asset management orbital 002

16
HSEQ Consultants Asset Management De Brauwweg 24-30 3125 AE Schiedam The Netherlands Tel.: +31(0)10 4379089 Fax : +31(0)10 4154966 Mob: +31(0)6 51203449 E-mail: [email protected] Internet: www.orbin.nl

Upload: sundar-kumar-vasantha-govindarajulu

Post on 08-Feb-2016

6 views

Category:

Documents


0 download

TRANSCRIPT

HSEQ Consultants

Asset Management

De Brauwweg 24-30

3125 AE Schiedam

The Netherlands

Tel.: +31(0)10 4379089

Fax : +31(0)10 4154966

Mob: +31(0)6 51203449

E-mail: [email protected]

Internet: www.orbin.nl

HSEQ Consultants

RELIABILITY, AVAILABILITY &

MAINTAINABILITYRAM

HSEQ Consultants

Reliability

Availability

Maintainability

Safety Case

PED

MD

RAM

HSE

ATEX

RBI

RCM

IPF

PSI

Operational Excellence

HSEQ Consultants

Production Optimization

Costs

optimum

Availabilty

Total costs

Investment costs

Production loss

HSEQ Consultants

RISK BASED INSPECTION

RBI

HSEQ Consultants• Risk Based Inspection is an optimisation

process of the risks covered by inspection activities.• RBI is a general method that can be applied to any installation and structure. • Risk is classically defined by its probability of occurrence and by the consequences of its effects.• Within RBI approach, the interest relies on the assessment of the inspection effort in reducing/maintaining the risk level.

RBI Definition

HSEQ ConsultantsRISK MATRIX ON PLANT LEVEL RISK MATRIX ON SYSTEM LEVEL

RBI Output

HSEQ Consultants

RELIABILITY CENTERED

MAINTAINCERCM

HSEQ Consultants

LEGISLATION

IN-HOUSEEXPERTISE

COMPANYSTANDARDS

MANUFACT& VENDOR

RECOMMEND

MAINTENANCE SYSTEMSBASED ON

EXPERIENCE ANDHISTORICAL PRACTICES

Traditional Approach

HSEQ Consultants

Client req’s Legislation

MaintenanceUtilization

ReplacementExtension

Strategicmanagement

Tacticalmanagement

Operational management

Strategy

Objectives

RCM Management

HSEQ Consultants

• RCM TACKLES THE UNDERLYING MAJOR LIFECYCLE COST ITEMS

LabourMaterials

OverheadsVisible Costs

Hidden Losses

Poor Teamwork and Communicationbetween Functional Groups

Wasted Time and Resourcethrough Inefficient Processes

Poor Plant Reliabilityand Performance

Easily Measured

Limited Profit Potential

Not Generally Measured

High Profit Potential

HSEQ Consultants

Evaluate importance of bottom level functions

Plan and develop the level of analysis

THEN

Evaluate loss of function and probability of occurring

HSEQ Consultants

RAM Approach

•P&IDs•PEFS, UEFS•Cause & Effects•Operating Guides•Vendor Information•Availbiltiy / Cost / Resource Targets

•Unit costs for materials•Unit costs for services

Functions

SIMULATIONSOFTWARESIMULATIONSOFTWARE

Element maintenance

resource sheet

Element maintenanceresource sheet

Man-hour Estimate•Man-hours•Downtime•Spare Requirements•Other costs

Data for Reliability•Failure Rate•Remaining Capacity

FMEAFailure Modes

DemandDemand

downtime

manpowersparesother costs

man-hourscosts

systemeffectiveness

personnelrequirements

costsavailability MRP including maintenace schedulesand task descriptions

Reliability

Block Diagram

ReliabilityBlock Diagram

Plant SpecificInformation

•P&IDs•PEFS, UEFS•Cause & Effects•Operating Guides•Vendor Information•Availbiltiy / Cost / Resource Targets

•Unit costs for materials•Unit costs for services

Functions

SIMULATIONSOFTWARESIMULATIONSOFTWARE

Element maintenance

resource sheet

Element maintenanceresource sheet

Man-hour Estimate•Man-hours•Downtime•Spare Requirements•Other costs

Data for Reliability•Failure Rate•Remaining Capacity

FMEAFailure Modes

DemandDemand

downtime

manpowersparesother costs

man-hourscosts

systemeffectiveness

personnelrequirements

costsavailability MRP including maintenace schedulesand task descriptions

Reliability

Block Diagram

ReliabilityBlock Diagram

Plant SpecificInformation

HSEQ Consultants

PRODUCTION

Criticality Assessment

RCM

High Low

Functional Analysis

StructuredReview

FMEA

Medium

MAINTENANCE

HSEQ Consultants

RCM

RAM

RBI

FMECA

Preventive

Corrective

Periodic

Conditional

Utilization

Incentive I & M Contract

HSEQ Consultants

RBI/RCM References

• Probabilistic Corrosion Analyses Flowlines NAM • RBI/RCM Offshore Platforms NAM• Site Inspection BP Refinery• RCM program Elf Petroland• Feasibility study implementation RBI TRN• RBI inspection plan BP onshore gas facilities• RBI/RCM Q4-C Platform Wintershall