Asbestos in Soil

Greg HoltStapleton Redevelopment Program

City and County of DenverOctober 3, 2008

Page 2: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Stapleton Redevelopment

• Stapleton Airport closed in 1995• Largest Brownfield Urban Project• 4000 Acres

2900 acres Developable1100 acres Open Space

• Redevelopment began in 1998• Three programs:

EnvironmentalDemolitionAirfield Pavement Removal

Page 3: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Development

• Land Transfer Environmental Standards– Stapleton Numeric Criteria-SNC

• City, EPA and State of Colorado

– Certification from Property Owner– NFA/NAD for Environmental Sites

• Approximately 120 NFA’s received

• Master Developer Chosen

Page 4: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Asbestos

Under Regulation 8

• 125 Building abated prior to demolition

• 50% of the Fuel Distribution System

• Utilities:

Water

Electric

Communication/ Telephone

Page 5: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Asbestos in Soil

• Lowery and Buckley

• Regulation Change - May 2006

• Land Transfer Requirements

• Industry Changes– Environmental Site Assessments– Sophistication of Asbestos Abatement

Contractors– Close out reports / NFA Requests

Page 6: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Highline Canal Phase 1 Filing 16

History

• City Purchased the land for airport expansion mid 1950’s

• Lateral of the Highline canal

• Canal backfilled with mixed waste

• Overall site was backfilled for runway expansion-mid 1960’s

Page 7: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16 Timeline

• Environmental Assessments- 6/04 and 1/05• Site Characterization- Summer 2005• Work Plan Approved by CDPHE - Fall 2005• Insurance Acceptance of Claim Fall 2005• Project Bid - November 2005• Contractor Selected - January 2006• NTP – March 2006• Abatement – April 2006- Current

Page 8: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16 2006

Page 9: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16 - 2008

Page 10: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16 Timeline

• Work Plan Approved by CDPHE - Fall 2005

• Joint meeting with CDPHE - March 2006

• Original Work Plan amended 3 times

• Development of site wide work plan

• Creation of Clearance Protocol -Fall 2006

• Suspension of Work Plan- October 2008

Page 11: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

• Original Scope of Work– Est. 120,000 yds

• 70,000 yds Non- Friable ACM• 50,000 yds Friable ACM• Area approximately 40 acres• Duration 180 days

• Actual – Est. 730,000 yds

• 480,000 yds Non- Friable ACM• 250,000 yds Friable ACM• Area increased to 105 acres• Duration 29 months

Page 12: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 13: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 14: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 15: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 16: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 17: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 18: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Page 19: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Suspension of Work• Why?

• City reached Sitewide Cap on costs

• Insurance reimbursement – Slow in payments– Payments in arrears.

Page 20: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Suspension of Work

Site Status• Canal Cleared

• 88% of the total site has been cleared

• 15% of the site has been backfilled

• Remaining area is under a stockpile.

Page 21: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Suspension of Work• Site Security

• Site Stabilization

• Protection of Human Health and Environment

• Air Monitoring

Page 22: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Filing 16

Insurance Reimbursement

• Original Scope of Work

$7,000,000.00

• Estimate to Completion

$50,000,000.00

Page 23: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Stapleton

Asbestos• One site complete - closure report and

NFA submitted

• Two sites complete –awaiting submittal

• Two sites in progress

• Five sites not started

Page 24: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Stapleton

Lessons learned• Site size-

• Unit pricing• Type of equipment to be used• Wetting methods

• Material –• Friable• Non-Friable• Mixture

• Mechanical means• Use of excavators, graders, other heavy equipment

• Soil preparation• Methods to achieve “adequately wet”

Page 25: Asbestos in Soil Greg Holt Stapleton Redevelopment Program City and County of Denver October 3, 2008

Stapleton

Questions