Assembly Manual- Wide Scaffold IMPORTANT: It is the operator’s duty to inspect the components for damage before each use. Avoid contact with acid as this will damge the aluminium beyond repair. Avoid leaving the platform out under constant sun's light and rain to prevent delamination.In accordance with Australian Note: The double width tower sold does not have an inbuilt ladder. Ladders are sold separately. Platform with Hatch Horizontal Brace 8” Castor Adjustable Wheel Adjustable Stabiliser Platform with hatch 5 Rung Ladder Frame Diagonal Brace (Blue) Guard Rail Horizontal Brace (Yellow) Toeboards Ladders omitted for clarity. Insert the adjustable wheels into the legs of the frame. Lock the wheels with the lock pins, and brakes. Position the ladder frame as shown. Lock the wheels, and clip the horizontal braces onto the rungs Clip on diagonal braces onto the lowest rung in opposing directions. Ensure to lock them entirely. Frame is now self supporting. Locate the platform on 2nd rung (approx 1.0m) level. Install the next set of diagonal braces. Add next lift of 5 rung ladder frames. Install the platform on 5th rung (approx 2.0m) Add the adjustable stabilisers, then lock them entirely. Do not climb the platform until fully guardrailed. Continue steps 5 and 6 until required working height is reached. Erect guardrails and horizontal braces. Guardrails should extend1.0m past the platform in all cases. Do not climb to next platform until it is fully guardrailed. Fit toeboards to all working platforms. Install ladders to all platforms. 5 Rung Ladder Frame 1 2 3 4 5 6 7 8 9 A typical 6.0m high Wide Scaffold Other Sizes and Combinations Available | Melbourne: 03 9357 6388 | Perth: 08 9437 9389 Sydney: 02 9725 5233 Brisbane: 0421 723 687

Upload: others

Post on 22-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Assembly Manual- Wide Scaffold · the platform out under constant sun's light and rain to prevent delamination.In accordance with Australian Note: The double width tower sold does

Assembly Manual- Wide Scaffold

IMPORTANT: It is the operator’s duty to inspect the components for damage before each use. Avoid contact with acid as this will damge the aluminium beyond repair. Avoid leavingthe platform out under constant sun's light and rain to prevent delamination.In accordance with Australian

Note: The double width tower sold does not have an inbuilt ladder. Ladders are sold separately.

Platformwith Hatch

Horizontal Brace8” CastorAdjustable

Wheel

AdjustableStabiliser

Platformwith hatch

5 RungLadder Frame

DiagonalBrace(Blue)

Guard Rail Horizontal Brace

(Yellow)

Toeboards

Ladders omitted for clarity.

Insert the adjustable wheels into the legs of the frame. Lock the wheels with the lock pins, and brakes.

Position the ladder frame as shown.Lock the wheels, and clip the horizontalbraces onto the rungs

Clip on diagonal braces onto the lowestrung in opposing directions. Ensure to lockthem entirely. Frame is now self supporting.

Locate the platform on 2nd rung (approx 1.0m)

level.

Install the next set of diagonal braces. Addnext lift of 5 rung ladder frames.

Install the platform on 5th rung (approx 2.0m)

Add the adjustable stabilisers, then lock them entirely. Do not climb the platform until fully guardrailed.

Continue steps 5 and 6 until required working height is reached. Erect guardrails and horizontal braces. Guardrails should extend1.0m past the platform in all cases. Do not climb to next platform until it isfully guardrailed.

Fit toeboards to all working platforms. Install ladders to all platforms.

5 Rung LadderFrame

1

2

3

4

5

6

7

8

9

A typical 6.0m high Wide ScaffoldOther Sizes and Combinations Available