![Page 1: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/1.jpg)
June 13, 2014
Ed Power, P.E.
ASHE National Conference Bismarck, ND
![Page 2: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/2.jpg)
Hoover Dam Bypass Project
� Is the “dam thing” done yet?
![Page 3: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/3.jpg)
Hoover Dam Bypass Project
� The Mike O’Callaghan-Pat Tillman Memorial Bridge
� Dedicated on October 14, 2010
![Page 4: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/4.jpg)
Hoover Dam Bypass Project
� Project Overview
� River Bridge Design Concept
� River Bridge Construction
![Page 5: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/5.jpg)
PROJECT OVERVIEW
![Page 6: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/6.jpg)
A Team Effort for a “Multi-Project”
� Lead Agency• Federal Highway Administration - Central Federal Lands Highway
Division
� Additional Stakeholders• Arizona DOT, Nevada DOT, National Park Service• Lake Mead National Recreation Area,• U.S. Bureau of Reclamation, Western Area Power Administration
� Environmental Consultant• CH2MHill
� Design Consultants – Hoover Support Team
• HDR• Sverdrup (Now Jacobs Engineering)• T.Y. Lin International
� Geotechnical Subconsultant• AMEC Earth and Environmental
![Page 7: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/7.jpg)
A Half-Century in the Making
1960sIdentification of Project Needs
1984Hoover Power Plant Act Authorizes Project
1995-1997Project Put on Hold
1990Environmental Process Begins
2001Design Begins
2001Final Environmental Impact Statement (FEIS) Released
Record of Decision Signed
2003Construction Begins
October 2010Dedication Ceremony
![Page 8: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/8.jpg)
An Existing Bottleneck on U.S. 93
� Original 2-lane roadway
� Major commercial corridor
� Major tourist attraction
� Long traffic backups
� Dangerous conditions
![Page 9: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/9.jpg)
� Remove trucks and through-traffic
� Remove U.S. 93 bottleneck
� Reduce traffic accidents
� Protect Hoover Dam facilities, workers and visitors
� Protect waters of the Colorado River
� Reduce interference with dam operations
� Enhance visitor experience
Project Had Many Objectives
![Page 10: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/10.jpg)
Hoover Dam Bypass – The Solution
![Page 11: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/11.jpg)
Project Features - NV
![Page 12: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/12.jpg)
Project Features - AZ
![Page 13: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/13.jpg)
Project Drive Through
![Page 14: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/14.jpg)
Project Schedule
![Page 15: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/15.jpg)
Four Construction Segments
![Page 16: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/16.jpg)
Reaching the Project Site
January 2005
� 3.3 million C.Y. of excavation
� 3.5 miles of new approach roadway
� Two years construction time
![Page 17: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/17.jpg)
RIVER BRIDGE DESIGN CONCEPT
![Page 18: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/18.jpg)
Various Bridge Types Considered
Arch
Cable-stay
Suspension
![Page 19: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/19.jpg)
Various Arch Alternatives Studied
Steel Solid Rib
Arch
Concrete
Arch
Composite
Arch
![Page 20: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/20.jpg)
Concrete-Steel Hybrid Arch Bridge Selection
� Classical arch
solution
� Met all project
requirements
� Constructability
� Compatibility
� Aesthetics
� Minimized costs
� Provided structural
redundancy
![Page 21: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/21.jpg)
Unique Design Features
� Hybrid Concept
� Arch ribs: cast-in-place concrete segmental
� 10,000 psi
� Columns: precast concrete segmental
� 6,000 psi
� Deck system
� Steel tub girders
� Cast-in-place concrete deck
![Page 22: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/22.jpg)
Benefits of Unique Arch Solution
Design Feature Benefit
Hybrid Design Concept Best use of concrete and steel for efficiency and economy
Fully continuous deck system Used to resist lateral loads
Twin arch ribs with diaphragms
Provided ductile frame action for seismic and wind resistance
![Page 23: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/23.jpg)
Geotechnical Investigations
� Laser Scanning
� 3-D rock profiles
� Faulted & fractured rock conditions
![Page 24: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/24.jpg)
� No record at site
� Historical record at airport
� 1 year correlation study� Measured site conditions
� Normal winds at 100 mph, gusts to 125 mph
� Wind tunnel testing
Site-Specific Wind Loading Studies
![Page 25: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/25.jpg)
General Bridge Data
� Overall length 1,905’
� Main Span 1,060’
� Spandrel Lengths 120’
� Column height up to 288’
� Bridge located 1500’ downstream from dam
� Bridge deck about 900’ above river
![Page 26: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/26.jpg)
RIVER BRIDGE CONSTRUCTION
![Page 27: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/27.jpg)
Unique Aspects of Construction
![Page 28: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/28.jpg)
Excavating and Constructing Foundations
� Competent rock
� Challenging site conditions
� 100’ deep cuts at skewbacks
![Page 29: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/29.jpg)
Rock Containment to Protect Dam and River
![Page 30: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/30.jpg)
Excavating and Constructing Foundations
� Completed NV Skewback excavation
![Page 31: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/31.jpg)
Excavating and Constructing Foundations
� Completed AZ skewback excavation
![Page 32: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/32.jpg)
Skewback Foundations
� 2000 C.Y. of concrete each
� Night placement
� Cooling tubes
� Discovery Channel “Million Dollar Pour”
![Page 33: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/33.jpg)
Local Precast Operation
� Precast Site 12 miles from bridge
� Over 400 column segments fabricated
![Page 34: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/34.jpg)
Precast Operation
� Match Casting
� 10 ft. segment height
� 50 Ton highline capacity
![Page 35: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/35.jpg)
Precast Operation
� Segment Checking
![Page 36: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/36.jpg)
Precast Operation
� Segment Delivery
![Page 37: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/37.jpg)
Approach Span Construction
Highline cableway system with 50-ton capacity
![Page 38: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/38.jpg)
Approach Column Construction
Temporary Bracing System
![Page 39: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/39.jpg)
New Highline Cableway System
New Highline: 2 – 300 ft. towers on each side w/3” cables
![Page 40: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/40.jpg)
Steel Tub Girder Superstructure
Efficient and light weight
![Page 41: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/41.jpg)
Main Span Arch Construction
![Page 42: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/42.jpg)
Main Span Arch Construction
![Page 43: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/43.jpg)
Local High-Performance Concrete Production
Pre-cooling with liquid nitrogen; night placement
![Page 44: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/44.jpg)
Main Span Cable-Stay Construction
� Temporary concrete towers
� First 6 arch segments cantilevered
� Alternate segments stayed
� 26 segments each side each rib
� 2 week cycle per segment
� 4 to 5 hours placement
![Page 45: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/45.jpg)
Main Span Cable-Stay Construction
![Page 46: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/46.jpg)
Main Span Cable-Stay Construction
![Page 47: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/47.jpg)
Main Span Cable-Stay Construction
![Page 48: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/48.jpg)
Main Span Cable-Stay Construction
![Page 49: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/49.jpg)
Main Span Arch Closure
![Page 50: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/50.jpg)
Main Span Arch Closure
![Page 51: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/51.jpg)
An Awesome Setting
![Page 52: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/52.jpg)
Constructing Spandrel Columns
![Page 53: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/53.jpg)
Completing Main Span
![Page 54: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/54.jpg)
Initial Inspection
![Page 55: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/55.jpg)
Completed on Revised Schedule, and on Budget
![Page 56: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/56.jpg)
Improved Visitor Experience at Dam
![Page 57: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/57.jpg)
Complimented an Existing American Landmark
![Page 58: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/58.jpg)
Captured Public Imagination
The project has captured the interest of the general public as well as the engineering and construction industries
![Page 59: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/59.jpg)
Final Results and Metrics
� Completed on original $240 million budget without dispute or claim
� Includes river bridge, eight other bridges, and 3.5 miles of approach roadway
� River bridge is first concrete-steel hybrid arch system in the U.S.
� River bridge is longest concrete arch span (1,060’) in Western Hemisphere, and 4th longest in world.
� Has world’s tallest (288’) precast concrete columns of their type.
![Page 60: ASHE National Conference June 13, 2014 Bismarck, …2014conference.ashe.pro/assets/presentations_hoover_dam...Hoover Dam Bypass Project The Mike O’Callaghan-Pat Tillman Memorial](https://reader033.vdocuments.site/reader033/viewer/2022051822/5fecb8181d62885b6e3d0e32/html5/thumbnails/60.jpg)
Questions?
Ed Power, P.E.