International Seismic Application TechnologyEngineered Seismic Bracing Systems

and Services

ASCE 7-10 SEISMIC DESIGN REQUIREMENTS FOR MEP NON-STRUCTURAL COMPONENTS

For :GAYNER ENGINEERS

Presented by Tim Lindfelt, Regional Engineering Manager

1

Page 2: Asce 7 10 presentation on seismic bracing for mep systems

Why Is Seismic Bracing Required for MEP Systems

Life Safety Functionality

2

Page 3: Asce 7 10 presentation on seismic bracing for mep systems

EXAMPLE:1994 NORTHRIDGE EARTHQUAKE

80-90% of the damage was to NON-structural elements

10 Essential Hospitals temporarily inoperable due primarily to water damage, broken glass, dangling light fixtures, and lack of emergency power due to failures in the distribution or control systems.

3

Page 4: Asce 7 10 presentation on seismic bracing for mep systems

PERFORMANCE OF PUBLIC WATER SUPPLY SYSTEMS IN HISTORIC

EARTHQUAKES

4

Page 5: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC BRACING IS A CODE REQUIREMENT

5

Page 6: Asce 7 10 presentation on seismic bracing for mep systems

6

AREAS REQUIRING SEISMIC BRACING

Page 7: Asce 7 10 presentation on seismic bracing for mep systems

Seismic Ground Acceleration Code Changes “G-Force”

7

Page 8: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DESIGN REQUIREMENTS FOR NONSTRUCTURAL COMPONENTS

CHAPTER 13

8

Page 9: Asce 7 10 presentation on seismic bracing for mep systems

BRACING/SUPPORTS FOR MEP SYSTEMS MUST BE ENGINEERED BY A PE AND

REVIEWED AND APPROVED BY THE AHJ

9

Page 10: Asce 7 10 presentation on seismic bracing for mep systems

IMPORTANT GENERAL TERMS

10

Page 11: Asce 7 10 presentation on seismic bracing for mep systems

Component Importance Factor (Ip)

11

Page 12: Asce 7 10 presentation on seismic bracing for mep systems

Ip =1.5 EXAMPLES

Examples of life-safety :• Fire protection system• Smoke exhaust system• Power to life-safety/hazardous

systems• Emergency Power• Flammable, toxic, hazardous

Examples of Risk Category IV Buildings :

• Acute Care Hospitals• Emergency Response

Centers/Shelters• Fire/Police Stations• Air Traffic Control Towers• Water Facilities Supplying OCC

CAT IV Buildings• Some Buildings

Storing/Processing Hazardous Materials

• Strategic National Defense

12

Page 13: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS

13.3.1 – SEISMIC DESIGN FORCE

UPPER LIMIT

LOWER LIMIT

With Modal AnalysisWithout Modal Analysis

13

Page 14: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS

FLOOR MOUNTED per TABLE 13.6-1High Deformability Component

ap = 1.0 and Rp = 2.5 (ap/Rp = 0.4)

14

Page 15: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS

FLOOR MOUNTED per TABLE 13.6-1

15

Spring Isolated Componentap = 2.5 and Rp = 2.0 (ap/Rp = 1.25)

Page 16: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS DISTRIBUTED per TABLE 13.6-1

Pipes welded or brazedap = 2.5 and Rp = 12.0 (ap/Rp = 0.2)

16

Page 17: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS

DISTRIBUTEDPipes threaded, coupled, etc

Ap = 2.5 and Rp = 6.0 (ap/Rp = 0.42)

17

Page 18: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS

DISTRIBUTEDLow Deformable Material (Glass or Cast Iron

ap = 2.5, Rp = 3.0 ap/Rp = 0.83)

18

GLASS PIPES CAST IRON PIPES

Page 19: Asce 7 10 presentation on seismic bracing for mep systems

WHAT REQUIRES BRACING? PER 13.1.4: SUSPENDED/WALL MOUNTED COMPONENTS OVER 20LBS OR 5PLF

FLOOR MOUNTED EQUIPMENT OVER 400LBS OR CENTER OF GRAVITY 4 FT OR HIGHER ABOVE FLOOR

19

Page 20: Asce 7 10 presentation on seismic bracing for mep systems

WHAT REQUIRES BRACING….

ELECTRICAL SYSTEMS (RACEWAYS): SEISMIC DESIGN CAT. C,D,E,F:

Ip=1.5– Conduit > 2.5” dia. (SDC C)Ip=1.0 and 1.5 – Conduit > 2.5” dia (SDC D, E, F)Ip=1.0 and 1.5 – Trapezed Conduit/CT ≥ 10plfConduits > 2.5” attached to panels, cabinets or other equipment shall be installed with flexible connections.

13.6.5.6:

20

Page 21: Asce 7 10 presentation on seismic bracing for mep systems

WHAT REQUIRES BRACING….

ELECTRICAL SYSTEMS cont.: Light Fixtures, Lighted Signs, Ceiling Fans

• Vertical supports shall be designed for 140% of operating weight with simultaneous horizontal force of 140% of operating weight.

• Lights within a ceiling grid < 56 lbs does not need additional bracing• Connection to structure shall allow a 360 degree range of motion if no

bracing is provided

13.6.1:

21

Page 22: Asce 7 10 presentation on seismic bracing for mep systems

WHAT REQUIRES BRACING….

HVAC SYSTEMS: SEISMIC DESIGN CATEGORY C,D,E,F:

Ip=1.0 or 1.5 – Duct ≥ 6 Sq. Ft. or weigh > 17 lb/ft**Provisions must be made to avoid impact with larger ducts

or mechanical components, or the ducts must be protected in the event of such impacts

Ip=1.0 or 1.5 –Ducts supported on trapeze ≥ 10 lb/ftIp=1.0 or 1.5 – Inline Equipment > 75lbs , unbraced pipes attached to inline equipment shall have flex connections

Note: All smoke control/hazardous /toxic ductwork requires bracing with no size exceptions.

13.6.7:

22

Page 23: Asce 7 10 presentation on seismic bracing for mep systems

WHAT REQUIRES BRACING….

PIPING SYSTEMS: SEISMIC DESIGN CAT. C:

Ip=1.0 – No bracing required for single hung pipeIp=1.5 – Piping > 2” dia.Ip= 1.0 and 1.5 – Trapezed Piping ≥ 10plf

SEISMIC DESIGN CAT. D,E,F:Ip=1.0 – Piping > 3” dia. (Cast Iron > 2” dia)Ip=1.5 – Piping > 1” dia.Ip=1.0 and 1.5 – Trapezed Piping ≥ 10plf

13.6.8:

23

Page 24: Asce 7 10 presentation on seismic bracing for mep systems

WHAT REQUIRES BRACING….

PIPING SYSTEMS cont.: Item 3: Piping has an Rp < 4.5 per Table 13.6-1, piping

systems and attachment shall be designed for the seismic forces and relative displacements of Section 13.3.

13.6.8.3:

24

Ap Rp

Page 25: Asce 7 10 presentation on seismic bracing for mep systems

GENERAL EXCEPTIONS TO THE RULES

12” RULE: Must be ALL hangers on a run Provisions are made for the piping to accommodate expected

deflections (flexes at components with relative displacements) Assure that components does not swing and damage another utility.

13.6.5.6, 13.6.7, 13.6.8:

25

Page 26: Asce 7 10 presentation on seismic bracing for mep systems

GENERAL EXCEPTIONS TO THE RULES

12” RULE cont.: ELECTRICAL CONDUITS AND MECHANICAL DUCTS:

• If rods are used as hangers, swivels shall be provided to prevent inelastic bending in rods.

• Rods and anchors will have to be designed for bending due to seismic forces in Section 13.3 if swivels are not installed

PIPING SYSTEMS:• If rods are used as hangers, swivels, eyenuts, or other

devices to prevent any bending in the rods.

13.6.5.6, 13.6.7, 13.6.8:

26

Page 27: Asce 7 10 presentation on seismic bracing for mep systems

DAMAGING IMPACT & CONSEQUENTIAL DAMAGE

13.2.3:

27

• Unbraced component shall not damage an essential component.

Hazardous exhaust flue

Unbraced pipe

Page 28: Asce 7 10 presentation on seismic bracing for mep systems

TYPICAL BRACING RULES - PIPING

Transverse Max Spacing : Steel/Cu = 40 ft ; Cast Iron = 20 ft Longitudinal Max Spacing : Steel/Cu = 80 ft ; Cast Iron = 40 ft Min Run Length = 10 ft A Brace Within 2ft of 90deg Turn Can Work for Both Sides

28

Page 29: Asce 7 10 presentation on seismic bracing for mep systems

ASCE REQUIRES : HOLISTIC SEISMIC DESIGN

29

Page 30: Asce 7 10 presentation on seismic bracing for mep systems

SUSPENDED PIPING BRACING METHODS - TRANSVERSE

30

Page 31: Asce 7 10 presentation on seismic bracing for mep systems

SUSPENDED PIPING BRACING METHODS - LONGITUDINAL

31

Page 32: Asce 7 10 presentation on seismic bracing for mep systems

SUSPENDED PIPING BRACING METHODS – CABLE TRANS & LONG

32

Page 33: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC BRACING- WHAT NOT TO DO!

33

Page 34: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC BRACING- WHAT NOT TO DO!

34

Page 35: Asce 7 10 presentation on seismic bracing for mep systems

ROOF TOP SUPPORTS Wind forces shall be designed per section

29.5 Wind provisions for components and

cladding is now in chapter 30 Wind provisions on equipment is part 6 Compare section 13.3 vs WIND SECTION

29.5

35

Page 36: Asce 7 10 presentation on seismic bracing for mep systems

ROOF TOP SUPPORTS Detailing for wind design shall

be per Ch 13 (13.1.6 c) Code compliance requires

“Positive Attachment” to structure.

Friction resistance cannot be used

36

Page 37: Asce 7 10 presentation on seismic bracing for mep systems

ROOF TOP EQUIPMENT ASCE 29.5 and 29.5.1

• Wind loads shall be increased by 1.9 if your roof top equipment or structure is on a roof that is no more than 60ft from grade.

• Studies from Texas Tech University showed that the wind gust factor is actually 1.63 compared to 0.85 that was in ASCE 7-02. The 1.9 factor was used to increase the pressure based on the testing (1.63/0.85 = 1.9).

37

Page 38: Asce 7 10 presentation on seismic bracing for mep systems

ROOF SCREENS DO NOT REDUCE WIND LOADS ON STRUCTURES

Definition of mechanical screens per 2010 CBC

38

FEMA 549 ATTACHMENT OF ROOFTOP EQUIPMENT IN HIGH WIND REGIONS

Page 39: Asce 7 10 presentation on seismic bracing for mep systems

INTERSTORY DRIFT

Caused by earthquake forces Deflection is typically 1% of

story height MEP systems physically attached

to two different floors Methods to mitigate effects:

- Use flex couplings/hose- Use slotted mounts - Spring isolators

39

Page 40: Asce 7 10 presentation on seismic bracing for mep systems

INTERSTORY DRIFT AFFECTS ON PIPING DROPS INTO EQUIPMENT

40

Page 41: Asce 7 10 presentation on seismic bracing for mep systems

VIDEO OF PIPE RUPTURE AT CONNECTION TO EQUIPMENT - SHAKE

TABLE TEST

Welded/Brazed Connections Outperformed Threaded

Watch here

41

Page 42: Asce 7 10 presentation on seismic bracing for mep systems

FORCES ON A PIPE DROPPING INTO A FLOOR MOUNTED EQUIPMENT

42

Page 43: Asce 7 10 presentation on seismic bracing for mep systems

FORCES ON A PIPE DROPPING INTO A FLOOR MOUNTED EQUIPMENT

43

DEFORMED FLEX

Page 44: Asce 7 10 presentation on seismic bracing for mep systems

FORCES ON A PIPE DROPPING INTO A FLOOR MOUNTED EQUIPMENT

44

DEFORMED FLEX

Page 45: Asce 7 10 presentation on seismic bracing for mep systems

TYPICAL FLEX CUTSHEETS

45

Page 46: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC RELATIVE DISPLACEMENT

Components will respond differently in an earthquake. Provide adequate flexibility.

46

Page 47: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC BUILDING JOINTS

47

Page 48: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC ON THERMALLY ACTIVE PIPING

Avoid over bracing hot water and steam piping

48

Page 49: Asce 7 10 presentation on seismic bracing for mep systems

THERMAL PIPING RISER DESIGN

Guide

AnchorSpring Mount

Guide

Guide

Spring Mount

Anchor

Spring Mount

49

Page 50: Asce 7 10 presentation on seismic bracing for mep systems

PIPING INSULATION VS LOAD PATHTRADITIONAL METHOD

50

Page 51: Asce 7 10 presentation on seismic bracing for mep systems

PIPING INSULATION VS LOAD PATHCODE COMPLIANT METHOD

51

Page 52: Asce 7 10 presentation on seismic bracing for mep systems

Pre-Insulated Pipe Support Integral Attachment Support

Example: 10” Pipe with 2” Insulation – Hot Water Service, 200°F

No Direct Path for Heat Loss Direct Path for Heat Loss thru TeeHeat Loss = 100 Btu/hr Heat Loss = 2500 Btu/hr

HEAT LOSS THRU PIPE SUPPORT –PRE-INSULATED VS INTEGRAL

52

Page 53: Asce 7 10 presentation on seismic bracing for mep systems

PRE-INSULATED ANCHOR ENGINEERED DATA SHEET

53

Page 54: Asce 7 10 presentation on seismic bracing for mep systems

BRACING/SUPPORTS FOR MEP SYSTEMS MUST BE ENGINEERED BY A PE AND

REVIEWED AND APPROVED BY THE AHJ

54

Page 55: Asce 7 10 presentation on seismic bracing for mep systems

Special Seismic Certification13.2.2: Manufacturer Submit Cert of Compliance for Approval to the

Registered Design Professional and Building Official Designated (Ip=1.5) Equipment Options : Testing / Analysis / Experiential Data Registered Design Professional must state requirements on

Construction Documents

55

Page 56: Asce 7 10 presentation on seismic bracing for mep systems

IBC REQUIRES SPECIAL INSPECTION For Ip=1.5 Systems

56

Page 57: Asce 7 10 presentation on seismic bracing for mep systems

IBC REQUIRES SPECIAL INSPECTION For Ip=1.5 (Designated Seismic Systems)

57

• Inspector needs to check• Label of equipment• Anchorage or mounted conforms to certificate of

compliance

Page 58: Asce 7 10 presentation on seismic bracing for mep systems

IBC 2012 REQUIRES SPECIAL INSPECTION MEP COMPONENTS

58

SEISMIC BRACING IS PART OF INSTALLATION THEREFORE NEEDS TO BE INSPECTED ALSO

Page 59: Asce 7 10 presentation on seismic bracing for mep systems

Mechanical Engineer of Record Duties Define Ip for Each Component Determine List of Special Seismic Certifications Review Subcontractor Submittals (Seismic Bracing and

Anchorage Submittals) Statement of Special Inspections

59

Page 60: Asce 7 10 presentation on seismic bracing for mep systems

Contractor Statement of Responsibility

60

Page 61: Asce 7 10 presentation on seismic bracing for mep systems

ISAT’S APPROACH TO COMPLY WITH CODE

61

Page 62: Asce 7 10 presentation on seismic bracing for mep systems

ISAT OPA-0485-07 Only large MEP Design-Vendor with 2007 Specific

OPA!!

62

Page 63: Asce 7 10 presentation on seismic bracing for mep systems

SEISMIC BRACING SUBMITTAL DRAWINGS

Each Seismic Location is Detailed on the Plans and Denoted with a Location Specific I.D. Number

A Seismic Bracing Legend is Added to Assist Installers, Inspectors, and

Reviewing Engineers in Understanding the Constraints of

the Design

ISAT’s Structural Engineers “Wet” Stamp Each Layout with Their Stamp from the Project State

63

Page 64: Asce 7 10 presentation on seismic bracing for mep systems

IN-HOUSE CUSTOM ENGINEERING

California Licensed PE’s, SE’s, ME’s Custom Details and Calculations ELECTRONIC “WET STAMPS”

64

Page 65: Asce 7 10 presentation on seismic bracing for mep systems

Seismic Bracing Inserted and Coordinated Within The Model

65

Page 66: Asce 7 10 presentation on seismic bracing for mep systems

Custom Bracing Installation Solutions

66

Page 67: Asce 7 10 presentation on seismic bracing for mep systems

Point Load Maps

67

Page 68: Asce 7 10 presentation on seismic bracing for mep systems

Deck Pour/Insert Coordination

GPS Total Station68

Page 69: Asce 7 10 presentation on seismic bracing for mep systems

Example: Cable Bracing Kit

Kits Labeled with:

-Contractor Name

-Project Name

-Drawing #

-Building Area/Floor

Cables are Pre-Tied to custom lengths, field adjustable, with correct brackets installed.

(No need to field cut and swage cables, no “hunting” for correct materials)

Correct concrete anchors, beam clamps, wood connections, etc. are included in each kit. (No quote surprises, No “hunting” for Anchors)

Appropriate quantity of Rod Stiffener components are included in each kit. (No surprises in the quote (stiffeners are usually an add with other systems), No “hunting” for materials)

Installation Details are in each kit

Kit Production and Material Shipment…

69

Page 70: Asce 7 10 presentation on seismic bracing for mep systems

ISAT’s “Blue Banger Hanger”Cast-In-Place Concrete Deck Inserts

IBC COMPLIANT

70

Page 71: Asce 7 10 presentation on seismic bracing for mep systems

Buy American Act

ISAT’s Seismic Bracing Kits and Blue Banger Hangers, labeled as such, are a “Domestic Construction Material” under FAR 52.225-9 and FAR 52.225-2

71

Page 72: Asce 7 10 presentation on seismic bracing for mep systems

PHD STRUT PRODUCTS

72

Page 73: Asce 7 10 presentation on seismic bracing for mep systems

PHD PIPE HANGER PRODUCTS

73

Page 74: Asce 7 10 presentation on seismic bracing for mep systems

Stiffy Supports – Light Duty Low Voltage Engineered Supports

Page 75: Asce 7 10 presentation on seismic bracing for mep systems

Typical Vibration Isolation

• Spring hangers for suspended equipment, piping,

and duct

• Un-housed spring mounts

• Seismically restrained spring mounts

• Neoprene mounts

• Neoprene hangers

• Equipment frames (e.g. cooling towers)

• Equipment inertia bases

• Riser supports (anchors, guides, and springs)

• Most material complies with Buy American Act

Page 76: Asce 7 10 presentation on seismic bracing for mep systems

Flexible Hose and Expansion Joints

Flexible Hose• Stainless, bronze, • CSA certified for natural gas• Variety of end fittings• Custom lengths

Rubber sphere expansion joints Expansion compensators Seismic expansion joints

• V-loops for easy nesting• U-loops• Drain ports• O2 cleaned, capped, and bagged for medical gas• CSA certified for natural gas

PTFE bellows and hose

Page 77: Asce 7 10 presentation on seismic bracing for mep systems

Los Angeles, CA (HQ)San Francisco, CASan Diego, CASacramento, CAPhoenix, AZLas Vegas, NVPortland, ORSeattle, WASalt Lake City, UTDenver, COCharlotte, NC Atlanta, GANew York, NYSan Juan, Puerto Rico

ISAT Office Locations

ISAT is opening additional offices in geographic regions where building code compliance for nonstructural seismic restraints is

becoming more stringent.

Page 78: Asce 7 10 presentation on seismic bracing for mep systems

ISAT’s Website…www.isatsb.comA wealth of information at your fingertips!

THE END78