The Second Avenue Subway project is a planned rapid transit subway line that is part of the New York City Subway system. Phase I of the project consists of three stations and two miles of tunnel.
![Page 2: Assignment 5](https://reader033.vdocuments.site/reader033/viewer/2022042718/568bdcfc1a28ab2034b43393/html5/thumbnails/2.jpg)
Currently, the upper east side only has one rapid transit and it is the most crowded line in the country. The proposed Second Avenue line will add another two tracks.
![Page 3: Assignment 5](https://reader033.vdocuments.site/reader033/viewer/2022042718/568bdcfc1a28ab2034b43393/html5/thumbnails/3.jpg)
The 485-ton tunnel boring machine completed its second pass and reached a milestone of clearing two miles of tunnels.
![Page 4: Assignment 5](https://reader033.vdocuments.site/reader033/viewer/2022042718/568bdcfc1a28ab2034b43393/html5/thumbnails/4.jpg)
The first phase of the Second Avenue Project is expected to cost $4.45 billion and it is expected to be completed by December 2016.