assessment update: 2012-2013 preliminary results
DESCRIPTION
Assessment Update: 2012-2013 Preliminary Results. Department of Accountability School Board Meeting August 22, 2013. Federal Annual Measurable Objectives (AMO). Replaced Annual Yearly Progress (AYP) Measures participation and achievement levels in reading and mathematics - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/1.jpg)
Department of Accountability: “Anyone can measure the rain; we build arks.”
Assessment Update: 2012-2013 Preliminary Results
Department of AccountabilitySchool Board Meeting
August 22, 2013
![Page 2: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/2.jpg)
2
Federal Annual Measurable Objectives (AMO)
Replaced Annual Yearly Progress (AYP)
Measures participation and achievement levels in reading and mathematics
Reports the percent of students passing across nine subgroups at the state, division, and school levels
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 3: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/3.jpg)
3
Federal Annual Measurable Objectives (AMO)
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 4: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/4.jpg)
4
Federal Annual Measurable Objectives (AMO)
Federal AMO’s can be met by:Exceeding the AMO based on
current year’s performanceExceeding the AMO based on a 3
year averageReducing the previous year’s
failure rate by 10%Having less than 30 students in a
subgroupDepartment of Accountability: “Anyone can measure the rain; we build arks.”
![Page 5: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/5.jpg)
5
Preliminary AMO Division Reading Performance
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 6: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/6.jpg)
6
Preliminary AMO Division Mathematics Performance
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 7: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/7.jpg)
7
Example of AMOs Accounting for Improvement: Patrick Henry Math
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 8: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/8.jpg)
8
State Accreditation
Measures achievement levels in English (Reading and Writing SOLs combined), mathematics, history, and science.
Only accounts for the “All Student” pass rates in each of the four academic areas.
Accreditation benchmarks were elevated this year in grades 6-12 English (+5%), grade 3 History (+20%), and grade 3 Science (+20%)
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 9: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/9.jpg)
9
Preliminary Accreditation Results 2013-2014
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 10: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/10.jpg)
10
Historical Accreditation Status
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 11: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/11.jpg)
11
Preliminary Advanced Placement (AP) Results
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 12: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/12.jpg)
12
Scholastic Reading Inventory (SRI) Data
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 13: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/13.jpg)
13
Phonological Awareness Literacy Screening (PALS) Cohort Report
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 14: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/14.jpg)
14
Phonological Awareness Literacy Screening (PALS) Growth Report
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 15: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/15.jpg)
15
Coming Soon…
SATACTWIDA ACCESS for ELLsVA On-Time Graduation and
Dropout StatisticsAdditional SOL and AP analyses as
data become available
Department of Accountability: “Anyone can measure the rain; we build arks.”
![Page 16: Assessment Update: 2012-2013 Preliminary Results](https://reader035.vdocuments.site/reader035/viewer/2022062411/56816741550346895ddbf565/html5/thumbnails/16.jpg)
16
Questions?
Contact:Department of Accountability
(703) 824-6638or
Email: [email protected]
Department of Accountability: “Anyone can measure the rain; we build arks.”