aspirational mice schedule as of april 2008
DESCRIPTION
Aspirational MICE Schedule as of April 2008. m. STEP I. Febuary-July 2008. STEP II. September 2008. UK PHASE I. STEP III/III.1. November 2008 to summer 2009. UK PHASE II. STEP IV. Delivery of 1st FC october 2009!. STEP V. spring 2010. STEP VI. Q4 2010 -2011. m. STEP I. - PowerPoint PPT PresentationTRANSCRIPT
1Alain Blondel 4 April 2008
Aspirational MICE Schedule as of April 2008
Febuary-July 2008
STEP I
September 2008
November 2008 to summer 2009
STEP II
STEP IV Delivery of 1st FCoctober 2009!
STEP Vspring 2010
STEP VIQ4 2010 -2011
STEP III/III.1
UK PHASE I
UK PHASE II
2Alain Blondel 4 April 2008
Febuary-July 2008
STEP I
Muon beam line
2 dipoles 9 quads, PS, controls RAL, DL
Decays solenoid PSI
Decay solenoid cryo and PS, controls RAL
Target system Sheffield, DL
Hall infrastructure, shielding, beam stop RAL
detectors
TOF0 and TOF1 MIB, INFN,GVA
CKOV A,B Mississipi
KL calorimeter Roma3 INFN
Front end electronics, DAQ, trigger GVA, INFN
Control room MICE-UK
Software MICE coll
Beam monitors FNAL, ICL, GVA
Detector cabling and installation RAL, DL
Safety equipment RAL
3Alain Blondel 4 April 2008
September 2008STEP II
Beam diffuser Oxford
TOF1 cage GVA
TrackerI UK, USA, JP
Spectrometer solenoidI LBNL
Magnetic measurements
FNAL
Magnetic probes NIKHEF
TOF2(optional) MIB INFN
Magnetic shielding RAL
Software MICE
4Alain Blondel 4 April 2008
November 2008 to summer 2009STEP III/III.1
False floor RAL
TrackerII UK, USA, JP
Spectrometer SolenoidII LBNL
Magnetic measurements FNAL
Magnetic probes NIKHEF
TOF2 MIB INFN
Spool piece GVA
Absorbers (LiH…) FNAL
Software MICE
SW muon ranger FNAL, GVA, Trieste/INFN
5Alain Blondel 4 April 2008
STEP IV Delivery of 1st FCoctober 2009!
Liquid Hydrogen infrastructure RAL
Focus coil magnet RAL, Oxford
Magnetic measurements ?
Liquid hydrogen absorber and instrumentation
KEK
Liquid Hydrogen and safety windows
Mississipi
Software, controls MICE
6Alain Blondel 4 April 2008
STEP Vspring 2010
RF in Mag fied R&D MUCOOL NFMCC
RF cavities (1+4) LBNL
2 Coupling coils (MUCOOL+ MICE CCI) ICST-HIT, LBNL
CCI Magnetic measurements FNAL
RF Power sources parts 4+4MW CERN, LBNL
RF refurbishment 4+4 MW CERN, DL
RF infrastructure 4 cavities DL, RAL
Liquid Hydrogen infrastructure (II) RAL
Focus coil magnet II RAL, Oxford
FC Magnetic measurements ?
Liquid hydrogen absorber II KEK
Liquid Hydrogen and safety windows II Mississipi
RF Shield ORFAN
Software, controls MICE
7Alain Blondel 4 April 2008
STEP VIQ4 2010 -2011
RF cavities (4) LBNL
Coupling coil (MICE CCII) ICST-HIT, LBNL
CCII Magnetic measurements FNAL
RF infrastructure 4 cavities DL, RAL
Liquid Hydrogen infrastructure (III) RAL
Focus coil magnet III RAL, Oxford
FC Magnetic measurements ?
Liquid hydrogen absorber III KEK
Liquid Hydrogen and safety windows III Mississipi