asif cv
TRANSCRIPT
MUHAMMAD ASIF Mobile: +966580057754
Mobile: +923473835054
E-mail:[email protected]
OBJECTIVE: - After having the highest level of exposure in years in fastest growing companieswill set new standards in my career my capabilities, team working skill to make a positive impact with a growingResult oriented, enthusiastic, with p
QUALIFICATION:
Bachelor of Technology (Honor
Bachelor of Technology (Pass) From Newports Institute of Communication & economics
Three year “Diploma of Associate EngineerTechnology from Sindh board of technical education Karachi Pakistan
Matric in “Electrical” With B grade in 2003Pakistan.
Work Experience: Gulf exp. eight
April 2014 to Present:
Position
Projects Handled:
Job Responsibilities:
Responsible for all kind of MEP Inspection mechanical and electrical work Responsible for potable water, irrigation and Electrical infrastructure works Make logbook entry report for any deficiency of work observed during the conduct of
inspection.
Daily site visit for checking and take update Responsible for performing work on site without any deficiency Responsible for potable water,
performing according to specific Ensure that contractor provide
5 years above gulf extensive experience in the field of and Commissioning of MEP and LP Gas diesel system installation & maintenance work . Ability to Handle Big projects, Achieve Target dates, and skilled workers, Convince the consultants for theMonthly look ahead’s, Estimating Man
Eight years above gulf extensive experience in the field Electrical, Mechanical, Infrastructure, tower, Commissioning & maintenance work . Ability to Handle Big projects, Achieve Target dates, Preparing NCR coordinate with professional and skilled workersPlanning for Weekly and Monthly
1
MUHAMMAD ASIF
After having the highest level of exposure in MEP Projects for the past years in fastest growing companies. I am looking for a challenging and creative position that
ill set new standards in my career and to obtain a challenging position, where I can utilize capabilities, team working skill to make a positive impact with a growing organization.
Result oriented, enthusiastic, with proven track record related to safe working
rs) is continue
(Pass) with 1st division in 2013 in ElectricalFrom Newports Institute of Communication & economics
Associate Engineer” with 1st division in 2006 Electrical Technology from Sindh board of technical education Karachi Pakistan
With B grade in 2003 from Sindh board of technical education Karachi
ulf exp. eight years Above + Pakistan exp.-3.6 years = 11
Saudi Arabian Parsons Ltd.
MEP Works Inspector
Al Madinah Housing Project (MOH)
for all kind of MEP Inspection mechanical and electrical workResponsible for potable water, irrigation and Electrical infrastructure works
logbook entry report for any deficiency of work observed during the conduct of
Daily site visit for checking and take update of completed work esponsible for performing work on site without any deficiency
for potable water, irrigation and electrical infrastructure work specifications and approved drawing.
provides and adhere to relevant quality documentation/records.
extensive experience in the field of HVAC Projects. Specializes in and Commissioning of MEP and LP Gas diesel system installation & maintenance work . Ability to Handle Big projects, Achieve Target dates, Preparing submittals, coordinate with professional
, Convince the consultants for the approval of Matering for Weekly and Monthly look ahead’s, Estimating Man-hours and Material requireme
sive experience in the field of MEP works ProjectsMechanical, Infrastructure, tower, LP Gas and diesel system installation
maintenance work . Ability to Handle Big projects, Achieve Target dates, coordinate with professional and skilled workers, and Co-ordination meetings,
Planning for Weekly and Monthly look ahead’s, Estimate requirement for Variation
for the past elevenenging and creative position that
and to obtain a challenging position, where I can utilize organization.
Electrical
from Sindh board of technical education Karachi
3.6 years = 11.6 years
Al Madinah Housing Project (MOH)
logbook entry report for any deficiency of work observed during the conduct of
work
and adhere to relevant quality documentation/records.
. Specializes in Installation and Commissioning of MEP and LP Gas diesel system installation & maintenance work . Ability to
coordinate with professional ng for Weekly and
Projects. Specializes in installation
maintenance work . Ability to Handle Big projects, Achieve Target dates, ordination meetings,
e requirement for Variation or Reworks.
2
Ensure that contractor adheres to site safety regulations. Perform testing and commissioning of MEP installations. Prepare and submit Non
Compliance Report (NCR) for any deficiency of work reported which has not been corrected that elapsed within the given period time.
Inspect and review works corrected by the contractor to ensure compliance with the plans, specifications and with the standard engineering codes.
Feb 2010 to Dec 2013 Al-SABBAH Modern Elec & Mech Cont EST. OIL & GAS DIVISION DUBAI (AL FARAA GROUP)
Position MEP/site Engineer
Projects Handled:
1) JAL Tower at sheikh Zayed road, Dubai (UAE)2) Dubai Mall (Maintenance work) Dubai (UAE) 3) Dubai Festival city (Maintenance work) Dubai (UAE) 4) Labour accommodation Jabel Ali Dubai (UAE) 5) Admiral Plaza hotel at Bur Dubai (Maintenance work) Dubai (UAE) 6) The Manhattan Residential tower at Jumeirah Village South Dubai (UAE)7) Palm jumeira sofitel resort Dubai (UAE) 8) Al Arif labour camp (Al Quoz) Dubai (UAE) 9) G+6 Residential Bldg @ Al Raffa -Dubai – UAE10) Millennium Airport hotel (Maintenance work) Dubai (UAE) 11) Emirates airline staff building Maintenance work at Al Nahda Dubai (UAE) 12) Bab al bahr Hotel @ Ajman (UAE)13) Bagles & More Restaurant Dubai (UAE)
Job Responsibilities:
Co-ordination with Main Contractor site Staff for all the relating Contract(s) executionmatters.
Responsible for the supervision of technicians to ensure the efficiency and smooth operation of the projects
Monitoring the site progress and achieving the Target dates, co-ordinating Electrical & Mechanical works with other services like MEP and False ceiling works.
Installation testing commission for Electrical & Mechanical (LP Gas and diesel) system
Preparation of Project Schedule, Two week look Ahead, Weekly Man-Hours Details and Progress report, work Inspection, Material Inspection.
Monitoring and Implementation of Quality procedures for related Products/Material & Services.
Following of safety Norms during Handling/Shifting/Installation works. Directly reported to the manager and make suggestion for the smooth day to day
operation.
3
July 2007 to December 2009 Haif Contracting Company Dubai, UAE
Position Electrical Site Engineer
Projects Handled: 2B+G+10 Floor at International City, PLOT
NO: CBD-19, CBD-20 & CBD- 21Job Responsibilities:
Co-ordinate with all MEP subcontractors Site progress, Weekly & Monthly look ahead’s, Material & work inspections Attending progress meeting with client’s Consultants and Subcontractor Supervision of All MEP (Mechanical,Electrical,Plumbing) and building Maintenance
work DEWA Inspection -ETISALAT/DU approvals and Inspection All machines repairing and daily maintain working progress report Responsible for the supervision of technicians to ensure the efficiency and smooth
operation of the projects
Following of safety Norms during Handling/Shifting/Installation works. Directly reported to the manager and make suggestion for the smooth day to day
operation.
December 2003 to June 2007 Sindh Poultry Vaccine Centre, (Government of Sindh) Animal science complex korangi Karachi Pakistan Position Electrical Supervisor
Job Responsibilities:
Responsible for the entire plant stand by generator motor and their maintenance All types industrial wiring Panel controlling testing and maintenance work All types of Electrical and Electronic works
COMPUTER SKILLS:
Working knowledge of Computer, MS. Office, Internet and E-mail
Skills Summary
Ability to drive the installation progress by proper planning of Task and Material assignment to meet the target goals and deadlines.
Demonstrated experience with identifying, analyzing, and solving Problems Deal different kinds of people, efficient, organize and reliable Hard working, fast learner can do multi tasking and other task as may be
assigned Willing to work overtime and can work well under pressure w/ less
supervision Good organization and time management skills
PERSONAL INFORMATION:
Date of birth: 16 July 1983Passport No: AU1881542Visa Status: Residence VisaMarital Status: MarriedLanguages Known: English, Arabic, Hindi and PunjabiDriving License: Valid KSA & UAE driving license.