ASME Gas Lift Workshop Spring 2004. Dual Gas Lift Breakout Session February 10, 2004. Problems Successes Gas Lift Design. Dual Gas Lift. Surveillance Upper / Lower string communication Wire line work more risky on dual wells Interference between strings – gas robbing - PowerPoint PPT PresentationTRANSCRIPT
ASME Gas Lift Workshop ASME Gas Lift Workshop Spring 2004Spring 2004
Dual Gas Lift Breakout SessionDual Gas Lift Breakout Session
February 10, 2004February 10, 2004
Dual Gas LiftDual Gas Lift
ProblemsProblems
SuccessesSuccesses
Gas Lift DesignGas Lift Design
Dual Gas Lift ProblemsDual Gas Lift Problems
SurveillanceSurveillance Upper / Lower string communicationUpper / Lower string communication Wire line work more risky on dual wellsWire line work more risky on dual wells Interference between strings – gas robbingInterference between strings – gas robbing Need more detailed accurate information Need more detailed accurate information
for better designfor better design Heading problems – fluctuating casing Heading problems – fluctuating casing
pressure – general instabilitypressure – general instability Generally restricted to using 1” valves.Generally restricted to using 1” valves.
Dual Gas Lift SuccessesDual Gas Lift Successes
Use of PPO unloading valves on both strings – operate Use of PPO unloading valves on both strings – operate best string on an orifice and the other on an IPO valve.best string on an orifice and the other on an IPO valve.
Use of venturi valve Use of venturi valve Use of shear orifice valve – enables packer test and Use of shear orifice valve – enables packer test and
ability to later to kick-off flowing well if needed.ability to later to kick-off flowing well if needed. Minimize back pressure, maximize gas lift injection Minimize back pressure, maximize gas lift injection
pressurepressure Maximize design effectiveness with good data to start Maximize design effectiveness with good data to start
withwith Properly trained well operators – troubleshooting – Properly trained well operators – troubleshooting –
need written procedures for testing/optimizing wellsneed written procedures for testing/optimizing wells Willingness of the Operator to spend the money and Willingness of the Operator to spend the money and
time to get measured data (accurate meters, flowing time to get measured data (accurate meters, flowing surveys, etc.)surveys, etc.)
Improved monitoring and control via Improved monitoring and control via automation/SCADA.automation/SCADA.
Dual Gas Lift DesignDual Gas Lift Design
Design each string independently of the other.Design each string independently of the other. Use PPO mandrel spacing to ensure close mandrel Use PPO mandrel spacing to ensure close mandrel
spacing in both strings – don’t “skimp” on mandrels.spacing in both strings – don’t “skimp” on mandrels. A re-design of valve placement and set pressures may A re-design of valve placement and set pressures may
be required after well is unloaded and well performance be required after well is unloaded and well performance is better understood.is better understood.
Verify design performance after well is stabilized – Use Verify design performance after well is stabilized – Use the tools:the tools:– 2 pen or multi-pen pressure recorder2 pen or multi-pen pressure recorder– Flowing pressure/temp surveys with coinciding well testFlowing pressure/temp surveys with coinciding well test
Evaluate the well test, design and flowing survey dataEvaluate the well test, design and flowing survey data Do not oversize valve port sizesDo not oversize valve port sizes Use dynamic valve flow testing data if available.Use dynamic valve flow testing data if available.