Attachments Table of Contents: Attachment Description A1 Map 1 1:25,000 Location Map A1 Map 2 Location of WWTP A1 Map 3 Site Layout B1 Map 4 Agglomeration Boundary B2 Map 5 Location of WWTP B3 Map 6 Location of Primary Discharge Point B4 Map 7 Location of Secondary Discharge Point B5 Not Applicable B6 Part 8 Planning B7 Not Applicable B8 Fees - Letter B9 Not Applicable B10 Not Applicable B11 Not Applicable C1 Map 8 Location of WWTP C1 Drg 1 Schematic Showing Treatment Plant Process D1 Monitoring Information on Influent Samples D2 Discharge Point E2 Details of Sampling results from Response Engineering E2 Details of Accreditation or Certification of Analysis E3 Monitoring & Sampling Points E4 Sampling Data F1 SWRBD Status Report F2 Abstraction Point F2 Lee Catchment & Risk Assessment G1 Not Applicable G2 Not Applicable G3 Not Applicable G4 Not Applicable Online Data Online Data submitted to the EPA including Annex For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 27-07-2013:00:28:25

Upload: others

Post on 09-Oct-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

Attachments Table of Contents: Attachment Description A1 Map 1 1:25,000 Location Map A1 Map 2 Location of WWTP A1 Map 3 Site Layout B1 Map 4 Agglomeration Boundary B2 Map 5 Location of WWTP B3 Map 6 Location of Primary Discharge Point B4 Map 7 Location of Secondary Discharge Point B5 Not Applicable B6 Part 8 Planning B7 Not Applicable B8 Fees - Letter B9 Not Applicable B10 Not Applicable B11 Not Applicable C1 Map 8 Location of WWTP C1 Drg 1 Schematic Showing Treatment Plant Process D1 Monitoring Information on Influent Samples D2 Discharge Point E2 Details of Sampling results from Response Engineering E2 Details of Accreditation or Certification of Analysis E3 Monitoring & Sampling Points E4 Sampling Data F1 SWRBD Status Report F2 Abstraction Point F2 Lee Catchment & Risk Assessment G1 Not Applicable G2 Not Applicable G3 Not Applicable G4 Not Applicable Online Data Online Data submitted to the EPA including Annex

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 2: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

NOTES

3. This drawing is to be read in conjunction with all otherWWDC drawings.

Date:December2009

DI'QlII1 by.O.C

N. O'KEEFFE. B.E••

COUNTY ENGINEER,

COUNTY HALL.

CORK.

SuM)'8d by.O.C

01ecked by.MD

Al- Map 1

Location MapAttachment Al - Map 1

Ag abu ogueWastewater Discharge

Certificate Application

Cork County Council,Southern Division.

IlnIll Su.. Chkd

2. This drawing is to be read in conjunction with theWWDC Application.

1. Dimensions are not to be scaled from drawing.For any discrepancies found consult with the design office.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 3: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

-bJ'o.c

Rlw:-December 2009

N. Q'KEEFFE, az.,COONTY ENGINEER,

COONTY HAL!.,

caRK.

--Cork County Council,Southern Division.

IDrwllan IChIId

Job TiHe:Aghabullogue

Wastewater DischargeCertificate Application

Drawing Tille:Site Location

Attachment AI - Map 2

1. Dimensionsare not to be scaledfrom drawing.Forany discrepancies foundconsult with the design office.

2. This drawing is to be read in conjunction with theWWDCApplication.

3. This drawing is to be read in conjunction with all otherWWDC drawings.

NOTES

IltII9*l bJ' IllIed<od bJ'T.O.H MD

Al- Map 2

_ 191...,.b>1:5ooo@ A3 o.c

,..

CLONMOYLE

DROMAT!MORE

-Aghabullague Creamery

lJ

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 4: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 5: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

-bJ'o.c

Rlw:-December 2009

N. Q'KEEFFE, az.,COUNTY ENGINEER,

COUNTY HAL!.,

CORK.

--

B1-Map4

Cork County Council,Southern Division.

IDrwllan IChIId

Job TiHe:Aghabullogue

Wastewater DischargeCertificate Application

Drawing Tille:

Agglomeartion BoundaryAttachment B1- Map 4

1. Dimensionsare not to be scaledfrom drawing.Forany discrepancies foundconsult with the design office.

3. This drawing is to be read in conjunction with all otherWWDC drawings.

2. This drawing is to be read in conjunction with theWWDCApplication.

NOTES

_ 191...,.b>1:5ooo@ A3 o.c

IltII9*l bJ' IllIed<od bJ'T.O.H MD

,..

CLONMOYLE

-Aghabullague Creamery

CJ

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 6: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

DJlIllI1 by;DC

Date:December2009

Rev:

N. O'KEEFFE. B.E••

COUNTY ENGINEER.

COUNTY HALL.

CORK.

SUrwyld by;DC

01ecked by;MD

B2 - Map 5

Cork County Council,Sothern Devision,

IlnIn Su", Chkd _ ~

Job TItle:Aghabullogue

Wastewater DischargeCertificate Application

Drawing TItle:

Location of WWTPAttachment B2 - Map 5

3. This drawing is to be read in conjunction with all otherWWDC drawings.

1. Dimensions are not to be scaled from drawing.For any discrepancies found consult with the design office.

NOTES

Aghobullogue

Upstream Sampling Point(144729E, 77536N)aSW01u

Primary Discharge PointSW01 - Aghabullogue(144713E, 77487N)

Inlet Screening

Inlet Manual

Manhole 1

All in One Treatment Plant(Primary Settlement, SludgeStorage, Biological Treatment& Final Clarifier)

Storm

Inlet FlowMeasurement

ScaLe 1:2500

~'t\=:;=\=~hr===;~~es~tt;t~~:jj=1~]j n~rt---::;;~"""'-j::t:::::=J~~~~~~~~:-=E~::::::::t--=rsrr~-t-~ 2. This drawing is to be read in conjunction with theWWDC Application.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 7: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 8: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 9: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

Cork County CouncilReport under Article 134 of the

Local Government (Planning and Development) Regulations, 1994

Sewage Treatment Plant at Aghabullogue

Notice in respect of the above was published in the Irish Examiner dated 25U1 August2001 in accordance with Article 131 of the Local Government (Planning andDevelopment) Regulations, 1994.

(a) Nature and Extent of the Proposed Development

The construction of a Sewage Treatment Plant to treat domestic sewage fromAghabullogue.

(b) Implications with respect to Planning and Development of the Area

The proposed development is in compliance with the provisions of the 1996CDP and in accordance with the proper planning and development of thearea.

(c) Submissions and Observations received

The closing date for the receipt of submissions and observations was 10th

October 2001.

Submissions were received from the Chief Planning Officer of Cork CountyCouncil, from the Southern Health Board and from the South WesternRegional Fisheries Board.

(d) Issues raised in the submissions / observations received and Cork CountyCouncil's responses thereto.

I Issues Raised IResponse

Brendan Kelleher, Chief PlanningOfficer

I confirm that the proposals are inaccordance with the proper planning anddevelopment of the area. Aghabullogue No comment required.is a designated settlement in the 1996

ICounty Development Plan. The proposed! treatment plant will help to achieve the

objective of accommodating morehousing in the village.

C,'JlData'Sewcrage\Aghabul1ogc\Part Tell Report 011213.doc Page 1 of 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 10: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

SOUTHERN HEALTH BOARD

Following inspection of the site there areno objections to the above proposedwastewater treatment plan. DrinkingWater sources in the area should bedetermined to be not affected bydevelopment and comply withseparation distance regulations.

SOUTH WESTERN REGIONALFISHERIES BOAIW

Thank you for forwarding details of theproposed Waste Water Treatment Plantto serve Aghabullogue. It is proposedthat effluent from the waste watertreatment plant will ultimately dischargeto the Delehinagh River, a valuablesalmonid spawning and nursery water,While the Board welcomes all proposalsto improve waste water treatmentfacilities, it also feels that allimprovements should at least investigatethe need for the use of the best availabletechnology. In this instance the Boardfeels that there is an onus on the Council(in light of the Phosphorous Regulations)to ensure that the proposed developmentdoes not cause a deterioration in theDelehinagh River in terms of itsphosphorous concentrations and trophicstatus. To this end the Board feels thatthe Council should firstly carry out astudy determine the current trophicstatus of the river and based on thispredict the impact of the proposed

I WWTP. The Board would ask to beI informed when this, information is

available.

There is a similar proposal to upgradeRylane Sewerage Treatment Works,which will also ultimately discharge to

Ithe Delehinagh River. In t.hiS context theBoard feels that time is optimum that to

I develop a management plan for the river

C:'JiDal.:l\Sllw(!rnge\A/jh~bulloge.\Pl1rtTenReportOI1213.dr)c

This was done during the developmentof the proposal. The replacement of theexisting septic tank by this proprietarytreatment unit will improve the existingsituation.

The proposal IS to replace an existingseptic tank treatment plant for theCouncil's Housing Estate, by a largermore effective modern plant to treatsewage from the overall village.

Even though the population IS

significantly less than that set out in theUrban Wastewater Regulations beforephosphorus removal is required (250 inAghabullogue, whereas the minimum forP removal in the Regulations is 10,000), amore extensive study of the DelehinaghRiver was undertaken by Dixon.Brosnanon the Council's behalf.

This report recommended;

Section 11.3 that the BOD should be <20,Section 11.5 that the SS should be < 25,Section 11.6 that the total P should be <3and the mtho-phosphate should be <1.

Page 2 of 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 11: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

which will define development limits forboth Rylane and Aghabullogue in thecontext of sustainable development andthe assimilative capacity of the river.

(e) It is proposed to proceed with the above development includingphosphorus removal. Suitable treatment technologies for phosphorusremoval on such a small scale will be identified and assessed over the nextfew months.

This report is submitted to the Members of Cork County Council in the course ofcompliance with Section 2(7) of the City and County Management (Amendment) Act1955.

Donal Barrett

Divisional Manager

c:vmala\Scwerage\Aghnbulloge\Parl TenReportOlI213.dOl:

December 14u\ 20tH

Page 3 of 3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25

Page 12: Attachments Table of Contents · Microsoft Word - Attachments Table of Contents.doc Author: broleary Created Date: 12/16/2010 2:15:41 PM

Environmental Directorate,Inniscarra, Co. Cork.

Tel. No . (021 ) 4532700 • Fill[ No . (02 1) 4532727

Web: www.cotkroco.ie

An StiUrtb6ireacht Comhshaoil,Inis Cara, Co. COl'caigh.

FOOl (021) 4532700 • FaiCSl (021) 4532727Swomh Gdasainl www.oorkcoco.ieMr. Frank Clinton,

Program Manager,Office of Climate, Licensing & Resource Use,Environment Protection Agency,Headquarters,PO Box 3000,Johnstown Castle Estate,County Wexford.

Comhairle Contae ChorealCork County Council

16th December, 2009

Re: Waste Water Discharge (Authorisation) Regulations 2007 - fees payable inrespect of applications to be submitted by 22Dd December, 2009.

Dear Mr. Clinton,

I refer to the 72 certificate applications and 3 discharge authorisation licence applicationswhich will be submitted by the council under the above regulations before the 22nd

December next.

I note that the fees payable in respect of these applications amount to €246,000 and referyou to our letter of 7th November 2008 (sent by Ted O'Leary, Senior Executive Officer)seeking a rebate/reduction, as is provided for under Art 38 (3) of the regulations. I notethat since that letter the council has paid a further € 570,000 in applications fees meaningthat the total amount paid by the council to date amounts to € 1,245,000.

As you will appreciate, in the current economic climate, the amount payable in respect ofthis final batch of applications is a significant sum that was not budgeted for in 2009.Moreover we have paid a substantial amount in fees already and have made our case for areduction/rebate. Accordingly, I must advise that we are not submitting payment inrespect of these applications as we anticipate the rebate due to the council exceeds thefees payable.

Louis Duffy,Director of Service,Environment & Emergency Services Direetorate

(.Recycled

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 27-07-2013:00:28:25