ATLAS Frame PRR 1W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Global SupportsPRR
W.O. Miller, R. Smith, W.K. Miller, R. Baer
HYTEC
G. Gilchriese, E. Anderssen, N. Hartman, F. Goozen
LBNL
Objectives:•Disk Ring Status•Production Readiness of Frame Components
ATLAS Frame PRR 2W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Nomenclature
Center Frame Section (1)
End Section (2)
Internal End Cone (2)
(B-Layer and Services not shown)
Interior Barrel Layers (3)
Disks (6)
Disk Rings (6)
Disk sectors (8)
ATLAS Frame PRR 3W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Disk Support Ring
Ring
Ring mount
8-sector disk
Sector cooling tubes
C-Channels4 arc segments around the perimeter
ATLAS Frame PRR 4W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Disk Ring Production
• Production Activities
– Mold Qualification: Phase I• Precision compression molded C-
Channels– Requires confirmation of cavity
dimensions– 2 outer and 2 inner C-Channels
molded with YSH50/RS-3 cyanate ester resin
– 4 segments for the outer and 4 segments for the inner
– 1st Article Ring Qualification: Phase II• Presently inspecting graphite bonding
fixture via CMM at LBNL• Phase II activity will start in February
2002
• Production Progressing as Planned
Development Ring Tested in Disk Frame Section
Confirmed our approachMounting approachMounting precision Repeatability of mountsFrame/mount stiffness
ATLAS Frame PRR 5W.O. MillerFeb. 2002
US ATLAS Pixel Detector
C-Channel Mold (Segment)
Silicone rubber forces the composite to conform to the mold profile—reversed the process from before
ATLAS Frame PRR 6W.O. MillerFeb. 2002
US ATLAS Pixel Detector
C-Channel Mold Trials
Typical Inspection Report for First Article
Verification ofcritical dimensions
•Radii•Toe-in•In-grain twist
Measurements taken as molded and after trimming
Edges to be trimmedInner and outer radii
and arc length
ATLAS Frame PRR 7W.O. MillerFeb. 2002
US ATLAS Pixel Detector
C-Channel Status
• Surface texture excellent• Wall thickness well controlled• Preliminary dimensional measurements look quite good- although this
investigation is still proceeding– C-Channel not completely trimmed, ½ moon cut-outs for the ring bushings left off – Desired dimensional control in several areas 50 to 130 microns (2 to 5mils)– Dimensions are to be achieved after trimming one edge (radius) of the channel to
the proper radius and two ends to form a 90 degree arc.
• Effect of mold strains– Part cures at elevated temperature in Al mold– Difference between as molded state and mold dimensions is evident– Difference after trimming the radius is more pronounced– More parts must be made to demonstrate consistency
• Results to date– Insufficient data to suggest a change in mold radius is necessary– Other dimensional features are quite good
ATLAS Frame PRR 8W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Global Support Frame PRR
ATLAS Frame PRR 9W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Global Supports-Readiness
• Tasks Completed Extensive design studies defining structural approach and material choices Prepared finite element model of complete system
Static stiffness Dynamic stiffness (vibration) Torsional stiffness (insertion considerations)
Prototyped Structures-(500mm diameter frame) Disk Frame Section End Cone Disk Support Ring and Mounts
Conducted Individual Component and Integrated Tests Disk Support Ring with development sectors Disk Support Ring in Frame Section End Cone with Frame Section
Completed CDR and FDR on all components Completed Production Drawings and Plans
ATLAS Frame PRR 10W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Topical Characteristics
• Global Support Structure– 2.85kg composite sandwich
structure, fully assembled with detectors and services estimated to be 26.8kg
• K1392U fiber/EX1515 Byrte Technology resin and graphite fiber honeycomb for maximum frame stiffness
– Assembled by joining 3-subassemblies with self indexing features
• 2-Disk Sections• 1-Barrel Section
• Interfaces Resolved End Cone to Barrel Shells (IVW) External mounts to Pixel Support
Tube Space for Services: routing and
egress
End Plate
End cone
Disk
Outer Frame
ATLAS Frame PRR 11W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Design Confirmation Studies
• Objectives
– Demonstrate ability to predict microstrains to level necessary for qualifying stable structures
– Confirm our predictions of static and dynamic stiffness
• Typical results– Frame sag ~12microns for
26.8kg
– Frame natural freq. ~89Hz
– Torsional sag- 3pt supports 61m
– Disk ring stiffness-1N load normal to ring 1.66m/N
ATLAS Frame PRR 12W.O. MillerFeb. 2002
US ATLAS Pixel Detector
End Cone Prototype
• Salient construction points
– End Cone for 500mm frame design
– P30Carbon-carbon facings, ~0.44mm
– XN50/cyanate ester graphite fiber honeycomb, 4mm thick
– YSH50 quasi-isotropic laminate for outer supports and inner tabs
• Static component tests
• Individually, as well as mounted on frame section(@LBNL)
White paint on short tab for holographic measurements
ATLAS Frame PRR 13W.O. MillerFeb. 2002
US ATLAS Pixel Detector
• LBNL test results with end cone in place
– Axial load 1.125inch from end of long tab-- 15.4m/N
• HYTEC end cone separately
– Axial load 1.125inch from end of long tab-- 16m/N
End Cone/Frame Test
Note disk sector support ring
Barrel section mounting tabs and dial indicator measuring displacement
12 Sector Frame-500mm dia.
ATLAS Frame PRR 14W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Now that prototype investigations and final drawings
have been completed
Frame Procurement Steps
• Remaining tasks Leading to Release of Procurement Orders are:– Review and incorporate comments from PRR– Finish detail drawing review– Release drawings and post in EDMS– Review letters of interest from prospective vendors
• Resolve any concerns about LBNL supplied tooling
• Procurement Orders– Release Request For Quote (RFQ) to composite fabricators– Release RFQ(s) for tooling– Select composite fabricator(s) and tooling vendors
• Assembly and QC Plans– Work with vendor (s) to produce a coordinated fabrication and assembly plan
• In process inspection at vendors and LBNL• Posting of the final plan documents in EDMS
– Complete assembly and inspection at LBNL
ATLAS Frame PRR 15W.O. MillerFeb. 2002
US ATLAS Pixel Detector
Schedule
Disk Support Ring and the Global Support Components Delivery Schedule is doable, but tight