asx small to mid caps conference · the information in this presentation is an overview and does...

22
Slide 0 ASX Small to Mid Caps Conference Hong Kong 21 October 2010

Upload: others

Post on 25-Dec-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 0

ASX Small to Mid CapsConference

Hong Kong21 October 2010

Page 2: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 1

ROC OIL COMPANY PROFILEROC OIL COMPANY PROFILE

ROC is an ASX-listed upstream oil and gas company• 160 employees• Asia-Australasia Focus

Production assets• 2P Reserves of 13.9 MMBOE @ 31 December 2009• 6 fields producing 8,000-9,000 BOEPD net to ROC in FY10

Proven operational capabilities and experience• Operating ~30,000 BOEPD of production• Operating major projects in Australia and China

Health, Safety, Environment and Community (HSEC)• LTIFR per million man-hours worked of 2.3 for 1H 2010• One significant environmental incident during 1H 2010• Increasing community engagement

Exploration assets• Growing inventory of leads and prospects

Solid Financial Position• Net Cash of US$53 million @ 30 June 2010• FY09 net operating cashflow US$98 million

Page 3: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 2

INTERNATIONAL ASSET PORTFOLIO INTERNATIONAL ASSET PORTFOLIO

Operating and Joint Venture Relationships

• Several Australian JV partners• CNOOC (China offshore NOC)• Petrochina (China onshore NOC)• Sinochem• Pertamina (Indonesian NOC)• Several Japanese JV partners• Petronas (Malaysian NOC)

Operated Production

Production• Cliff Head oil field• Basker Manta oil fields• Zhao Dong oil fields• Blane oil field• Enoch oil & gas field• Chinguetti oil field

Non-Operated Production

Exploration AssetsDevelopment Project

FOCUS AREA

Page 4: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 3

CONSENSUS BROKER VALUATIONCONSENSUS BROKER VALUATION A$0.66/share*A$0.66/share*

* Consensus valuation and target price calculated by averaging the valuations of all 10 Australian equity analysts that actively cover ROC as at 15/10/2010. Broker valuations range from A$0.51/share to A$0.87/share. Broker target prices range from A$0.41/share to $0.68/share.

0.660.07

0.11

0.44

0.04

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

Producing Assets Development Assets Exploration Upside Net Cash Total

Consensus Market Valuation $0.66/share*A$/share

Share Price @ 15/10 ($0.43/share)

Consensus Share Price Target ($0.55/share)*

Present Broker Recommendations

7 BUYS2 HOLDS1 SELL

ROC presently trading at a 22% discount to broker consensus target price

Page 5: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 4

SHARE PRICE PERFORMANCESHARE PRICE PERFORMANCE BMG Disappointment in February 2009BMG Disappointment in February 2009

ROC Share Price Since 2009

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

Jan-09 Feb-09 Mar-09 May-09 Jun-09 Jul-09 Sep-09 Oct-09 Dec-09 Jan-10 Mar-10 Apr-10 May-10 Jul-10 Aug-10 Sep-100

10

20

30

40

50

60

70

80

90

ROC

BRENT (US$)

A$/share US$/BBL

BMG Reserves Downgrade

Equity Raising Announced

Sale of 10% of BMG

Farmout of Onshore Angola Acreage

Reduced BMG Drilling Programme

Consensus Valuation

A$0.65/share

Page 6: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 5

IMPROVING ROCIMPROVING ROC’’S SHARE PRICE PERFORMANCES SHARE PRICE PERFORMANCE Rebuild Confidence Through Strategy DeliveryRebuild Confidence Through Strategy Delivery

MAINTAIN CASHFLOW: Exploit existing reserves & resources

• Maintain and maximise production

• Commercialise resources

BALANCE RISK: Management of resources

• Financial and operational risk management

• Portfolio management

IMPROVE FINANCIAL PERFORMACE

• Focus on budget delivery and cost minimisation

• Pro-active capital management

GENERATE GROWTH: Leverage competitive advantages

• Operational and technical capabilities and experience

• Company size and geographic niches

• Industry relationships

Page 7: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 6

2009 SCORECARD2009 SCORECARD Delivery of Objectives = OutperformanceDelivery of Objectives = Outperformance

HSECReduce LTI and TRI frequency ratesZero significant environmental incidentsBroaden community engagement

Deliver Operating Budget

Production within guidance (lower end of range) Control development and exploration expenditure~ Operating costs contained (per BOE increased due to BMG)

Exploit Existing Reserve Base

Zhao Dong facilities installation and drilling programme Cliff Head workovers (CH-10 and CH-6) BMG Phase-1 oil project production

Pursue Growth Opportunities

Beibu Gulf ODP technical section completed~ Beibu Gulf commercial negotiations: COMPLETED 1H 2010

BMG Phase-2 gas project progressed: UNDER REVIEW

Strengthen Balance Sheet

Successful equity capital raising Net cash position at year end

Rebalance Asset Portfolio

Sale of 10% participating interest in BMG Angola farm out Assessing opportunities in SE Asia-Australasia~ Reduce exposure in African permits: ONGOING

Page 8: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 7

2009 RELATIVE SHARE PRICE PERFORMANCE2009 RELATIVE SHARE PRICE PERFORMANCE Delivery of Objectives = OutperformanceDelivery of Objectives = Outperformance

* Large Cap Peers included in average performance are BPT, AWE, OSH, STO and WPL

ROC vs Large Cap Peers - 2009

-40%

-20%

0%

20%

40%

60%

80%

Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09

ROC

Average Larege Cap Peer Performance*

Brent Oil (A$)

Page 9: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 8

EXPERIENCED & CAPABLE OPERATOREXPERIENCED & CAPABLE OPERATOR Delivering the StrategyDelivering the Strategy

Cliff Head Producing Oil Field (37.5% and operator)• Discovered, appraised, developed and now operated• 14 months from FID to first oil in May 2006• Workovers delivered increased production in 2010

Zhao Dong Producing Oil Field (24.5% and operator)• Operated since acquisition in 2006• 4 platforms and 2 pipelines installed in 2009 on budget and on schedule• Ongoing development drilling programme through until 2013

Beibu Gulf Development Project (19.6% - formerly operator)• Exploration and appraisal wells between 2002-2006• Development of project in close cooperation with CNOOC (now operator)• Completion of Overall Development Plan and FID before end of 2010

Exploration• 2 new permits in New Zealand during 2010• 3 exploration wells in 2010 (Tuatara, Cormoran and Gharabi)• 2 appraisal wells in 2010 (Castanha-2 and Castanha-3)• Seismic programmes (onshore Angola and Mozambique Channel)

Page 10: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 9

AUSTRALIA AUSTRALIA –– CLIFF HEADCLIFF HEAD Producing Oil FieldProducing Oil Field

Location: Offshore Perth Basin

Working Interest: 37.5%

Operator: ROC

Development: • Unmanned platform• Pipeline to onshore

stabilisation plant• Oil trucked to BP

Kwinana Refinery

% of ROC 2P Reserves:

Gross 2P Reserves: 8.3 MMBBL(as at 31 December 2009)

Gross Production: 4,475 BOPD(for 1H 2010)

Activity: Two coiled tubing workovers successfully completed in 2009 from unmanned platform without the need for a rig. Another workover is planned for 1H 2011

Platform 11km offshore

Onshore Stabilisation Plant

Established production with enhancement from workovers

ROC Net: 3.1 MMBBL(as at 31 December 2009)

Other78%

Cliff Head22%

Page 11: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 10

CLIFF HEADCLIFF HEAD Workovers Arresting Production DeclineWorkovers Arresting Production Decline

Cliff Head Quarterly Production

0

2

4

6

8

10

1Q06 2Q06 3Q06 4Q06 1Q07 2Q07 3Q07 4Q07 1Q08 2Q08 3Q08 4Q08 1Q09 2Q09 3Q09 4Q09 1Q10 2Q10

'000 BOEPD

Workovers to replace ESPs improve production rates

Page 12: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 11

Other51% C&D +

C449%

ZHAO DONGZHAO DONG Producing Oil FieldsProducing Oil Fields

Location: Offshore Bohai Bay

Working Interest: • C&D (+ERA) 24.5%• C4 Field 11.6% (unitised)

Operator: ROCDevelopment: • 4 linked platforms: 2 for drilling &

accommodation; 2 for production & processing

• C4 platforms connected by pipelines

• Oil barged to Tanggu Port

% of ROC 2P Reserves:

Gross 2P Reserves: • C&D (+ERA) 24.9 MMBOE• C4 Field 6.0 MMBOE

(as at 31 December 2009)

Gross Production: • C&D (+ERA) 14,577 BOPD• C4 Field 1,668 BOPD

(for 1H 2010 – severe sea-ice caused 35 days of lost production during the period)

Activity: 2010 drilling programme on schedule and on budget

Future production upside from continued development drilling

ROC Net: 6.8 MMBBL(as at 31 December 2009)

Page 13: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 12

ZHAO DONGZHAO DONG Successful Facilities DevelopmentSuccessful Facilities Development

24.5% (C&D and ERA) and 11.575% (C4) and Operator

In 2009, the 3 year facilities development was completed on schedule and on budget, installing four platforms and two pipelines

Above: Zhao Dong C&D field platform facilities

Right: C4 and ERA platform facilities

Page 14: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 13

ZHAO DONGDONG Ongoing Development Drilling Maintains Production Ongoing Development Drilling Maintains Production

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

Jul-03 Jan-04 Jul-04 Jan-05 Jul-05 Jan-06 Jul-06 Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09 Jan-10 Jul-10

2003 Wells 2004 Wells 2005 Wells 2006 Wells 2007 Wells 2008 Wells 2009 Wells 2010 Wells

Zhao Dong: Production Contribution per Programme Y

BOPD

Page 15: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 14Slide 14

• Project 2C Resources ~26.5 MMBBLs (ROC: 5.2 MMBBLs)

• ROC will book 5.2 MMBBL as 2P Reserves on FID completion

• Potential exploration upside in 3 prospects

• Potential production upside through 12-8 East field development

BEIBU GULF OIL FIELDSBEIBU GULF OIL FIELDSDevelopment ProjectDevelopment Project

Cooperation / Integration / Sharing• Share new processing platform

• Agreed common technical and technology standards

• Use existing CNOOC production facilities

• Share services

• CNOOC to operate: ROC to participate in development

Page 16: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 15

BEIBU GULF OIL FIELDSBEIBU GULF OIL FIELDS Development PlanDevelopment Plan

Page 17: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 16Slide 16

FIRM and CONTINGENT EXPLORATIONFIRM and CONTINGENT EXPLORATION

Page 18: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 17

PURSUE NEW OPPORTUNITIESPURSUE NEW OPPORTUNITIES Leverage Competitive Advantages for Growth Beyond BeibuLeverage Competitive Advantages for Growth Beyond Beibu

Asia and Australasia Focus• Offices in Sydney and Beijing

• Operate fields in Australia and China

• Existing relationships in the region (PetroChina, CNOOC and Petronas)

Offshore Continental Shelf• Experience at Cliff Head and Zhao Dong

• Shallower water depths mitigate risks and costs

Target Exploration / Appraisal / Pre-Development Assets• Experience in developing challenging and/or marginal fields

• Prefer not to acquire existing production or facilities

• Fields material to ROC (20-40 MMBBL), yet too small for NOCs and IOCs

New Venture Team Actively Pursuing Opportunities• Anticipate increasing acreage position in 2011

Page 19: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 18

ROCROC’’S 2010 PLANS and OBJECTIVESS 2010 PLANS and OBJECTIVES

HSEC• Maintain and improve safety and environmental performances

• Build upon existing relationships with host communities

Deliver Operating Budget

• Production of between 8,000-9,000 BOEPD

• Development and exploration expenditure <US$80 million

• Contain and control operating costs

Exploit Existing Reserve Base

• Zhao Dong development drilling

• Pursue further Cliff Head workover opportunities

Pursue Growth Opportunities

• Beibu Gulf project FID and commencement of development

• Conclude BMG review

• Reserve replacement opportunities

Increase Exploration Activity

• Castanha appraisal well and 3D seismic in Angola

• Finalise drillable prospects in WA-351-P, Carnarvon Basin

• Farm out and drill Aleta-1 prospect offshore Equatorial Guinea

• Acquire seismic in offshore Mozambique Channel permits

Build on Existing Relationships

• Petrochina and CNOOC in China

• Existing joint venture partners (domestic and international)

Rebalance Asset Portfolio

• Reduce exposure to Africa through farm outs

• Increase presence in SE Asia-Australasia focus area

Page 20: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 19

SUMMARYSUMMARY

1) Trading at discount to consensus valuation– BMG disappointment– Rebuilding confidence

2) Strategy in place– Create value– Provide future growth

3) Strategy implementation– Experienced and capable operator– Strong relationships

4) Recent track record– Achieved most objectives in 2009– Delivery on objectives = Share price outperformance

Page 21: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 20

DISCLAIMERDISCLAIMER

Important Information

The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment decisions investors should rely on their own examination of ROC and consult with their own legal, tax, business and/or financial advisers in connection with any acquisition of securities.

The information contained in this presentation has been prepared in good faith by ROC. However, no representation or warranty expressed or implied is made as to the accuracy, correctness, completeness or adequacy of any statements, estimates, opinions or other information contained in this presentation. To the maximum extent permitted by law, ROC, its directors, officers, employees and agents disclaim liability for any loss or damage which may be suffered by any person through the use or reliance on anything contained in or omitted from this presentation.

Certain information in this presentation refers to the intentions of ROC, but these are not intended to be forecasts, forward looking statements or statements about future matters for the purposes of the Corporations Act or any other applicable law. The occurrence of events in the future are subject to risks, uncertainties and other factors that may cause ROC's actual results, performance or achievements to differ from those referred to in this presentation. Accordingly, ROC, its directors, officers, employees and agents do not give any assurance or guarantee that the occurrence of the events referred to in this presentation will actually occur as contemplated.

The reserve and resource information contained in this announcement is based on information compiled by Neil Seage (Chief Reservoir and Planning Engineer). Mr Seage (BA, BEng (Hons), MBA and Dip App Fin), who is a member of the Society of Petroleum Engineers, has more than 30 years relevant experience within the industry and consents to the information in the form and context in which it appears.

Page 22: ASX Small to Mid Caps Conference · The information in this presentation is an overview and does not contain all information necessary for investment decisions. In making investment

Slide 21

www.rocoil.com.au

For further information contact:

Matthew GerberManager, Investor Relations and External Affairs+61 2 8023 [email protected]