atfm development in uae tf4... · 2020. 9. 21. · uae national operations centreconcept of...

10
ATFM development in UAE ATFM TF/4 Virtual Meeting 21 September 2020

Upload: others

Post on 21-Jun-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

ATFM development in UAEATFM TF/4 Virtual Meeting

21 September 2020

Page 2: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

Contents:

2

1. UAE National Operations Centre Concept of Operations2. C-ATFM Current Status3. Flow Control Situation

1. Departure2. Arrivals3. Overflights

4. COVID-19 Situation

Page 3: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

ATFM Development:

3

UAE National Operations Centre Concept of Operations:A vendor has been selected to conduct a NOC ConOps study in theUAE involving all major stakeholders.

National Operation

Centre

Area Control Centre

Collaborative ATFM

Approach ATSUs

Airports

Military

Airlines

Page 4: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

ATFM Development:

4

ATFM system Tender Evaluation in the UAE:• Site visit by system suppliers• Technical evaluation conducted• Clarification meetings with each supplier• Commercial evaluation (in progress)

Page 5: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

Departure - Flow Points:

5

Two Flow Points for UAE departures into OOMM:- LABRI: 5min- TARDI: 5min

Page 6: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

Departure - Flow Points:

6

One Flow point for UAE departures into OEJD:- MIGMA: 5min to 20 min for traffic on the same Flight Level*

*Overflying Traffic is considered in the slot allocation process*Separation between same level traffic is dependant on the speed of the succeeding aircraft.

Page 7: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

COVID-19 – Current Traffic Situation (2019 vs 2020):

7

Page 8: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

COVID-19 Arrangements:

8

• Arrivals:– Most arrivals are cleared on directs routes– STAR speed restrictions are only applied when necessary

• Overflights:– Most overflights are cleared on direct routes within the FIR– Dynamic use of Flight Level restrictions (between UAE sectors)– Relaxation of Flight Level restrictions (with neighbouring FIRs)

Page 9: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

COVID-19 Arrangements cont.

9

• Due to the sudden decrease of demand and in collaboration withOOMM and OEJD:– Departures Flow (DFLOW) system is suspended since 18th/23rd of

March respectively– Continuous monitoring of Traffic Flows– Exploring alternative and enhanced solutions for traffic flow

management– Evaluating traffic levels in order to ensure that Flow measures are only

implemented when truly needed

Page 10: ATFM development in UAE TF4... · 2020. 9. 21. · UAE National Operations CentreConcept of Operations 2. C-ATFMCurrentStatus 3. Flow Control Situation 1. Departure 2. Arrivals 3

Thank you