The “V”-IT Park by AscendasSite Visit
Made By-Naman Sukhija
Intern (27 May 2015– 10 July 2015)
Indian Green Building Council
![Page 2: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/2.jpg)
About Ascendas
It is a Singapore based firm which deals in-
Real Estate Development & Investment
Real Estate Services
Funds Management
![Page 3: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/3.jpg)
Phase II: AurigaTotal Area: 240,178 sft
Phase I: MarinerTotal Area: 234,323 sft
The V- Buildings Profile
Phase III: OrionTotal Area: 235,456 sft
Phase IV: CapellaTotal Area: 171,110 sft
Phase V: VegaTotal Area: 401,883 sft
![Page 4: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/4.jpg)
The V ParkThe V Park
Rain Water
Harvesting
Energy Efficient
Lights
Solar Ltg. System
Energy Efficient
Chillers VFD
Energy
Efficient
Motors
Energy Monitoring
system
Building
Management
System
![Page 5: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/5.jpg)
• Built on a 19 acre free-hold land, located at Software Units
Layout, HITEC City
• Total built-up area of 1.75 million Sft.
• Centrally Air-conditioned buildings
• 100% Power back-up
• Building Management Systems
• 24 x 7 operating hours
• Amenities available:
– Wellness Clinic
– ATM
– Bank
– Common Cafeteria & Food court
– Auditorium
– Training Rooms
– Gym with lounge
– Concierge Services
– Convenience store
The V
![Page 6: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/6.jpg)
Key Features-
![Page 7: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/7.jpg)
Hardscape is covered with existing tree canopy / open grid pavers.
Total 77% shaded area is there on site/
![Page 8: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/8.jpg)
Daylight using tinted
high performance glass
![Page 9: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/9.jpg)
Buildings are shaded
to reduce solar gain
inside building
Trees around building façade to
reduce solar gain inside building
from walls.
![Page 10: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/10.jpg)
Adequate, separated and shaded
parking space to reduce heat island
effect
Storm-Water drains for rain water
harvesting
![Page 11: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/11.jpg)
Rain Water harvesting pit filled with gravels so
that rainwater is easily percolated inside to
restore ground water level
![Page 12: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/12.jpg)
Shaded lights to reduce outdoor light
pollution
![Page 13: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/13.jpg)
High performance glass to
reduce solar heat gain
inside the building but still
providing adequate
daylight
![Page 14: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/14.jpg)
Maximum
daylighting
wherever possible
to reduce
dependency on
artificial light
source
![Page 15: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/15.jpg)
Designated smoking zone inside campus
No-Smoking sign boards inside the
campus except the area shown above.
![Page 16: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/16.jpg)
Indoor PlantDoor Mat and Air
Curtain
Features to maintain better indoor air quality
![Page 17: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/17.jpg)
CO2 sensors
![Page 18: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/18.jpg)
58%
42%
Type of Transportation System
Eco-Friendly Transportation Other Transportation
![Page 19: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/19.jpg)
High SRI (Solar Reflectance Index) Paint
to reflect solar heat transmitted inside
the building
![Page 20: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/20.jpg)
Air-cooled air conditioning system
with fogging technology
![Page 21: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/21.jpg)
Segregation of waste at site
![Page 22: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/22.jpg)
Building Management System for efficient energy utilisation
![Page 23: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/23.jpg)
Waste Water Treatment Plant
![Page 24: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/24.jpg)
Sewage water
Mariner
Sewage water
Orion
Sewage water
Capella
Air
Secondary
Clarifier TankCollection
Tank
Air
Sand
Filter
Activated
Carbon
Filter
Raw Sewage
Collection
Sump
Sludge holding
Tank
Filter feed
Pumps
UV Treatment
Pumps
Treated water
Tank
Treated water
Tank
Treated water
Tank
Process Flow Chart
of
Sewage Treatment Plant
Aeration Aeration
Tank Tank
Blowers
Cl2 Auto doser
Back Washing
Sewage
Collection Tank
Screen
Bar
RS Pumps
![Page 25: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/25.jpg)
Dual Plumbing system for water efficiency
Drip water irrigation to reduce water for irrigation
Eco-friendly refrigerants and fire-extinguishers
Around 450 energy meters are installed in whole campus
Energy efficient motors
Exhaust systems in Janitor rooms and housekeeping areas
Eco-friendly housekeeping chemicals
Many provisions for differently abled systems
Well-being facilities
Energy and water conservation teams and various green education programs
Maximum use of organic fertilizers
Automatic lighting system control
Water metering
![Page 26: Ascendas Site Visit](https://reader036.vdocuments.site/reader036/viewer/2022062306/5881a4d21a28ab1a398b6225/html5/thumbnails/26.jpg)