  • 8/3/2019 Assignment 1 - Site Visit NANO

    1/15

    TABLE OF CONTENTS

    TITLE PAGES

    ACKNOWLEDGEMENT 1

    OBJECTIVES 2

    INTRODUCTION 3

    ABOUT THE CONSTRUCTION 4

    ENVIRONMENT TECHNOLOGY

    Environmental Problems

    Environmental Technology

    5

    CONCLUSION 11

    REFERENCES 12

    | K K T M S G

  • 8/3/2019 Assignment 1 - Site Visit NANO

    2/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    ACKNOWLEDGEMENT

    First of all, we would like to say Alhamdulillah, for giving us the strength and health

    to do this task until it done and we would like to express gratitude to God because with his

    permission, Environmental Technologys first assignment was able to be completed exactly at

    the time. In completing this assignment, we get support and help from various party.

    Great appreciation to all our group members which is Amirul Amin Bin Zailan

    Shukri, Nur Akhmal Arif Bin Jamaludin and Nur Hayanti Binti Buhkari because has been

    cooperative and work in commitment that good during doing this task.

    Do not forget also deepest gratitude to Miss Marlizaiha Binti Mohd Noor that had

    been giving much guidance to we finish this assignment. Last but not least, also appreciation

    for friends that pitch in help in terms of give coaching and idea in effort to complete this

    assignment.

    Thank you, so much.

    2 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    3/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    OBJECTIVES

    After completing this assignment, we are able to:

    a) Identify the various environmental technology applied in the site based on observation

    from environmental problems from the site.

    b) Explain impact of construction activities on environment.

    c) Identify the environmental technologist responsibilities.

    3 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    4/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    INTRODUCTION

    Environmental technology is the application of the environmental science to conserve

    the natural environment resources and to curb the negative impacts of human involvement. It

    is a new technology that we can see on some building in Malaysia. It is also called GreenTechnology. There many types of environmental technology like solar system, recycling,

    solid waste management, sewerage treatment, air pollution control, noise pollution control

    and much more.

    Some environmental technologies, in conjunction with sustainable development, are

    technologies that assist directly with energy conservation. Energy sources such as solar power

    create fewer problems for the environment than traditional sources of energy like coal and

    petroleum. Besides that, other emerging technologies are those that help the environment by

    reducing the amount of waste produced by human activities.

    Besides that, there are some environmental problems that we need to avoid during

    construct a building. For example movement of constructions vehicles likes trucks and

    backhoes. These vehicles can produce dust at construction site and may risk the workers

    health. In order to prevent this situation, we need to ensure there is no health risk or less of

    amenity due to emission of dust to the environment.

    4 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    5/15

  • 8/3/2019 Assignment 1 - Site Visit NANO

    6/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    Name of the Project is Proposal build and complete NanoLaboratory Building

    Technology for Excellence Centre Microelectronics and NanoTechnology-Shamsudin

    research center (MINT-SRC), School of Engineering Electrical and Electronic (FKEE) in the

    University TunHussienOnn Malaysia(UTHM) Johor.Location of the Project is this building

    was proposed to build at UTHM that addressed in UniversitiTunHussienOnn Malaysia, Beg

    Berkunci 101, 86400 Parit Raja, BatuPahat, JohorDarulTazim. This campus is near to a

    small town that known as PekanParit Raja. It is about 5 kilometres from UTHM to PekanParit

    Raja.

    For the building elevation and roof structures, it has external wall finishes will be

    using combinations of Aluminum Composite panel, rough cast sprayed painting, use of

    functional decorative steel shading louvers and 8mm thick tampered glass. Roof is to

    facilities cross ventilation, natural light and designed to provide maximum shelter, shade

    natural light and ventilation. The roof with ceiling shall be of the following components, it is

    standing seam roofing profile, the sheets shall be of zincalum steel comprising a base metal

    thickness (BMT) of 0.55mm thicknes or 0.48mm thickness for total coating thicknes (TCT)

    of 0.60mm or 0.53mm respectively. Besides that, the components also has acoustic soundbarrier layers for the purpose of eliminating airbone sound and rain impact sound. It also has

    metal linear strip ceiling at the external area with secured reverted joints able to withstand

    dislodge from wind loads in the local weather conditions.

    OBSERVATION FROM THE SITE

    ENVIRONMENTAL PROBLEMS AT CONSTRUCTION SITE

    Construction site is a place where construction activities take place for a certain

    period, which is prohibited to the public. The movement of the trucks, backhoe and lorry can

    be seen everywhere and the construction activities done con currently.

    Bricks and steel were the most important material in construction site. Normally, they

    were dumped before being used. The material left undisturbed could lead to environmental

    problem especially when it is raining. Rusty steel bar could contaminate the surface runoff.

    6 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    7/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    As a result the river pollution can occur when this surface runoff enter to the river. At the site

    where we observe, we can see the waste of alluminium with waste from labours.

    Figure 1: Waste of alluminium, the broken bricks, box and waste from labours.

    Cut, fill, and compacting are activities associated with the leveling (done in site

    preparation process). These activities make the top soil exposed to the rain. When rain comes,

    the soil particle will be drained out into the nearest natural water sources such as pond,

    drainage. As the result the sendiment of the pond and drainage increased leading to the flash

    flood. For this site, we can see the soil particle will be drained out into the drain and pond

    nearest with the site.

    Figure 2: Construction near pond and soil particle

    drained out into the drain

    For the big and costly project, the workers

    could exceed 30 persons and most of them were lived in the

    construction area to save their mobility cost. They built

    7 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    8/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    their home using the unwanted material which can be found within construction site.

    Normally, they prepare an area for dining and living. They never concern about the

    wastewater therefore they do not build the proper toilet. The untreated wastewater could

    contaminate the surface runoff and the problems become worst when the runoff enter into the

    river. In our observation, we just can look their toilet and we also see the wastewater into the

    surface of soil.

    Figure 3: The toilet for workers and wastewater area

    According to the site engineer on the constructions site, there are only minor environmental

    problem happen on the site.

    Environmental Problem

    1. Unsorted of unused and waste materials like steel bars, zincs, bricks, formworks and

    woods.

    2. Heavy land disturbance as the site engineer said that the construction site was full of

    palm tree before.

    3. There some workers live inside construction site.

    4. Toilet used in construction site direct to outside drainage (Do not use any tank).

    5. Dust produced from movement of trucks and backhoes.

    8 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    9/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    ENVIRONMENTAL TECHNOLOGY APPLIED IN CONSTRUCTION SITE

    In the construction site, the environmental technologies to be considered such as

    recycling, sewage treatment, solid waste management, air pollution control, and noise

    pollution control.

    For recycling, normally the formwork is made by wood and plywood. They are

    natural resources which decreased over time. The unused formwork will be burnt in the

    construction site. Thus it could pose serious air pollution. With the recycling approach, the

    formwork could be used again and again untill the ultimate usage before dumped to fire. With

    this practice, the natural resources were used brilliantly and helps protect the environment and

    cause less waste/pollution.

    Figure 4: Unused wood will be burnt

    From our observation, there are a place for burnt the unused wood like show in figure

    4 but it is not serious air pollution. The information we got from supervisor, he said that the

    formwork will be used again and again until the ultimate usage before dumped to fire.

    Furthermore, there are company or factory will pick the unused formwork to recycle. At the

    9 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    10/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    site, workers just burnt the smaller unused wood and domestic waste such as plastic bottle,

    polystyrene and coarse material for making sacks.

    For sewage treatment, it has to be treated before discharged into the rivers. The

    constituents in the sewage could decrease the river water quality. To make sure that the river

    can do self purification (the only way for the river to maintain the DO level), the sewage must

    be treated before goes into the river. The simple way to treat sewage is using the individual

    septic tank. Septic tank was designed according to the population evaluation (PE).

    Figure 5: Sewage and impermanent of toilet for workers.

    At the site, also have toilet for workers but the toilet rarely use because the sewerage

    system is not systematic. They will use UTHMs toilet for more comfortable. So, there are no

    have pollution to the rivers because the sewage not discharged into the rivers.

    There are no doubt that construction site will generate a solid waste. The solid waste

    generated included the plastic, papers, wood, broken bricks, steel bar, unwanted cement,

    spoiled paint, brush and another material for construction. Therefore, the solid waste

    management should be applied in a construction site in order to ensure that the waste

    generation is under the control.

    10 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    11/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    Figure 6: The waste on site

    Refer the figure 6 above, we can see that the site still ensure that the waste generation

    is under the control. In construction, the building more use Aluminum Composite panel. So,

    the waste on site more to alluminium. Their workers will pick the alluminium and collect at

    one place because the waste of alluminium will sent to factory for recycling. The waste such

    as plastic, wood, broken bricks, and another material also will segregation of waste on site

    and it will be recycling. For steel bar, the workers will sold and if the steel still can be use,

    they will keep in the stor. Although the site not applied the solid waste management in the

    construction, the waste generation still can control with systematic. So, the site not give

    pollution to environment.

    Air pollution control should be serious in construction because it will can be pollution

    for environment. The site preparation and site clearing process is a activity causing the huge

    disturbance to the ground and top soil. The disturbed ground and top soil was exposed to the

    free air. In the hot dry weather, the soil particle files everywhere, the condition becomes

    worst when the lorry and trucks keeps moving on the area. The alternative way to reduce air

    pollution is water spraying, however application of water spray for huge construction site is

    worthless.

    For this construction, not have serious problem in air pollution because the site is not

    dust area. For early construction, there are dust but not serious. So, they reduce air pollution

    with wash truck system. So, before the truck or lorry inside the site, it will use wash system to

    11 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    12/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    reduce the soil particle files everywhere. Water spraying on the exposed top soil is deficient

    to use in the site because it will be effect to drainage with wet dust. So, the drain can be block

    to water system like in figure 7.

    Figure 7: The problem drainage

    Noise pollution problem always be serious in construction because it will disturb to

    another humans to do the work. Piling works is common job for the construction of multi-

    storey building, and bridge. The noise pollution happen during the piling works. Some of the

    complaint of the piling works are neglected because of the noise is not consistent. However,

    the exposure to the piling works for days at a long time could lead to the hearing problems.

    Therefore, the construction workers have to make a proper piling schedule in order to control

    the noise pollution.

    For this construction, the workers not have a proper piling schedule, they just

    planning when the piling works should be do. From the information, the supervisor said that

    in the construction use 110 bar of piling. It is because, the site is from oil palm tree. So, the

    land should be embankment. One day, 14 bar of piling will they use for piling works. The

    piling works will do from morning and stop at evening. So, at the night not have piling works

    and the construction not disturb anyone. Early of construction, they want to use jack pile but

    at the same time, the UTHMs students have ezam. So, they dont want to disturb all the

    students. Other than that, they also not use jack pile because a building nearest with the site is

    sensitive with vibration. The building have machines and very sensitive with vibration.

    12 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    13/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    Furthermore, the jack pile can give more cost in construction. In this construction, they also

    made soil test to know if the site have problems. They have its record about the soil test.

    Applied Environmental Technology

    1. Recycling

    a. They re-use any waste materials that are still in good conditions.

    b. If waste materials unusable, they will collect and give to responsibility

    company to dump that materials to fire.

    2. Solid Waste Management

    a. They will make sure construction site will always clean.

    b. Put waste materials in one place.

    c. They will dump all waste materials that unusable.

    3. Air Pollution Control

    a. They spray the road with water before the trucks or backhoes enter the site.

    b. Dust was vanished by rain because during the construction, most of the day is

    a rainy day.

    CONCLUSION

    Some construction site do apply the environmental technology approach to overcome

    the environmental problems. Construction workers spend most of their time at construction

    site. Therefore, it is the job of the construction workers to ensure that they have a clean

    environment. Under direct supervision of a mentoring Field Technician or Project Manager,

    13 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    14/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    construction workers assist in carrying out Site Management and /or Waste Management

    field-related activities such as sampling, surveying, collection and measuring. This involves

    collecting information regarding the presence and effects of pollutants in air, water and soil of

    the construction site.

    To work in clean environment, it is a must for construction workers to have a

    comprehensive knowledge of waste reduction, management methods and issues. From that,

    we can get the clean environment without any pollution. The environmental friendly working

    area can motivate them to work effectively. And the ability of the construction workers to

    address the environmental problems is a good sign that the construction will not degrade the

    environment as the result the sustainable construction will be in place all the time.

    REFERENCES

    14 | D C S 4 1 3 3

  • 8/3/2019 Assignment 1 - Site Visit NANO

    15/15

    KOLEJ KEMAHIRAN TINGGI MARASRI GADING, BATU PAHAT

    ENVIRONMENTAL TECHNOLOGY, DCS 4133, Cik Marlizaiha Bte Mohd Noor.

    Site visit to NANO Technology Laboratory at UTHM.