artist’s impression - wee · pdf fileartist’s impression • high connectivity:...

15
Artist’s Impression

Upload: ngokhue

Post on 07-Mar-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Artist’s Impression

Page 2: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Premier @ Kaki BukitA brilliant star at the heart of a bustling business hub in the East of Singapore.

Exclusively located along Kaki Bukit Ave 4 and the new Bartley Road East viaduct, this unique combination of 8 storey Ramp-up and 9 storey Flatted development is an integrated business space for expanding and aspiring entrepreneurs.

The General Industry (B2) classification appeals to wide range of users creating a strong business synergy within.

An excellent 60 year leasehold development for business owners and investors.

Artist’s Impression

Page 3: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

• High connectivity: close proximity to Bartley Road East viaduct leading to KPE and PIE.

• 400m walk to upcoming Downtown line, Kaki Bukit MRT station.

• Approximate 10-15 minutes drive to Airport and Central Business District.

• Sited within the densely populated Bedok, Ubi & Hougang housing estates, providing access to a large pool of workforce and many amenities.

Premium Location

Upcoming MRT Station

KB-1

KAKI BUKIT AVE 1

LEGEND:

WALKWAY TO MRT

BUS STOP

MRT STATION

DOWNTOWN LINE

KAKI BUKIT AVE 4

TO ECP/CITY

TO TAMPINES / T

PE

KPE

TO CITY

TO CHANGI AIRPORT

PIE

UBI AVE 1

UBI AVE 2

UBI AVE 3

UBI AVE 4

PAYA LEBAR RD

UBI RD 1

UBI RD 3

EUNOS LINK

KAKI BUKIT RD 1

KAKI

BUK

IT A

VE 2

KAKI BUKIT AVE 1

KAKI BUKIT AVE 3

BARTLEY RD EAST VIADUCT

KAKI BUKIT AVE 4

KAKI BUKIT RD 3 JALAN DAMAI

BEDOK RESERVOIR RD

PAYA LEBARMRT

EUNOS MRT

KEMBANGAN MRT

UPCOMINGKAKI BUKIT

MRT

MACPHERSON MRT

TAI SENG MRT

BARTLEY MRT

SINGPOST CENTRE

AUTOMOBILEMEGAMART

ENTERPRISE ONE

EUNOS TECHNOLINK

VICOM INSPECTIONCENTRE

K.B. WAREHOUSECOMPLEX

DEfU INDUSTRIAL PARK

Location Map

Premier @ Kaki Bukit

TO ECP/CITY

TO TAMPINES / T

PE

KPE

TO CITY

TO CHANGI AIRPORT

PIE

UBI AVE 1

UBI AVE 2

UBI AVE 3

UBI AVE 4

PAYA LEBAR RD

UBI RD 1

UBI RD 3

EUNOS LINK

KAKI BUKIT RD 1

KAKI

BUK

IT A

VE 2

KAKI BUKIT AVE 1

KAKI BUKIT AVE 3

BARTLEY RD EAST VIADUCT

KAKI BUKIT AVE 4

KAKI BUKIT RD 3 JALAN DAMAI

BEDOK RESERVOIR RD

PAYA LEBARMRT

EUNOS MRT

KEMBANGAN MRT

UPCOMINGMRT STATION

MACPHERSON MRT

TAI SENG MRT

BARTLEY MRT

SINGPOST CENTRE

AUTOMOBILEMEGAMART

ENTERPRISE ONE

EUNOS TECHNOLINK

VICOM INSPECTIONCENTRE

K.B. WAREHOUSECOMPLEX

KIM CHUAM WATERRECLAMATION PLANT

Page 4: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

• Dual ingress / egress for better traffic flow and accessibility.

• Spacious driveway for easy vehicular manoeuvre.

• Ample carpark lots on every level.

• Direct vehicular access for easier loading & unloading of goods.

• Ensuite washroom in every unit.

• 2 staff canteens for your convenience

• Sited on high ground for a spectacular view.

Premium Features

BLOCK 8

BLOCK 10

Site Plan

Page 5: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Exclusive Ground Level Units

Ramp-up 1st Storey Floor Plan

#01-01 #01-02 #01-03 #01-04 #01-05 #01-06 #01-07 #01-08 #01-09 #01-10 #01-11 #01-12 #01-13 #01-14 #01-15

#01-55 #01-54 #01-53 #01-52 #01-51 #01-50 #01-49 #01-48 #01-47 #01-46 #01-45 #01-44 #01-43 #01-42 #01-41 #01-40 #01-39

LOBBY

Page 6: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Direct container access for ramp up units to enhance business efficiency.

Ramp-up 2nd Storey Floor Plan

#02-01 #02-02 #02-03 #02-04 #02-05 #02-11 #02-12 #02-13 #02-14 #02-15 #02-16 #02-17 #02-18 #02-19 #02-21

#02-56

#02-07/10STAFF CANTEEN

#02-20 #02-22 #02-23 #02-25#02-24

#02-55 #02-54 #02-53 #02-52 #02-51 #02-50 #02-49 #02-48 #02-47 #02-46 #02-45 #02-44 #02-43 #02-42 #02-41 #02-40 #02-40#02-39 #02-40#02-38 #02-40#02-37 #02-40#02-36 #02-40#02-35 #02-40#02-34 #02-40#02-33 #02-32 #02-31 #02-30 #02-29 #02-28 #02-27 #02-26

LOBBY LOBBY

Page 7: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

A perfect combination of ramp-up and flatted units to accentuate your corporate image and maximise operational productivity.

Ramp-up3rd Storey Floor Plan

#03-01 #03-02 #03-03 #03-04 #03-05 #03-06 #03-07 #03-08 #03-09 #03-10 #03-11 #03-12 #03-13 #03-14 #03-15 #03-17 #03-18 #03-19 #03-20 #03-21 #03-22 #03-23 #03-24 #03-25

#03-55 #03-54 #03-53 #03-52 #03-51 #03-50 #03-49 #03-48 #03-47 #03-46 #03-45 #03-44 #03-43 #03-42 #03-41 #03-40 #03-39 #03-38 #03-37 #03-36 #03-35 #03-34 #03-33 #03-32 #03-31 #03-30 #03-29 #03-28 #03-27 #03-26

LOBBY LOBBY

Page 8: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Artist’s Impression

Page 9: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

High ceiling & column free layout for better space utilization.

Ramp-up 4th - 6th Storey Floor Plan

*units without mezzanine

#06-01#05-01#04-01

#06-55#05-55#04-55

#06-54#05-54#04-54

#06-53#05-53#04-53

#06-52#05-52#04-52

#06-51#05-51#04-51

#06-50#05-50#04-50

#06-49#05-49#04-49

#06-48#05-48#04-48

#06-47#05-47#04-47

#06-46#05-46#04-46

#06-45#05-45#04-45

#06-44#05-44#04-44

#06-40#05-40#04-40

#06-39#05-39#04-39

#06-38#05-38#04-38

#06-37#05-37#04-37

#06-36#05-36#04-36

#06-35#05-35#04-35

#06-34#05-34#04-34

#06-33#05-33#04-33

#06-32#05-32#04-32

#06-31#05-31#04-31

#06-30#05-30#04-30

#06-29#05-29#04-29

#06-28#05-28#04-28

#06-27#05-27#04-27

#06-26#05-26#04-26#06-43

#05-43#04-43

#06-42#05-42#04-42

#06-41#05-41#04-41

#06-02#05-02#04-02

#06-03#05-03#04-03

#06-04#05-04#04-04

#06-05#05-05#04-05

#06-06#05-06#04-06

#06-07#05-07#04-07

#06-08#05-08#04-08

#06-09#05-09#04-09

#06-10#05-10#04-10

#06-14#05-14#04-14

#06-15#05-15#04-15

#06-16#05-16#04-16

#06-17#05-17#04-17

#06-18#05-18#04-18

#06-19#05-19#04-19

#06-20#05-20#04-20

#06-21#05-21#04-21

#06-22#05-22#04-22

#06-23#05-23#04-23

#06-24#05-24#04-24

#06-25#05-25#04-25

LOBBY LOBBY

Page 10: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Ample carpark lots.

Ramp-up 7th Storey Floor Plan

#07-04 #07-05 #07-06 #07-07 #07-08 #07-09 #07-10 #07-14 #07-15 #07-16 #07-17 #07-18 #07-19 #07-20 #07-21 #07-22 #07-23 #07-24 #07-25

#07-32#07-33#07-34#07-35#07-36#07-37#07-38#07-39#07-40#07-44#07-45#07-46#07-47#07-48#07-49#07-50#07-41#07-42#07-43

#07-31 #07-30 #07-29 #07-28 #07-27 #07-26

LOBBY LOBBY

Page 11: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Openly Designed Driveway Offering Significant Advantages in Ventilation & Natural-lighting.

Ramp-up 8th Storey Floor Plan

#08-08

#08-46 #08-45 #08-44 #08-40 #08-39 #08-38 #08-37 #08-36 #08-35 #08-34 #08-33 #08-32 #08-31 #08-30 #08-29 #08-28 #08-27 #08-26#08-43 #08-42 #08-41

#08-09 #08-10 #08-14 #08-15 #08-16 #08-17 #08-18 #08-19 #08-20 #08-21

LOBBY

#08-22 #08-23 #08-24 #08-25

Page 12: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

A combination of modern and corporate tower accompanied with sophisticated lobby

Artist’s Impression

Artist’s Impression

Page 13: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Flatted 4th - 9th Storey Floor Plan

#04-60to

#09-60

#04-75to

#09-75

#04-74to

#09-74

#04-73to

#09-73

#04-72to

#09-72

#04-71to

#09-71

#04-70to

#09-70

#04-69to

#09-69

#04-61to

#09-61

#04-62to

#09-62

#04-63to

#09-63

#04-64to

#09-64

#04-65to

#09-65

#04-66to

#09-66

#04-67to

#09-67

#04-68to

#09-68

LOBBY LOBBY

Flatted 3rd Storey Floor Plan

#03-60/62STAFF CANTEEN

#03-63

#03-75 #03-74 #03-73 #03-72 #03-71 #03-70

#03-64 #03-65 #03-66 #03-67 #03-68

LOBBY LOBBY

Page 14: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

SPEciFicAtiONS

8 KAKi BUKit AVENUE 4 RAmP-UP FActORy

FOUNDATION Reinforced concrete piled foundation.

STRUCTUREReinforced concrete structure with post-tensioned beams and precast hollow core floor slabs or post-tensioned floor slabs for the factory and driveway/carpark.

ROOFFlat roof - Reinforced concrete structure with post-tensioned beams and precast hollow core slab or post-tensioned floor slabs and complete with waterproofing system.Pitched roof - Metal roof with insulation.

INTERNAL WALLReinforced concrete walls and/or lightweight block wall and/or clay brick wall.

EXTERNAL WALL AND FINISHESReinforced concrete wall and/or lightweight block wall and/or clay brick wall with cement and sand plastering/skim coat and painting.

FLOOR LOADINGFactory – 12.5 kN/m2

Lobby and staircase – 5 kN/m2

Ramp, driveway/carpark – 10 kN/m2

FLOOR TO FLOOR HEIGHT1st storey to 7th storey-- 6.0metres except for the following units:Unit #06-54 and #06-55 - 5.5 metresUnit #07-04 and #07-50 - 5.2 metres

8thstorey- Slope from 4.5 metres to 6.0metres except the following unit: unit #08-08 - Slope from 4.0 metres to 5.5 metres

WINDOWSAluminium framed windows with tinted glass.

DOORSTimber doors with quality locksets to main entrance of factory units.Electrically operated metal roller shutter to all factory units.PVC doors with locksets to toilets of factory units.

CEILINGSSkim coat and/or off-form concrete soffit and/or pre-cast hollow core slab with paint finish to all factory units, ramp, driveway/carparks.Suspended false ceiling to toilets of factory units, passenger lift lobby and public toilets.

INTERNAL WALL FINISHESCement and sand plaster and/or skim coat with paint finish to all factory units.Tiles and/or cement and sand plaster with paint finish to toilets.Tiles and/or cement and sand plaster and/or skim coat with paint finish to lift lobby.

FLOOR FINISHESPower float finish to factory units.Ceramic tiles to toilets of factory units.Homogeneous tiles to passenger lift lobby.Cement and sand screed to open yard.

ELECTRICALEmergency lighting including exit signs to all factory units provided in compliance with statutory requirements.80A 3-phase electrical supply to all factory units.Lighting provided to all common area such as staircases, driveway, ramps, lift lobby, corridor.

FIRE PROTECTIONFire protection system provided in compliance with the statutory requirements. .

AIR-CONDITIONING AND MECHNICAL VENTILATIONNatural/Mechanical ventilation in compliance with authority requirements on designated areas. Engineered smoke control system to driveway areas.

LIFTSFour (4) passenger lifts and two (2) service lifts.

SANITARY AND PLUMBING INSTALLATIONSanitary and plumbing systems provided in compliance with statutory requirements.

TELECOMMUNICATIONCommon cable trays for telecom cables are provided on each storey.

LIGHTNING PROTECTIONLightning protection system provided in compliance with statutory requirements.

10 KAKi BUKit AVENUE 4 FLAttED FActORy

FOUNDATION Reinforced concrete piled foundation.

STRUCTUREReinforced concrete structure with post-tensioned beams and slab.

ROOFFlat roof - Reinforced concrete structure with post-tensioned beams and slab and complete with waterproofing system.

INTERNAL WALLReinforced concrete walls and/or lightweight block wall and/or clay brick wall.

EXTERNAL WALL AND FINISHESReinforced concrete wall and/or lightweight block wall and/or clay brick wall with cement and sand plastering/skim coat and painting.

FLOOR LOADINGFactory – 7.5 kN/m2

Lobby and staircase – 5 kN/m2

Carpark – 2.5 kN/m2

FLOOR TO FLOOR HEIGHT3rd storey - 5.0 metresTypical storey – 4.5 metres

WINDOWSAluminium framed windows with tinted glass.

DOORSFire-rated door with quality locksets to main entrance of factory units.PVC doors with locksets to toilets of factory units.Tempered glass panels and doors to 3rd storey factory units, where applicable.

CEILINGSSkim coat with paint finish to all factory units.Suspended false ceiling to toilets of factory units, passenger lift lobby, corridor and public toilets.

INTERNAL WALL FINISHESCement and sand plaster and/or skim coat with paint finish to all factory units.Tiles and/or cement and sand plaster with paint finish to toilets.Tiles and/or cement and sand plaster and/or skim coat with paint finish to lift lobby.

FLOOR FINISHESPower float finish to factory units.Ceramic tiles to toilets of factory units.Homogeneous tiles to passenger lift lobby/corridor.

ELECTRICALEmergency lighting including exit signs to all factory units provided in compliance with statutory requirements.60amp 3-phase electrical supply to all factory units.Lighting provided to all common area such as staircases, driveway, ramps, lift lobby, corridor.

FIRE PROTECTIONFire protection system provided in compliance with the statutory requirements.

AIR-CONDITIONING AND MECHNICAL VENTILATIONNatural/Mechanical ventilation in compliance with authority requirements on designated areas.

LIFTSTwo (2) passenger lifts and two (2) goods lifts.

SANITARY AND PLUMBING INSTALLATIONSanitary and plumbing systems provided in compliance with statutory requirements.

TELECOMMUNICATIONCommon cable trays for telecom cables are provided on each storey.

LIGHTNING PROTECTIONLightning protection system provided in compliance with statutory requirements.

MASTER ANTENNA SYSTEM (MATV)MATV tap-off unit in risers on each storey is provided.

Page 15: Artist’s Impression - Wee · PDF fileArtist’s Impression • High connectivity: close proximity to ... clay brick wall with cement and sand plastering/skim coat and painting. FLOOR

Tel: 8363 2555Developer: Wee Hur (Kaki Bukit) Pte Ltd . Legal Description: Lot No. 06724T of Mukim 23 at Kaki Bukit Avenue 4. Tenure 60 year leasehold from 15 December 2010. BP No. A0743-10530-2010Expected date of Completion: The expected date of delivery of vacant possession of the Unit shall be no later than [31 December 2014] and the expected date of completion of the sale and purchase of the Unit shall be no later than [31 December 2017].

The information, plans, illustrations and photographs contained in this brochure are susceptible to change and amendments, subject to approval by relevant authorities, and they shall not form any part of an offer or contract. While every reasonable care has been taken in the preparation of this brochure, the Developer and their marketing Agent cannot held responsible for any inaccuracies. All statements are believed to be correct at the time of printing, and renderings and illustrations are artist’s impressions only and therefore cannot be regarded as representations of facts.