asian region civil design
DESCRIPTION
March 22, 2012 920 - 950. Asian Region Civil Design. Outline. Overview of Asian Civil Design Previous Case Study Feature of Beam Tunnel Tunnel Typical Cross Section Beam Tunnel RTML Damping Ring Access Hall and Access Tunnel Central Region Layout. Overview of Asian Civil Design. - PowerPoint PPT PresentationTRANSCRIPT
ASIAN REGION CIVIL DESIGN
March 22, 2012920 - 950
1
Outline Overview of Asian Civil Design
Previous Case Study Feature of Beam Tunnel Tunnel Typical Cross Section
Beam Tunnel RTML Damping Ring
Access Hall and Access Tunnel Central Region Layout
2
Overview of Asian Civil Design
Beam Tunnel ‘Kamaboko’ shape (by NATM) Separated by concrete radiation shield wall (t=3.5m)
Access Tunnel Sloped tunnel Two access tunnel for central region (for DR and D/H)
Access Hall Eight access halls for electric facilities, cooling water plant,
cryogenic plant, and the others 5km intervals is maximum because of He supply
Detector Hall IP point will be explained later 3
Case Study (Earlier Conclusion)
4
BT STAH
AT BTAH
ATBT SbT
AT
PM
BTAH
ATBT
AHAT
BT SbT AHAT
PMKL
BT SbT AHAT
LC
BT SbT AHAT
LC
Case 1 Case 2 Case 3 Case 4
Case 5 Case 6 Case 7 Case 8
AdoptedHaving the advantage with
considering a comprehensive view point (cost, schedule,
convenience..)
Feature of Beam Tunnel NATM (drill and blasting method) is adopted Single tunnel with concrete shield wall
(t=3.5m) Two galleries for beam line and service
tunnel (klystron) Help access to klystron side easily and
safely during operation and in case of evacuation
5
Typical tunnel section
Beam Tunnel Damping ring tunnel (straight part)
6
Damping Ring Tunnel (arc part)
RTML part of Beam TunnelShape is called Kamaboko
7
Access Hall & Access Tunnel
Access hall consists of individual cavern Vibration source is installed away from beam line Cold boxes are near beam line 8
He compressor
Cooling water plant
Electric facilities
Cold boxes
Beam T
Maintenance Hall
Maintenance Hall
9
Access Tunnel(sloped tunnel)
Access Tunnel(sloped Tunnel)
Beam T
A
Section A-A
Beam T
Detail
AE
E
Section E-E(Maintenance
Hall)
Section G-G(Access Tunnel)
Maintenance Hall
Beam Tunnel
G
G
He Compressor
Section F-F(He Compressor)
Cooling water, Plumbing sys
10
Section H-H(Cooling water,
Plumbing sys)
He CompressorCooling water, Plumbing sys
F F
B
B
H H
C
C
Section B-B
Section C-C
Cryogenic Plant Cryogeni
c Plant
Electric Facilities
Electric Facilities
11
Section J-J(Cryogenic Plant)
Section K-K(Electric Facilities)
D
D
Section D-D
J J
K K
I
I
Section I-I(Connection
Tunnel)
Central Region layout
12
Cold Box and Cooling System
He Compressor Unit
Cooling System
Cooling systems for normal conduction area (arc portion) He compressor unit for detector is installed at center of dumping
ring region Cold box is installed near superconducting area
Detail of junctional region
13
At junction part, service side is connected to opposite side by over-pass passage ways
Passage way
Beam Line
side
Beam Line side
Service side
Service
side
Service
sideService side
Passage way
Summary Kamaboko shape tunnel with concrete
shield wall is adopted for Beam Tunnel and straight part of Damping Ring
Sloped access tunnel is adopted Access hall consists of individual 4
caverns
14