artar technology_infrastructure div
TRANSCRIPT
-
7/28/2019 ARTAR Technology_Infrastructure Div
1/8
ARTAR TechnologyAbdul Rahman Saad Al-Rashid & Sons Company Ltd.
-
7/28/2019 ARTAR Technology_Infrastructure Div
2/8
Chief Operation Off icer
IT &
Communication
Solution
Integrated
Technology
Systems
Site & Power
Solution
Low
Current
Systems
Security
System
-
7/28/2019 ARTAR Technology_Infrastructure Div
3/8
High Tech ConstructionInnovative Technology Baupanel - UK
EMECH International - Spain
Low Current Systems Data Center, Design & Build
Communication Solutions
Building Energy Management
System (BMS)
-
7/28/2019 ARTAR Technology_Infrastructure Div
4/8
Communication System Solutions: Cisco, Juniper, Avaya, Allied Telesis and Huawei.
Building Management Systems (BMS): TREND, Delta Controls
Data Centers, Design and Build: Canovate. Cannon Technology Co. Ltd.
Low Current Systems, Public Address System, Fire Alarm, AV
High Tech Construction Innovative Technologies: Baupanel, EMEC International
-
7/28/2019 ARTAR Technology_Infrastructure Div
5/8
PROJECT STATUS: INFRASTRUCTURE DIVISION ARTAR TECHNOLOGY
S/N CLIENT / PROJECT PACKAGES Date Initiated Due Date STATUS Value (SAR) REMARKS
1 RTCC-SAR, 5 STATION BMS Submitted 6,000,000.00 Revising the scope of work and making new
submittal
2 ETA Star - Hilton Hotel BMS & GRMS Submitted 13,200,000.00 Submittal being evaluated
3 CCE Electro-Mechanical works Submitted 102,000,000.00 negotiating
4 Mobily Modular Data Center Submitted 39,000,000.00 aiting for feedback from customer
5 Al Hokair, Marriot Hotel Low Current Systems 4 Jan, 2013 Pending 6,800,000.00 orking on engineering and pre-sales6 Uni Star, KAFP Low Current Systems Pending 16,000,000.00 orking on engineering and pre-sales
7King Abdullah City for Atomic &
Renuable Energy (K.A.CARE)Data Center (Design & Build) 26 Jan, 2013 Pending 5,000,000.00
Received Vendor (Canovate) quote and
preparing proposal.
8
KFMC Proton Center BMS, CCTV Network30 Dec, 2012 09 Jan, 2013 Pending 4,800,000.00
Presales work9 NIC Passport Printers 30 Dec, 2012 22 Jan, 2013 Pending 120,000,000.00
Received Vendor(GET Group) quote and
ready for submittal
TOTAL SAR 312,800,000.00
AMOUNT ESTIMATED
1 RTCC - KKUH LAN
LostOpportunities
15,500,000.00
2 Higher Education Fund / Baha &Tabuk hotels
Low Currents_BMS 17,000,000.00
3 RSAF-Desaster Recovery DR Center 01/Aug/1213/10/1433
29/9/2012No Bid
4Al-Jabreen / MODA project,
RiyadhLow Current 12,000,000.00
5 Al-Jabreen / MODA project, SouthLow Current 3,800,000.00
6Al-Jabreen / FA sysetm
requirementFA 51,511.00
7 Al-Jabreen / MODA BMS
8 KFSH / Supply of Tel Sets Digital telephone sets 08/Aug/12 11/Aug/12 56,610.009 Al-Jabreen/MODA 02/Sep/12 ASAP 1,200,000.0010 Al-Jabreen/MODA Sharoura Low Current Systems 03/Sep/12 ASAP
-
7/28/2019 ARTAR Technology_Infrastructure Div
6/8
BUDGET FOR 2013
KSA 19 Million
INCOME FOR 2013
S.No. Projects Total Amount Expected in Q 1 Expected in Q 2 Expected in Q 3 Expected in Q 4
FOR KINGDOM OF SAUDI OPERATIONS
1RTCC
Saudi Railway Company6,000,000
BMS for 5 SAR stations. Technical submittal is already made based on TREND, we are making a presentation to the owner (SAR), we have already had meetings
with the consultant and he is arranging presentation with client for final approval.
Had several meetings with Mr Waheed Malisho of RTCC, we are expecting P.O. as soon as approval is granted
Total value SAR 6 million, margin @ 10%
2 ETA Star 13,000,000
BMS & GRMS (Guest Room Management System) for Riyadh Hilton Hotel. Technical submittal is already made based on TREND & therm okon.
Our technical solution is the best of all submittals; Price is within the contractor's budget
A presentation was conducted for the consultant, and he likes the system and will approve upon submittal from Contractor
Total value SAR 13 million appx, margin @ 20-23% (depending on source of non-TREND material)
GRAND TOTAL Income For KSA Operation 19,000,000
EXPENSE FOR 2013
S.No. Manpower AvailableExpense for Availble Manpower
(Year 2013 )Manpower Required
Expense for Required Manpower
(Year 2013)Resources Expense for Resource (Year 2013)
FOR KINGDOM OF SAUDIA OPERATIONS
1 Eng Bassam 217,800 2 X Pre-sales Eng 408,000 Vehicle Qty. 01 65,000
2 Eng Arman 96,000 1 X Technical Support 420,000 Laptop Qty. 02 8,000
3 Maged Whdan 81,000 2 X Technician 216,000
4 Mohammed Farid 72,900
5 Ibrahim Ghazi 56,700
SubTotal 524,400 SubTotal 1,044,000 SubTotal 73,000
GRAND TOTAL For Expenses SAR 1,641,400
Total Income ( Total Income Target Minus Total Expense) 19,000,000.00 Million Approx.
Minimum profit margin @ 17%
Expected Profit for Year 2013 is SAR 3.2 Million Approx.
-
7/28/2019 ARTAR Technology_Infrastructure Div
7/8
Registration & Introduction
o Presentation was made to O&M for BMS System
o Presentation on Data Center design & Build was made for Mobily & K.A.CARE
o
UniStar/ETA Saudi Arabiao Fawaz Al Hokair
NDAs and Agreements were Signed with the following vendors:
o Cannon Technology UK(Data Center components manufacturer)o ElebobisaSpain(Electromechanical contractors, have LV factory)o Allied Telesis Japan (Communication equipments Manufacturer)o TWG UK (manufacturer and inventors of Baupanel building construction system)
Prequalificationo Efforts are being made for Product Prequalification of Baupanel system at the Ministry of
Housing
o TREND BMS is Approved at O&A consultant Co.
-
7/28/2019 ARTAR Technology_Infrastructure Div
8/8
Operating Expense
Q1-2013 Q2-2013 Q3-2013 Q4-2013 Total 2013
Demo Kits 25,000 5,000 5,000 5,000 40,000
Training 5,000 3,000 3,000 3,000 14,000
Tenders Fees 10,000 5,000 5,000 5,000 25,000
Travel & Ent 6,000 - 6,000 6,000 18,000
Misc 2,170 3,160 3,580 3,700 12,610
Total 219,170 319,160 361,580 373,700 109,610