atmos energy...atmos energy april 8, 2014 ms. polly mcdonald director, pipeline safety division...

9
ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe Atmos Energy Mid-Tex Division 's Di stribution Facilities Replacement Co mpletion Report by System ID pursuant to the requirements of Railroad Commission of Texas 16 TAC 8.209, we became aware ofthe omission of several System IDs that should have been li sted along with applicable replacement fi gures. Essentially, the last 15 towns were in advertently excluded. We have prepared an updated Completion Repmt by System ID that includes all applicable System IDs and associated replacement fi gures. Please fmd the updated repmt in cluded with this correspondence. Totals and summary figures reflected in our prior submittal did include the replacement activity that took place under the omitted System IDs. Those figures were not impacted by thi s omission, and do not require updating at this time. We have included them wi th this conespondence for referenc e. We appreciate your review and acceptance of this conection. Sincerely, Jeff Knights Vice President, Teclmical Services, Mid-Tex Enclosures (2)

Upload: others

Post on 10-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

ATMOS energy

April 8, 2014

Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas

Ms. McDonald:

During a review of our prior submittal ofthe Atmos Energy Mid-Tex Division's Distribution Facilities Replacement Completion Report by System ID pursuant to the requirements of Railroad Commission of Texas 16 TAC 8.209, we became aware ofthe omission of several System IDs that should have been listed along with applicable replacement figures. Essentially, the last 15 towns were inadvertently excluded.

We have prepared an updated Completion Repmt by System ID that includes all applicable System IDs and associated replacement figures. Please fmd the updated repmt included with this correspondence.

Totals and summary figures reflected in our prior submittal did include the replacement activity that took place under the omitted System IDs. Those figures were not impacted by this omission, and do not require updating at this time. We have included them with this conespondence for reference.

We appreciate your review and acceptance of this conection.

Sincerely,

Jeff Knights Vice President, Teclmical Services, Mid-Tex

Enclosures (2)

Page 2: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

ABBOTI ABILENE

ADDISON ALBA ALBANY ALLEN ALVARADO

ANNA ANSON ARCHER CITY ARGYLE ARLINGTON ATHENS

AUBREY

AUSTIN AVERY AZLE BAIRD BALCH SPRINGS BALLINGER

BANDERA

BANGS BARDWELL BARRY BARTLETI BEDFORD

BELLMEAD

BELLS BELTON BENJAMIN BERTRAM BEVERLY HILLS BLACKWELL

BLANKET BLOOMING GROVE

BLUE MOUND BLUM BOGATA BONHAM BOWIE

BOYD

BRASHEAR BREMOND BRIDGEPORT BRO NTE BROOKSTON BROWNSBORO BROWNWOOD

BRUCEVILLE-EDDY

BRYAN BUCKHOLTS BUFFALO BUFFALO GAP BURKBURNETT

BURLESON

BURNET BYERS CADDO MILLS CALDWELL CALVERT CAMERON CAM PBELL

CANTON

CARLSBAD

Distribution Facilities Replacement Complet ion Report (2013)

Atmos Energy Mid-Tex Division

Distribution Piping Material (Feet) Service line Material (Each)

System ID Cast Iron Steel Plastic Steel Services Plastic Copper

Services Services 610001 . . . 4 211069 5,043 22,146 738 910 49 610005 . . . 8 3 310012 . . . 2 2 611443 . 59 . 7 . 610007 . 30,296 343 4 . 610012 . 155 . 12 2 610018 . 820 6,109 2 5 211075 . 285 . 3 6 611445 . . 2 1 610021 . . . . 1 610023 . 9,732 4,447 142 77 310028 . 2,351 . 104 3 610031 . . . . 1 411519 . . . . .

310056 . . . 2 2 610036 . . . 30 1 611446 271 . 5 1 611383 . . . 205 5 211078 . 807 . 26 . 410111 . . . 2 . 611447 . 111 . 29 1 610038 . . . 6 .

310064 . . 14 .

410115 . . 6 .

610042 . 260 . 44 2 612080 . . . 10 . 610044 . . . . 1 410950 . . 329 41 14 110880 . 137 . .

410132 . 25 2 . .

612081 . . . 21 . 211081 . . . 2 . 611448 . 500 . . . 310094 . . . 13 .

612123 . . 1 610048 . . . 2 .

310099 . . . 4 6 310101 . . . 14 12 610053 . 8 . 15 2 610055 . . . 2 1 310103 . . 1 .

410978 . 891 . 10 6 610058 . . . 10 .

211082 . . . 5 .

310108 . . . 1 . 310111 . . . 2 2 611449 11,096 7,793 3,279 293 11 610065 . . . 5 .

411071 . 1,455 161 112 45 410939 . . . 3 . 311779 . . 4 2 211083 . . 2 .

611451 . 830 1 91 7 610071 . 5 272 3 7 410161 . . 12 .

611455 . . 4 .

310124 . . . 2 411076 . 234 . 102 3 411041 . 813 . 14 2 410940 2,079 443 . 23 2 310125 . . 5 1 310127 . . . 10 2 211085 . . . 3 .

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

. .

.

. .

. .

. .

. 1

. .

. .

. .

. .

. .

. .

. .

.

. 1

.

.

. .

. .

.

. .

. .

. .

.

. .

. .

. .

. .

. .

. .

. .

. .

.

.

. .

.

. .

. .

. .

. .

. .

. .

. .

. .

. .

. .

. .

.

. .

. .

.

. .

.

.

. .

. .

. .

. .

. .

. .

. .

. .

1/7

Page 3: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

CARROLLTON CAYUGA CEDAR Hill CELESTE CELINA CENTER POINT CENTERVILLE CHILDRESS CHILLICOTHE CHILTON CISCO ClARKSVILLE CLEBURNE CLIFTON ClYDE COLEMAN COLLEGE STATION COLLEYVILLE COLLINSVILLE COLORADO CITY COMANCHE COMFORT COMMERCE COMO COOLIDGE COOPER COPPELl COPPERAS COVE CORSICANA COVINGTON CRANDALl CRAWFORD CROWLEY CUMBY DALlAS DAlWORTHINGTON GARDE~ DAWSON DECATUR DELEON DENISON DENTON DEPORT DESOTO DETROIT DODD CITY DUBLIN DUNCANVILLE EARLY EASTLAND ECTOR EDGECLIFF VIllAGE EDOM ElECTRA ElM MOTT EMORY ENl OE ENNIS EULESS EUSTACE EVANT EVERMAN FAIRF IELD FAIRVIEW FARMERS BRANCH

Distribution Facilities Replacement Completion Report (2013)

Atmos Energy Mid-Tex Division

Distribution Piping Material (Feet) Service line Material (Each)

SystemiD Cast Iron Steel Plastic Steel Services Plastic Copper

Services Services 610077 - 662 20 14 14 311480 - - 1 610084 - - 310 42 1 310139 - 23 - -610089 - 856 380 1 1 410186 - 2 -310141 - 8 -110099 - 2,633 25 3 111024 - 466 - -410979 - 10 - 3 -611460 - 743 - 9 2 310161 - - 5 14 4

610103 7,857 8,136 1,701 115 44 610107 - 199 8 19 1 611461 362 321 - 15 611465 - 1,175 2,755 6 22 411071 - 3,445 585 101 32 610113 - - 417 35 -610114 - - - 3 -211089 - - - 12 1 611466 - 200 - 5 3 410209 394 5 7 -310168 - 1,720 7 12 12 310171 - 27 - -610121 - 10 - 2 -310174 - 329 - 9 6 610122 - 205 2,075 4 1 410945 - - - 3 -310177 - 3,483 368 182 101 610129 - - 1 -310192 - - 2 -610130 - - - - -611435 - 417 - 8 4 310218 - 84 - - 1 610134 129,941 66,645 7,239 2,414 481 611425 - - - 1 1 311780 663 756 3 37 2 610150 - - - 3 2 611468 - - - 1 -610153 - 3,357 472 93 22 610162 - 6,927 213 414 55 310239 427 87 - 5 3 610148 - 1,720 195 13 2 310241 - - 8 -310248 - 299 3 6 1 611470 893 9 5 -610180 - 998 10 19 1 611471 - 105 - 8 612219 - 1,583 - 4 -310280 - - - 1 -611436 - - - - 1 310285 - 5 -611474 - 458 20 5 610189 828 907 - 29 5 310294 - - - 4 3 310297 - - - 1 610191 - 680 5 96 21 610200 547 - 138 2 310312 - - 5 -411118 - - 3 -612054 - - - 75 -311900 - - - 2 610206 - - 167 -610208 502 6 671 15

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

-- -- -- -- -- -

- -- -- -- -- -- -

- -- -- -- -- -- -- -- -- -

-- -- -- -

- -- 1

- -- -- -- -- 2

- -- -- 1

- -- -- -- -- 2

- -- -- -- -- -- -- -- -- --- -- -- -

- -- -- -- -- -- -

-- -- -- -- 6

2/7

Page 4: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

FARMERSVILLE FATE

FERRIS

FLOWER MOUND FOREST HILL FORNEY FORRESTON FORT WORTH

FRANKLIN

FRANKSTON FREDERICKSBURG FRISCO FROST GAINESVILLE

GARLAND GATESVILLE

GEORGETOWN GLEN ROSE GLENN HEIGHTS GODLEY GOLDTHWAITE

GORDON

GOREE GRANBURY GRAND PRAIRIE GRANDVIEW GRANGER

GRAPEVINE

GREENVILLE GROESBECK HALTOM CITY HAMILTON HAMLIN HARKER HEIGHTS HARROLD

HASKELL HASLET HAWLEY HEARNE HENRiffiA HICKORY CREEK

HI CO HIGHLAND PARK

HIGHLAND VILLAGE HILLSBORO HOLLAND HOLLIDAY HONEY GROVE HOWE

HUBBARD

HURST HUTCHINS HUTIO IOWA PARK IRVING

ITALY ITASCA

JOSHUA JUSTIN KAMAY KAUFMAN KEENE KELLER

KEMP

Distribution Facilities Replacement Completion Report (2013)

Atmos Energy Mid-Tex Division

Distribution Piping Material (Feet I Service line Material (Each)

System ID Cast Iron Steel Plastic Steel Services Plastic Copper

Services Services 612203 - 692 130 6 12 610209 - - 2 -610210 - - - 21 1 610215 - - 3,160 612055 - - 1 6 310325 28 - -610216 - - 10 -610226 33,825 42,703 14,607 1,776 775 411043 - - 8 3 310329 - - - 1 -410285 - 10 254 37 3 610233 - - 760 1 310335 - 9,534 - 12 2 610237 - 864 - 6 10 610244 - 10,462 3,092 978 254 411038 140 - - -411289 - 5,179 66 56 2 610256 217 2,001 259 20 -610180 - - 5 610259 - - 2 2 611995 - 311 - 14 -611477 - 113 - -110883 - - 5 1 -610263 - 443 - 2 610265 1,322 8,583 554 710 302 610266 - - - 18 3 410309 - - - 18 610267 - - 26 8 310388 399 3,941 377 61 26 612001 - 1,489 - 95 5 612026 7,117 6,194 1,024 164 251 411119 - - 42 -211099 - - - 1 -411047 - 770 276 1 611481 - - - 1 -110884 - 246 - 7 1 610282 - 3,950 - 2 -211100 - - 7 -411044 - 1,962 - 93 2 611482 - 368 - 1 3 610336 - - 5 - -611999 - - - 2 -612100 11,407 1,126 1,423 58 132 610352 - 8 531 - 9 610288 - 10,174 1,425 158 13 410339 123 - - 11 -611483 - 58 - -310440 - 1,175 30 27 1 610292 - 2,067 10 7 2 610293 - - 8 2 610297 - - - 73 3 610298 - - 307 23 411280 - 1,551 50 3 1 611484 - 867 - 3 2 610304 - 4,736 1,246 310 316 610308 - 288 - 30 1 610309 282 424 5 8 2 610315 - - 1 610321 - - 3 -611489 - - - 1 -310501 - 1,171 - 7 3 610323 - - - 4 1 610324 - 34 - 12 6 310502 - - 2 -

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

- -- -- -- -- -

-- -- 2 - --- -- -- 4

- -1 1

--

-- -- -- -- -

-- -- -- -- -- -- -- -- -- -- --- -- --- -- -- -- -

-- 3 - -- 1

-- -- -- -- -

--

- -- -- 1 - -- --- -- -- -- -

-- -

3/7

Page 5: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

KENNEDALE

KERENS KERRVILLE KILLEEN KNOX CITY KURTEN

LACY LAKEVIEW

LAKE DALLAS LAKE WORTH LAKEPORT LAMPASAS LANCASTER

LAWN

LEONA LEONARD LEWISVILLE LEXINGTON UTILE ELM UTILE RIVER-ACADEMY

LLANO

LOMETA LONE OAK LONGVIEW LORAINE LORENA

LOTI

LUEDERS MABANK MADISONVILLE MALAKOFF MALONE MANOR

MANSFIELD MARBLE FALLS

MARLIN MART MAY MAYPEARL MCCAULLEY

MCGREGOR

MCKINNEY MELISSA MERIDIAN MERKEL MESQUITE MEXIA

MIDLOTHIAN MILES

MILFORD MONTAGUE MOODY MORAN M ORGAN MUENSTER

MUNDAY MURCHISON MURPHY N RICHLAND HILLS NEVADA NEWARK

NEWCASTLE NOCONA

NOLANVILLE NORMANGEE

Distribution Facilities Replacement Completion Report (2013)

Atmos Energy Mid-Tex Division

Distribution Piping M aterial (Feet) Service Line Mat erial (Each)

System ID Cast Iron Steel Plastic Steel Services Plastic Copper

Services Services

612056 - - 5 310503 - - 5 51 1 410360 - 2,125 4 25 2 411048 359 2,085 - 17 4

110885 - - - 1 411079 - - - 1 -612083 - - 2 4

610336 - 433 - 7 -612669 - - - 2 311484 - - 2 -411611 261 16 20 -610341 - 231 14 55 2 211108 - - - 3 -311916 - - - 6 1 310546 - - 2 610350 486 10,149 20 22 410400 - 15 2 1 610946 - - - 5 410954 - 235 - 13 -410488 - - - 4 1 410948 - - 2 -310872 - - - 2 1 310882 - 8,991 295 31 -211109 - 125 - - -610955 - - - 14 -410981 - 736 - 1 9 211110 - 181 - 6 310903 - 247 - 5 2 311631 - - 54 5 310904 - 503 5 7 6 610963 640 8 108 4 5

410510 - - - 2 -610964 - 186 3,504 6 7 410512 - - - 4 410982 3,071 302 - 26 8 610965 848 34 386 6 1 611500 190 - -610966 - - - 18 -211111 - 30 - -610967 - 154 10 25 1 610969 - 2,205 919 56 32 610975 - 5 - 6 -610976 - 1 -211113 - 387 - 4 -610980 83 2,385 13 17 7

610983 - - - 153 65 610984 - 1,129 - 54 1 211114 - 176 - 2 -610986 - - - 20 -610993 - - - 1 -610995 748 136 16 11 -611502 - - - 3 -610996 - - - 1 -610998 - 403 - 11 -110894 - - 1 310947 - - - 1 610999 - - -612028 - 3 8 4 6 612207 - - - 1 -611004 - - - 1 -611503 493 - 2 -611016 - 61 - 9 4 411050 - 16 - 6 -311633 - - - 3 -

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

- -- -- -- -- -- -

- -- -- -- -- 2

- -- -- -- -

-- -

- -- -- -- -- -- -

- -

-- -- -- 1 - -- -- -- -- -- -

-- -- -- 2

- -- -- -- -- -- 1

- -- -- -- -- -- -

-- -

-- -- -- 1 - -- -- -- -- -- -- -

4/7

Page 6: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

NORTH ZULCH NOVICE

OAKWOOD ODEll OGLESBY OKLAUNION OLDEN

OLNEY

PALESTINE PALMER PANTEGO PARADISE PARIS

PECAN GAP

PENELOPE PETROLIA PETTY PFLUGERVILLE PICKTON PILOT POINT

PLANO

POINT PONDER POTISVILLE POWELL POYNOR

PRINCETON

PROSPER QUANAH QUINLAN QUITMAN RANGER RAVENNAML

REAGAN

RED OAK RENDON RICHARDSON RICHLAND RICHLAND HILLS RIESEL

RIO VISTA

RIVER OAKS ROANOKE ROBERT LEE ROBINSON ROBY ROCHESTER ROCKDALE

ROGERS

ROSCOE ROSEBUD ROTAN ROUND ROCK ROWlffi

ROXTON

ROYSE CITY RULE SACHSE SADLER SAGINAW SAINT JO SAN ANGELO

SAN SABA

SANGER

Dist ribution Facilit ies Replacement Completion Report (2013)

Atmos Energy M id-Tex Division

Distribut ion Piping Materia l (Feet) Service line Material (Each)

System ID Cast Iron Steel Plastic Steel Services Plastic Copper

Services Services

311634 - - - 1 611504 - - - 7 -310999 498 - 2 -611506 - 446 - - -611035 - - - 1 -611507 - 4

611510 - - - 1

611511 - 127 5 2 -311008 - 2,400 5 12 4 611040 - 1,432 - 9 17 611426 - - - 2 -611043 - - 2 -311017 11,444 4,237 1,035 125 70

311035 - - 105 2 -611048 - - - 2 611515 - 18 - 8 -311041 - - 1 -411296 - - 993 - 2 311046 - - - 1 -611052 - 500 5 5 -611054 - - 49 20 4

311079 - - - 3 1 611057 - - - 2 -411120 - - - 1 -311083 - - 2 -311086 - - - - 1

611064 - 8 - 5 -611070 - - - 1 -110900 - 1,158 - 31 5 311096 - - - - 1 311097 - - 10 2 611517 - 240 - 7 1

311144 - - - 2 -410976 - 112 - 4 -611072 - - 5 4 1 611435 - - 1 611083 - 7,043 10,745 259 234 311159 - - - 2 1 612027 - 130 574 - 1

611085 - - - 1 -611086 - - - 2 1 612670 - - - 1 3 611089 - 705 - 4 1 211123 - 395 - 20 -962853 - - 4 -211125 - 504 1 2

110904 - - - 1 410626 1,099 - - 16 2

410942 240 - - 1 -211127 - - - 6 -410943 - - - 5 -211128 - - - 2 410633 - 782 207 2 1

61110S - 830 - 7 1

311171 - - - 1 1

611114 - - - - 2 11090S - - - 3 611119 - - - 1 1 611120 - 194 - 2 -611121 - 160 420 11 1

611122 - - - 4 -211132 - 13,588 691 852 65

611996 250 - 13 -611125 - - - 3 -

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

- -- -- -- -

- -- -- -- -- -- -- 1

- -- -- -- -- -- -- -- 9

- -- -

-- -- -- -- -- -- -- -- -- -- -- -- -- 1 - -- -- -

- -- -- -- -

-- --- -- ---- -- -- -

-- -- -- -- -

- 1

-- -

5/7

Page 7: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

SANSOM PARK

SANTA ANNA SAVOY SCURRY SEAGOVILLE SEYMOUR

SHERMAN

SNYDER SOMERVILLE SOUTHLAKE SOUTHMAYD SPRINGTOWN

STAMFORD

STAR STEPHENVILLE STRAWN STREETMAN SULPHUR SPRINGS

SUNNYVALE

SUNSET SWEETWATER SYLVESTER TALPA TAYLOR TEAGUE

TEHUACANA

TEMPLE TERRELL THE COLONY THORNDALE THORNTON THRALL

THROCKMORTON TIOGA TOM BEAN TRENT TRENTON TRINIDAD TROY

TUSCOLA TYE UNIVERSITY PARK VALERA VALLEY MILLS VALLEY VIEW-COOKE VAN ALSTYNE

VENUS VERNON WACO WALNUT SPRINGS WATAUGA WAXAHACHIE WEINERT

WEST

WESTMINSTER WESTOVER HILLS WHITE SETTLEMENT WHITEHOUSE WHITESBORO WHITEWRIGHT

WHITNEY WICHITA FALLS WILMER WINTERS

Distribution Faci lities Replacement Completion Report (2013)

Atmos Energy Mid-Tex Division

Distribution Piping Material (Feet) service line Material (Each)

System ID Cast Iron Steel Plastic Steel Services Plastic Copper

Services Services 612671 2,671 252 - 48 23 611521 - 6 7 -611126 - - - 2 -311197 - 644 - -611387 - - 35 1 611523 - 1,098 240 6 2

611136 - 6,599 230 65 10 211139 - 1,271 95 8 -411080 - - - 1 4 611162 - 3,595 14 15 9 611163 - - - - 1

611165 - 9 - 4 -211478 - 1,661 - 20 1 611997 - - - 1 -611556 - 3,337 721 26 4 611526 371 950 - 3 -311901 - 672 - 5 311237 - 6,040 105 50 8 611388 - - - 4 -611183 - - - 1 -211142 1,299 1,065 281 46 2 211146 - - - 1 -612020 - - - 8 -410708 1,894 819 4 48 14 311902 - 20 - 23 -611188 - - 3 -410955 - 3,680 1,575 550 43 311258 - 5,806 70 34 32 610116 - - 10,344 - 6 410777 - - - 8 2 611366 - - - 5 -410780 - - - 4 -611529 - 34 - 1 611194 - 16,850 7 12 3 611195 - - 2 -211148 - - - 1 311310 - - 5 5 1 311315 - - - 4 2 410975 - - - 1 -211150 - - - 5 -211152 - - - 1 1 612099 1,037 1,480 - 14 64 611530 - - - 4 -611211 - - 1 -611212 - - - 2 -611213 - - - 3 1 611214 - 13 -611532 - 7,510 104 45 12 611218 30,400 14,964 1,639 1,334 71 611228 - - - - 1 611229 - - 200 173 73 611230 - 3,956 1,083 108 56 110910 - - 1 -611240 - 988 5 34 4 611244 - 837 - 1 610226 6,321 - 440 22 10 612673 30 544 6,345 79 69 311383 - - - 2 -611248 - 323 17 1 2 611251 - 110 - 2 -611252 - 2,766 2,778 21 11 611539 - 21,383 1,877 572 125 611264 - - 417 32 3 211160 - 551 - 8 -

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

- -- -- -- 3

-

-- 1

- -

- --- 1

- --

- -- -- -- -- -- 2

-- -- -- -- -- 5

1

-- -- -- -- -- -- -- -- -- -- -- -

-- -

-- ---- -- -- 5

--

-- -- -- -- -- -- -- -- 1 - -

-- -

6/7

Page 8: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

City

WOLFE CITY WOODWAY WORTHAM

WYLIE YANTIS

Grand Total

Distribution Facilities Replacement Completion Report (2013)

Atmos Energy Mid-Tex Division

Distribution Piping Material (Feet) Service line Material (Each)

Cast Iron Steel Plastic Steel Services Plastic Copper

System 10 Services Services

311402 - - - 2 -612086 - 2,246 80 25 -611271 - - 4

611273 40 1 2 311408 - - - 1 -

275,184 487,164 123,042 18,248 4,648

Calendar Year Ending Dec. 31, 2013

Components (Each)

Components

- -- -- -- 1

-1 65

7/7

Page 9: ATMOS energy...ATMOS energy April 8, 2014 Ms. Polly McDonald Director, Pipeline Safety Division Railroad Commission of Texas Ms. McDonald: During a review of our prior submittal ofthe

Distribution Facilities Replacement Reporting Atmos Energy Mid-Tex Division

Completion Report {2013}

Material Distribution Service lines Components

Piping (ft) (ea) (ea) - - - -

Steel 487,164 18,248 --

Cast Iron 275,184 - -Copper - 1 -

- -Plastic 123,042 4,648 -

Mise - - 65 -Grand Total 885,390 22,897 65

Work Plan {2014}

Material Distribution Service lines

Piping (ft) (ea) --

Steel 290,000 13,000

Cast Iron 264,000 -

Plastic 105,000 3,000 -·--Grand Total 659,000 16,000

*Approximate Figures 1/1