ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi-110024. ____________________________________________________________ No: APGCL/CGM(H)/W/140/Pt-III/65 Dated : 01/11/2013. To Director (IA), Ministry of Environment & Forest, ‘Paryavaran’ Bhawan, CGO Complex, Lodi Road, New Delhi-110003. (Telefax No:011 24362827). Sub: Lower Kopili H.E. Project (120 MW)- For reconsideration of TOR-regarding. Ref: i)Minute of the 68 th meeting of the EAC, MoEF held on 24.09.2013. ii) APGCL/CGM(H)/W/140/Pt-III/63 Dated : 29/10/2013. Sir, In supersession to this office letter under reference ii), I would like to inform you that the cost of the proposed Lower Kopili H.E. Project (120 MW) of Rs. 1489.64 Crores has been worked out after consideration of special protective measures proposed to be undertaken for various H/M & E/M equipment, water exposed concrete of Lower Kopili H.E. Project due to the acidity problem of the River Kopili. I would also like to inform you that the Government of Assam is fully aware of the matter. In the executive meeting of Assam Infrastructure Financing Authority (AIFA), held on 05.07.2012 under the Presidentship of the Hon’ble Chief Minister of Assam, Shri Tarun Gogoi, it was agreed that Government of Assam would bear the 30% (Rs. 450.00 Crore) equity component of the project (copy enclosed). Further, the Asian Development Bank has agreed to give loan to the Lower Kopili H.E project to the tune of US $ 200 Million. Detailed financial and technical status were apprised to ADB. The loan proposal was also placed for deliberation in its 33 rd screening committee meeting of Deptt of Economic Affairs MoF, GoI held on 13.9.2013. , wherein, the screening committee has agreed to pose US $ 300 Million (inclusive of US $ 200 Million for Lower Kopili H.E project) loan proposal to ADB. Copies of the minutes of the meetings are enclosed herewith for your ready reference. Additional points proposed for the TOR is also enclosed herewith.

Upload: others

Post on 26-May-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma

ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma

Resident Engineer ASEB, E-8,

Lajpat Nagar-II, New Delhi-110024.

____________________________________________________________ No: APGCL/CGM(H)/W/140/Pt-III/65 Dated : 01/11/2013.

To

Director (IA), Ministry of Environment & Forest,

‘Paryavaran’ Bhawan, CGO Complex, Lodi Road, New Delhi-110003. (Telefax No:011 24362827).

Sub: Lower Kopili H.E. Project (120 MW)- For reconsideration of TOR-regarding. Ref: i)Minute of the 68th meeting of the EAC, MoEF held on 24.09.2013. ii) APGCL/CGM(H)/W/140/Pt-III/63 Dated : 29/10/2013.

Sir, In supersession to this office letter under reference ii), I would like to inform

you that the cost of the proposed Lower Kopili H.E. Project (120 MW) of Rs. 1489.64

Crores has been worked out after consideration of special protective measures

proposed to be undertaken for various H/M & E/M equipment, water exposed

concrete of Lower Kopili H.E. Project due to the acidity problem of the River Kopili.

I would also like to inform you that the Government of Assam is fully aware

of the matter. In the executive meeting of Assam Infrastructure Financing Authority

(AIFA), held on 05.07.2012 under the Presidentship of the Hon’ble Chief Minister of

Assam, Shri Tarun Gogoi, it was agreed that Government of Assam would bear the

30% (Rs. 450.00 Crore) equity component of the project (copy enclosed).

Further, the Asian Development Bank has agreed to give loan to the Lower

Kopili H.E project to the tune of US $ 200 Million. Detailed financial and technical

status were apprised to ADB. The loan proposal was also placed for deliberation in its

33rd screening committee meeting of Deptt of Economic Affairs MoF, GoI held on

13.9.2013. , wherein, the screening committee has agreed to pose US $ 300 Million

(inclusive of US $ 200 Million for Lower Kopili H.E project) loan proposal to ADB.

Copies of the minutes of the meetings are enclosed herewith for your ready

reference.

Additional points proposed for the TOR is also enclosed herewith.

Page 2: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma

The point wise reply to the observations of South Asia Network of Dam River

People (SANDROP) on Lower Kopili H.E Project is also enclosed herewith for your

needful action please.

.

Enclo: as above. Thank You. Yours faithfully,

(H.M. Sharma) Resident Engineer (Liaison), APGCL

C.C to:

1. The Managing Director, APGCL, Bijulee Bhawan, Paltan bazaar, Guwahati-1, for kind information.

2. The Chief General Manager(Hydro), APGCL, Bijulee Bhawan, Paltan

Bazaar, Guwahati-1:for information. 3. Dr. Aman Sharma.General Manager (Envt),WAPCOS Ltd.76-C, Sector

18,Gurgaon-122015,Haryana,Fax:0124-2397392:for information. 4. The Relevant File.

Page 3: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma

POINT WISE REPLY TO THE OBSERVATIONS OF SOUTH ASIA NETWORK OF

DAM RIVER PEOPLE (SANDROP) ON LOWER KOPILI H.E. PROJECT.

1. Dam Induced Flood.

In general the floods occur, due to heavy precipitations in a shorter duration effecting the

temporal distribution of storm rainfall (which highlight intensity of rainfall during different times

of rain duration). The highest intensity of rainfall decides the time of occurrence of peak flood,

magnitude of peak discharge and consequently, water level rises in the river. In fact the

construction of dams at different stages of the river will support the flood moderation to some

extent.

The catastrophic flood on 18th

July’ 2004 as stated is mainly due to high intensity of

rainfall in the upper catchment of Kopili River (upstream of Khandong Dam). It reveals from

available rainfall records that in the month of July’ 2004 the monthly rainfall recorded is of the

highest order i.e. 2372.80 mm at Jowai (during the period from 1983 to 2005) and of the order of

729.50 mm at Garampani (during the period from 1963 to 2006). It is also evident from the flood

damage data of the affected Revenue Circles of Nagaon district viz. Doboka ,Hojai, Kampur &

Raha from 1995-2013 that there was heavy flood during the year 2004.

It is stated that water level in the Khandong reservoir went upto 727.70 m against FRL of

719.30 m. But the MWL of the reservoir is not mentioned. The reservoir can be filled upto

M.W.L. and normally the dam is designed for this level. Moreover there is no gate installed at

the Khandong Dam and flood release from the reservoir due to gate operation does not arise.

Excess inflow due to heavy rainfall in the catchment is passing over the dam after the attaining

M.W.L. of the reservoir.

In this context, it may be mentioned that construction of another dam about 25 Km

downstream of the existing Khandong Dam will moderate the flood due to inflow from the

undisturbed intervening catchment area of 788 Sq Km between Khandong dam and proposed

Lower Kopili dam and excess inflow that spilled over from the Khandong reservoir. Moreover,

the Lower Kopili Dam is designed for maximum flood of 11030 Cumecs based on IMD data of

precipitation over the entire catchment area covering Khandong and Lower Kopili Dam i.e. of

1288 Sq km & 788 Sq km. respectively (total area of 2076 Sq Km). The design flood (PMF) for

Lower Kopili H.E project of 11030 Cumecs was approved by C.W.C on 30.10.2012.

The downstream impact due to flood could only be averted with prior warning to the

people who reside in the riverine area. During operation of gates of LKHEP.APGCL will install

such system in coordination with District Administration and Local people.

As stated by SANDRP, the major tributary Myntang of Kopili river having a catchment

area of 512 Sq KM is included in the intervening catchment area of 788 Sq Km of Lower Kopili

Dam .As such the inflow from Myntang river already included in the design flood of 11030

Cumec for LKHEP and approved by CWC in 2012.

Page 4: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma

2. Inadequate Spillway Capacity at proposed Lower Kopili H.E. Project.

The design spillway capacity of the proposed LKHEP is not as mentioned of 16110

Cumec. It is evaluated as 11030 Cumec which has been approved by CWC after detailed

hydrological study made with H.M. data acquired from IMD Pune & New Delhi as stated in the

para 1 above. The Lower Kopili Dam is designed for the above capacity which is inclusive of

excess water spill over from Khandong Dam and inflow from the intervening undisturbed

catchment area of 788 sq km upto Lower Kopili Dam. . Hence the design spillway capacity of

LKHEP is adequate to pass off the PMF of 11030 Cumec.

3. Acidity of the water in River Kopili.

Water of Kopili River is acidic at the proposed LKHE project site. Therefore special

measures are to be adopted, to protect the Electro mechanical and Hydro mechanical equipment

and river water exposed surface of concrete of the Proposed project.

APGCL has taken the following decisions:-

i) Adopt similar measures taken by MeSEB for Myntdu Leshka HEP, Meghalaya.

ii) Stainless steel to be provided to all H.M. and E/M equipment, reinforcement,

steel liner etc.

ii) Concrete admixtures to be used for all water contact surface to mitigate adverse

impact of acidity.

iii) Avail expert consultancy from CWC for acidity problems.

This is the one of the reason for enhancement of project cost . It may be stated that

activity of the proposed LKHEP would not aggravate any acidity factor in the river and in its

downstream during as well as in post construction stage, the acidity in the river is only due to

open cast mining in the upper catchment areas located in the state of Meghalaya.

Similar problems have been experiencing by NEEPCO as well as by MeSEB for Kopili

and Myntdu Leshka HEP respectively. The MeSEB has proposed to use acid resistant coated steel

materials which were tested at CSMRS lab during July 2013.The test results revealed that the

coated materials found suitable to resist acidic hydro environment and no major deterioration of

the paint and colour.

4. GSI NE region had done extensive details surface and sub-surface geotechnical

investigation since 1979-80 to 1985-86 and 2008-09 to 2012-13. Locations of various

components were fixed as per the guidance of Engg Geology Division GSI, Shillong.

GSI in its Geo technical report for LKHEP has mentioned about the existence of

Dhansiri- Kopili fault located near to the project site (refer Plate-III of the report, enclosed). As

per available records, major Earth Quake > 5 in Ritcher Scale were occurred during the period

1901-93 within 50KM radius of the proposed project site (Refer: Plate-II of the report).

Page 5: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma

IIT Roorkee inter alia considered the aforesaid report while carrying out studies for

determination of site specific design Earth Quake Parameters for LKHEP (June 2012). Based on

these parameters, design of various project components have been done.

Further, APGCL has already initiated actions to install 3-4 seismographs network at the proposed

LKHEP site for MEQ studies. As per Central Water Commission (Guidelines for Preparation and

Submission of Site Specific Seismic Study Report of River Valley Project to National Committee

on Seismic Design Parameters), for dams exceeding the height of 100 m, the details of micro

earthquake data recordings around the dam site within a radius of 50 km should be provided

incorporating full catalogue information for a period of at least six months. The maximum height

of the proposed Lower Kopili H.E. Project dam is only 70.13 m.

5. APGCL presented the project before the EAC in three occasions i.e. Dec’12, March’ 13

and latest on 24the September’ 2013. Based on the observations of EAC, APGCL has reviewed

the land area to be acquired for the project.. Compensation to project affected families will be

given as per the norms of NRRP-2007 of Government of India.

6. Form-I has been revised considering observations of EAC. Area and land use pattern to be

acquired have also been revised in item 1.1.of Form-I. Hence the revised Form-I submitted on

23.08.2013 should be treated as final.

7. APGCL is committed to address the local issues particularly project Affected Families with

priority.

8.Reservoir submergence was shown as 620 Ha in the earlier PFR.In the said PFR, a provision of

2.00 m above the MWL of 229.60 m was kept in the reservoir area of 620 Ha as a cushion for

allowance of any subsidence on the reservoir periphery due to draw down effect of fluctuation of

water level. To comply the observation of EAC, the land area under submergence has been re

assessed as 552.00Ha considering submergence in the reservoir area upto MWL only.

Page 6: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 7: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 8: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 9: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 10: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 11: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 12: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 13: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 14: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma
Page 15: ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma ...environmentclearance.nic.in/writereaddata/Public Hearing/Folder7... · ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma