Assembly Instructions. Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing List Grating Distribution Drawing Bundle Distribution Drawing. This section covers the Units that have the same configuration - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Assembly Instructions

Assembly Instructions

• Additional documents needed for Assembly:• GA Drawings on all Units• Header Platform GA Drawings• Motor Deck Platform GA Drawing• Packing List• Grating Distribution Drawing• Bundle Distribution Drawing

Page 2: Assembly Instructions

This section covers the Units that have the same configuration as modules, meaning they do not have extension motor platforms next to it. This units are: 109/209, 103A/BC, 203A/B/C, 106A/B/C, 206A/B/C.

First Tip:You would know which is the front partOf the module when you see the motorsOn the unit on your right hand side

Second Tip:The front part of the module facesWest on its final place, except for Unit C111 and C211

Page 3: Assembly Instructions

Tube Bundles where packed as showed on the picture, there are several things you should know before installation.1) The supporting legs have to be removed before placing the into the wind box. 2) You should save the bolts removed as spares for installation.3) You should not removed wood covering, nitrogen purge and header feet until units are completely installed.

Third tip:

You would recognize the right and left tube bundles on a units with 2 tube bundles, by looking underneath the tube bundle and findingThe motor removal beam with its lifting lug. To match the exactly tube bundle for each unit you should refer to Drawing Named Tube Bundle distribution.

Page 4: Assembly Instructions

1)Find the matching tube Bundle and place it on the side of its corresponding wind box module 2) Each tube bundle will need 12 Bolts, Nuts and Washer, 5/8” x 2” ( This bolts were used for shipping, They are not in the packing list. They are being sent separately into the refinery)3) Lift the bundle and removed the legs (Save the Bolts)

Page 5: Assembly Instructions

Use guide rods the help you match the wind box holes against the tube bundles. Removed the guides and place the bolts. Do not tight down bolts until you have both bundles in place and aligned.After placing the 2 tube bundles on top and you have all bolts in position, you can hoist each tube bundle separately forward and Backwards to match the distance between center of nozzles and column legs. ( Refer to each unit GA Drawing)

Page 6: Assembly Instructions
Page 7: Assembly Instructions

After installing the bundles you have to place the wind seal between tube bundles2 Wind seal plates are provided with units with double bundles. The wind seals are located loose inside each wind boxFor this assembly you will need 16 Bolts,Nuts and washers 5/8” x 2” per each wind seal.This assembly is done once the tube bundles are on top of the unit and before the final alingment.To do this operation you would have to remove the fan guard access to the wind box and get inside.

Wind Seals

Page 8: Assembly Instructions

Motor RemovalBeam.

Page 9: Assembly Instructions

Now Proceed with the final alignment, hoisting back and forward.

Tip: Do not used cranes for this operation, movement need to be controlled for exact distances.

Page 10: Assembly Instructions

You need to place the for clips between tube bundles as showed on the picture. This clips are already bolted to one of the tube bundles, Could either one right or left. the clip should be moved perpendicular to the side frame and bolted onto the nest tube bundle. For this operation you will need 4 Bolts, Nuts and washers 5/8” x 2” ( They are provide in the box send directly to the refinery)

Page 11: Assembly Instructions

The Holes in the plywood are provided so that the operation can be done without removing it.

Page 12: Assembly Instructions

Lose the bolting that attaches the upper columns to the platform modules, They should be bolts of ¾” ( Save them to Bolt the Bottom columns Upper columns) Lift the complete unit and place it on the side.

Page 13: Assembly Instructions

1)Remove from the platform the packed columns ( Each unit has its own columns packed with steel straps and they are attached to the platform) 2) Remove 24 Bolts, Nuts, Washers and Pressure washers 7/8” x3” packed on a wooden box attached to the platform)3) All the columns are marked like this:

Tag# BFRCTag# BCRC

Tag# BRRC

Tag # BFLC

Tag # BCLC

Tag# BRLC

Page 14: Assembly Instructions

1

2

3

4

5

6

7

Each module of the standard modules are have an extension to the Left that is supported by 7 Little Beams, the are packed strapped on top ofThe platform module, the are marked, 1,2,3,4,5,6,and 7 respectively. They are bolted using two bolts of ¾” x 2-1/4” per each beam, a total of 28 Bolts are needed for the 7 beams and they are packed in the wooden box attached to the platform.

Front Part ( Inlet/Outlet Header Side)

Page 15: Assembly Instructions

Module ready to be Lifted to its final place on the Rack.You should leave the rest of the packed stuff attached to the module because you are going to need it for final Installation.

Page 16: Assembly Instructions

Place the Platform on the rack, Bolts for this operation are not part of Caltuca’s Scope of supply.

Page 17: Assembly Instructions

You should repeat the steps shown up to now for the next contiguous unit so that you have working floor for installing the coolers on its finalPosition. Bolt the two platforms against each other, use the same ¾ x 2-1/4” bolts that attaches the little beams.

Page 18: Assembly Instructions

Place the cooler in position, Matched the markings on each column and bolts them together using the saved ¾” bolts when removing the unitFrom the platform.

Page 19: Assembly Instructions

BracesMarked tag# FMB

Front, Midlle and BackBraces

Side braces

Remove the yellow shipping Braces.There are 12 Column braces Attached to the Platform, 6 Front Middle and Back Marked FMB and 6 Side Braces Marked SB. Each are attached using4 Bolts, Nuts and Washers 5/8” x 1-3/4” and they are located in the wood boxed attached to the platform.

Tip: The Middle side brace should be attached leaning towards the Heaviest Header.Tip: Always Position the brace to the inside of the clips attached to the wind box.Tip: For slotted holes use flat washers.

Page 20: Assembly Instructions

There are 2 Pieces of grating Packed in each Platform, they are equally in sizes, for installation you should matched the holes on the gratings Towards the east and west side of the platform. There are 14 G-Clips packed in Unit which means you will be using 7 per section. Located themSo that the Grating will be held bay the lower little beams.

Paked grating

Position to be placed

Page 21: Assembly Instructions

This is how it looks when finished. Continue this procedure for the rest: 109/209, 103A/BC, 203A/B/C, 106A/B/C, 206A/B/C.

Page 22: Assembly Instructions

This part of the procedure cover the assembly of units 103D/203D attached to the central platform and then to Units 106A/106B

Page 23: Assembly Instructions

Follow instructions as Showed in Slide 1-4

Page 24: Assembly Instructions
Page 25: Assembly Instructions
Page 26: Assembly Instructions

2

3

4

5

6

78

910,11,12

The beams are attached to Platforms of 103D/203D, there are 11. The bolts are also on a wooden box attached to the platform, the boltsNeeded for this assembly are ¾” x 2-1/2”

Page 27: Assembly Instructions

Lift the unit into its final position and bolted against the rack ( Bolting of this section is not part of Caltuca’s Scope)

Page 28: Assembly Instructions

Module 103D/203D

Module 106A/206A

Hand rail Packed on unit 103D/203DUse 5/8” x 1-3/4” Bolting Packed on Wooden Box attacehd to Platform

Hand rail Packed on unit 103D/203D

Page 29: Assembly Instructions
Page 30: Assembly Instructions

Gratin Packed on Platform 103/103DFor distribution see Grating Distribution Drawing32 G Clips are Provided in the wooden box attaced to the platform Extra G Clips Packed on Wooden Box in Flat Rack No.9

Page 31: Assembly Instructions

This section Covers Units 111/211 and 106D/206D

2

34

5

6

78

9

1011

12

On unit 111 there are 11 pieces to attach ( located in Flat rack No 9) Marked 2,3,4,5,6,7,8,9,10,11,12.On unit 106 the pieces are identical in shape, ( Located in Flat rack No.9) Marked 2,3,4,5,6,7,8,9,10,11,12,13 and longer in sizeBolting is located on wooden box attached to the platform and the size are ¾ x 2-1/4”

Page 32: Assembly Instructions

This channel is strap on to the W21 spanning beam at the side of the PlatformBolting for this beam located on wooden box attached to PlatformBolt size ¾” x 2-1/2”

Good for Units 111/211, 106D,206D

Page 33: Assembly Instructions

Follow This step For Units 111/211 Only, 106D and 206D do not have this extension

Page 34: Assembly Instructions

This Handrails are located in Flat rack No 9

This handrails are Packed on Each units Platform

Good For Units 111,211,106D,206D

Page 35: Assembly Instructions
Page 36: Assembly Instructions

Each Hand Rail Attaches together with 3 Bolts 5/8” x 1-3/4”Provided for each unit also on the wood box

For grating distribution see the drawing named grating Distribution Look for Noth extension on Unit 106D/206D andSouth extension for 111/211

Page 37: Assembly Instructions
Page 38: Assembly Instructions
Page 39: Assembly Instructions

1.Take the matching platform out of theFlat rack. They should be identify as:

TAG# ___ Inlet Header Platform andTAG#____ Return Header Platform

2. the 4 Braces are Attached toMotor platform on each unit Identify as :TAG#___ PB.The 4 braces are equal in size.

3. Bolt each top extreme ofThe braces to the clip locatedUnderneath the Platform. Use5/8” x 2” Bolts with 5/8” Nut and1 pressure washer and 1 Flat washer

TOTAL TOTAL MATERIAL FOR THIS ASSEMBLYSEMBLY

1 Inlet Header Platform1 Return Header Platform4 Platform Braces8 Bolts 5/8” x 2”8 Nuts 5/8”4 Pressure Washers4 Plane Washers

Page 40: Assembly Instructions

Take the previous assembly and bolt itTo the air cooler top column clip, use¾” x 2-1/2” Bolts with ¾” nuts and PressureWashers. Total needed for unit assembly16 Bolts ¾” x 2-1/2” 16 Nuts ¾”16 Pressure washers