independent Legal Entity ensures transparency in management process.

Page 20: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

20

“Mini” ATTRACT phase 2: draft governing proposal

Evolution of governing structure and bodies from “Mini” ATTRACT phase 1 to 2.

Page 21: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

21

Current status of ATTRACT

Page 22: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

22

H2020 call

• The dialogue with the EC has resulted in a call in the next H2020 Draft Work Programme (Research Infrastructures) that would permit a Pilot Demonstration of “Mini” ATTRACT.

• Call: INFRAINNOV-1-2017 – Fostering co-innovation for future detection and imaging technologies.

• Budget up to 20 M Euros; call deadline 29/03/2017.

• Call text refers to many elements to allow implementing “Mini” ATTRACT phase 1.

Page 23: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

23

Main challenges ahead

• Organize ourselves effectively and proactively to collaborate for submitting a strong proposal.

• Translate the implementation vision for “Mini” ATTRACT phase 1 into the typical format of an EU project for submission.

• Deliver clear results and measure their impact.

• Continue the dialog with the EC towards an FPA for “Mini” ATTRACT phase 2 or a more convenient governing structure.

• Continue the dialogue with EC and other funding organizations and communities towards a sustainable “Maxi” ATTRACT.

Page 24: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

24

Immediate work

• Develop a Project Advisory Committee (PAC) for the Core Consortium based on the current, ad hoc ATTRACT Advisory Board chaired by prof. John Wood.

• Identify a list of candidates that can be part of the Independent R&D&I Committee (IC) chaired by Dr Sergio Bertolucci which reports to PAC.

• Identify and agree on a list of scientific/technological challenges on detection and imaging technologies that can be part of the open calls.

• Nominate contact person(s) from each organization able to follow and work in the submission process.

• Agree on a first face-to-face one day meeting to build the proposal to respond to the EC call with Consortium partners.

Page 25: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

25

Planning for the submission to H2020INFRAINNOV-1-

2017

Page 26: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

26

o The following slides summarize first thoughts on how to “translate” “Mini” ATTRACT phase 1 proposal into the required format of an EU project (template).

o Work Packages (WPs) and main activities associated to the phase 1 proposal are described here on a general level (details yet to be defined).

o The “core” of the proposal – i.e. the selection and funding of R&D&I projects on detection and imaging technologies is not described here.

o The main purposes of the slides are:o Start with an initial WP structure and linked activities for the proposal, which is to be

discussed, modified and agreed before submission.o Identify which organizations can lead the different WPs and/or linked activities.o An initial material to be discussed during the first face-to-face meeting to start the

process of submitting the “Mini”-ATTRACT project proposal to the EC call.

Page 27: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP2 Industrial Liaison

WP3 Business, Public/Private

Investment Liaison

WP7 R&D&I Projects Monitoring

WP4 Academia,

RTOs Liaison

WP6 Innovation, Knowledge & Technology Transfer WP9 Project

Evaluation

WP8 Project Dissemination & Outreach

WP5 ERIs

Liaison

WP1 Project

Management &

Administration

Draft Pert Diagram with main WPs interdependencies(WP structure emanating from “mini” ATTRACT phase 1

Page 28: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP1 Project Management & Administration

Main Linked activities

• Act as unique contact point with the EC for project administration and management.

• Management, Administration and overall coordination of the project.

• Support to the Project Advisory Committee (PAC) in the process and constitution of the independent R&D&I committee (IC).

• Organization of the logistics and process of the open calls (rules, templates, electronic submission, documentation, etc) in liaison with the EC.

• Assist the IC in the logistics for the evaluation and selection of projects (process, documentation, etc).

• Administrative and budgetary monitor and control of the awarded projects.

• Provision of legal support.

• Control and monitor and contribution of the project deliverables and milestones.

• Supervision of the activities of the different WPs.

• Collaborate with WP9 (Evaluation) and EC to prepare for “Mini” ATTRACT phase 2.

Page 29: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP2 Industrial Liaison

Main linked activities

• Provide candidates for the constitution of the independent R&D&I committee (IC).

• Stimulate the participation of business and industrial organizations in the open calls.

• Collaborate with WP6 for the facilitation of Innovation, Knowledge and Technology Transfer (i.e. contacts, personal meetings, etc) and specially towards SMEs.

• Provide input to WP8 (i.e. speakers, specialists, etc) on dissemination and outreach events.

• Provide input for WP9 (Evaluation).

• Elaborate input on the value of the project for the business and industrial communities to be included in the final evaluation report.

Page 30: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP3 Business, Private/Public Investment Liaison

Main linked activities

• Provide candidates for the constitution of the independent R&D&I committee (IC).

• Stimulate the participation of public/private investment organizations in open calls.

• Collaborate with WP6 for the facilitation of Innovation, Knowledge and Technology Transfer (i.e. contacts, personal meetings, etc) and specially towards VCs, business angels, EIB, etc.

• Provide input to WP8 (i.e. speakers, specialists, etc) on dissemination and outreach events.

• Provide input for WP9 (Evaluation).

• Elaborate input on the value of the project for the public/private investment communities to be included in the final evaluation report.

Page 31: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP4 Academia, RTOs Liaison

Main linked activities

• Provide candidates for the constitution of the independent R&D&I committee (IC).

• Stimulate the participation of Academic, Research and Technology Organizations (RTOs) and national/European ERIs organizations in the open calls.

• Collaborate with WP6 for the facilitation of Innovation, Knowledge and Technology Transfer (i.e. contacts, personal meetings, etc) and specially towards SMEs.

• Provide input to WP8 (i.e. speakers, specialists, etc) on dissemination and outreach events.

• Provide input for WP9 (Evaluation).

• Elaborate input on the value of the ATTRACT project for the Academic, RTOs and national/European ERIs communities to be included in the final evaluation report.

Page 32: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

Main linked activities

• Provide candidates for the constitution of the independent R&D&I committee (IC).

• Stimulate the participation of national/European ERIs organizations in the open calls.

• Collaborate with WP6 for the facilitation of Innovation, Knowledge and Technology Transfer (i.e. contacts, personal meetings, etc) and specially towards SMEs.

• Provide input to WP8 (i.e. speakers, specialists, etc) on dissemination and outreach events.

• Provide input for WP9 (Evaluation).

• Elaborate input on the value of the ATTRACT project for the national/European ERIs communities to be included in the final evaluation report.

WP5 ERIsLiaison

Page 33: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP6 Innovation, Knowledge & Technology Transfer

Main linked activities

• Facilitate the Knowledge and Technology Transfer of projects output among the project partners and/or external ones.

• Provide legal and administration assistance in the process.

• Elaborate project technology and scientific instrumentation factsheets to facilitate dissemination and KT.

• Liaise with their counterparts of other organizations in the process.

• Elaborate a report for an Innovation, Knowledge and Technology transfer model for “Mini” ATTRACT phase 2 based on project experience.

• Collaborate in dissemination events especially those related to Innovation, Knowledge & Technology Transfer.

Page 34: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP7 R&D&I Projects Monitoring

Main linked activities

• Support the independent R&D&I committee (IC) on thematic for the open calls.

• Monitor the R&D&I progress and output of the awarded projects in collaboration with the IC and PAC.

• Establish a mechanism for close follow-up and monitoring as well as intervene when necessary with corrective measures specially in coordination with WP1.

• Provide input specially to WP6 for facilitating Innovation, Knowledge and Technology Transfer.

• Collaborate in dissemination events.

Page 35: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP8 Project Dissemination & Outreach

Main linked activities

• Design an infrastructure and logistics for dissemination and outreach (website, materials, etc).

• Design dissemination and outreach materials based on input from other WPs.

• Organize Innovation, knowledge and technology transfer events especially in collaboration with WP6.

• Elaborate event reports.

Page 36: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

WP9 Project Evaluation

Main linked activities

• Elaborate periodic evaluation reports especially based on input from WP6 and WP7.

• Elaborate a set of Key Performance Indicators (KPIs) based on input from other WPs, the PAC, the IC, project consortium and eventually other stakeholders.

• Elaborate a final project evaluation report with input from other WPs, the PAC, the IC, project consortium and eventually other stakeholders based on KPIs.

• Collaborate with WP8 (Dissemination and Outreach) to distribute the final evaluation report to EC, R&D&I public and private communities, private/public funding organizations and other relevant stakeholders.

• Coordinate with EC for the preparation of an FPA for “Mini” ATTRACT phase 2 in collaboration with WP1.

Page 37: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2017 2018

ATTRACT project EC mid-review

ATTRACT project EC end -review

Start ATTRACT Final project admin report

Finish mid ATTRACT project admin report

Launch open calls

Projects start

Projects mid term reviewProjects final review

Selection of projects

2nd KT, Scientific, Industrial, Business

and Investors Workshop

3rd KT, Scientific, Industrial,

Business and Investors Workshop

1st KT, Scientific, Industrial,

Business and Investors Workshop

ATTRACT General Meeting

ATTRACT General Meeting

ATTRACT General Meeting

ATTRACT consortium kick-

off meeting

R&D&I and Admin Monitoring of Projects (projects duration 12 months)

2 months submission

period

“Mini” ATTRACT phase 2 FPA strategy and model ready

Selection projects “Mini” ATTRACT

phase 2

Second open call (optional)

Evaluation submitted projects

EC call deadline:29 Mar 2017 Assumption: ”Mini”-ATTRACT starts July 2017

2019

Page 38: ATTRACT Implementation November 3 rd 2015 meeting CERN By Pablo G. Tello (KT CERN) 1

38

Thanks and questions