    ARTAR TechnologyAbdul Rahman Saad Al-Rashid & Sons Company Ltd.

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    2/8

    Chief Operation Off icer

    IT &

    Communication

    Solution

    Integrated

    Technology

    Systems

    Site & Power

    Solution

    Low

    Current

    Systems

    Security

    System

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    3/8

    High Tech ConstructionInnovative Technology Baupanel - UK

    EMECH International - Spain

    Low Current Systems Data Center, Design & Build

    Communication Solutions

    Building Energy Management

    System (BMS)

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    4/8

    Communication System Solutions: Cisco, Juniper, Avaya, Allied Telesis and Huawei.

    Building Management Systems (BMS): TREND, Delta Controls

    Data Centers, Design and Build: Canovate. Cannon Technology Co. Ltd.

    Low Current Systems, Public Address System, Fire Alarm, AV

    High Tech Construction Innovative Technologies: Baupanel, EMEC International

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    5/8

    PROJECT STATUS: INFRASTRUCTURE DIVISION ARTAR TECHNOLOGY

    S/N CLIENT / PROJECT PACKAGES Date Initiated Due Date STATUS Value (SAR) REMARKS

    1 RTCC-SAR, 5 STATION BMS Submitted 6,000,000.00 Revising the scope of work and making new

    submittal

    2 ETA Star - Hilton Hotel BMS & GRMS Submitted 13,200,000.00 Submittal being evaluated

    3 CCE Electro-Mechanical works Submitted 102,000,000.00 negotiating

    4 Mobily Modular Data Center Submitted 39,000,000.00 aiting for feedback from customer

    5 Al Hokair, Marriot Hotel Low Current Systems 4 Jan, 2013 Pending 6,800,000.00 orking on engineering and pre-sales6 Uni Star, KAFP Low Current Systems Pending 16,000,000.00 orking on engineering and pre-sales

    7King Abdullah City for Atomic &

    Renuable Energy (K.A.CARE)Data Center (Design & Build) 26 Jan, 2013 Pending 5,000,000.00

    Received Vendor (Canovate) quote and

    preparing proposal.

    8

    KFMC Proton Center BMS, CCTV Network30 Dec, 2012 09 Jan, 2013 Pending 4,800,000.00

    Presales work9 NIC Passport Printers 30 Dec, 2012 22 Jan, 2013 Pending 120,000,000.00

    Received Vendor(GET Group) quote and

    ready for submittal

    TOTAL SAR 312,800,000.00

    AMOUNT ESTIMATED

    1 RTCC - KKUH LAN

    LostOpportunities

    15,500,000.00

    2 Higher Education Fund / Baha &Tabuk hotels

    Low Currents_BMS 17,000,000.00

    3 RSAF-Desaster Recovery DR Center 01/Aug/1213/10/1433

    29/9/2012No Bid

    4Al-Jabreen / MODA project,

    RiyadhLow Current 12,000,000.00

    5 Al-Jabreen / MODA project, SouthLow Current 3,800,000.00

    6Al-Jabreen / FA sysetm

    requirementFA 51,511.00

    7 Al-Jabreen / MODA BMS

    8 KFSH / Supply of Tel Sets Digital telephone sets 08/Aug/12 11/Aug/12 56,610.009 Al-Jabreen/MODA 02/Sep/12 ASAP 1,200,000.0010 Al-Jabreen/MODA Sharoura Low Current Systems 03/Sep/12 ASAP

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    6/8

    BUDGET FOR 2013

    KSA 19 Million

    INCOME FOR 2013

    S.No. Projects Total Amount Expected in Q 1 Expected in Q 2 Expected in Q 3 Expected in Q 4

    FOR KINGDOM OF SAUDI OPERATIONS

    1RTCC

    Saudi Railway Company6,000,000

    BMS for 5 SAR stations. Technical submittal is already made based on TREND, we are making a presentation to the owner (SAR), we have already had meetings

    with the consultant and he is arranging presentation with client for final approval.

    Had several meetings with Mr Waheed Malisho of RTCC, we are expecting P.O. as soon as approval is granted

    Total value SAR 6 million, margin @ 10%

    2 ETA Star 13,000,000

    BMS & GRMS (Guest Room Management System) for Riyadh Hilton Hotel. Technical submittal is already made based on TREND & therm okon.

    Our technical solution is the best of all submittals; Price is within the contractor's budget

    A presentation was conducted for the consultant, and he likes the system and will approve upon submittal from Contractor

    Total value SAR 13 million appx, margin @ 20-23% (depending on source of non-TREND material)

    GRAND TOTAL Income For KSA Operation 19,000,000

    EXPENSE FOR 2013

    S.No. Manpower AvailableExpense for Availble Manpower

    (Year 2013 )Manpower Required

    Expense for Required Manpower

    (Year 2013)Resources Expense for Resource (Year 2013)

    FOR KINGDOM OF SAUDIA OPERATIONS

    1 Eng Bassam 217,800 2 X Pre-sales Eng 408,000 Vehicle Qty. 01 65,000

    2 Eng Arman 96,000 1 X Technical Support 420,000 Laptop Qty. 02 8,000

    3 Maged Whdan 81,000 2 X Technician 216,000

    4 Mohammed Farid 72,900

    5 Ibrahim Ghazi 56,700

    SubTotal 524,400 SubTotal 1,044,000 SubTotal 73,000

    GRAND TOTAL For Expenses SAR 1,641,400

    Total Income ( Total Income Target Minus Total Expense) 19,000,000.00 Million Approx.

    Minimum profit margin @ 17%

    Expected Profit for Year 2013 is SAR 3.2 Million Approx.

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    7/8

    Registration & Introduction

    o Presentation was made to O&M for BMS System

    o Presentation on Data Center design & Build was made for Mobily & K.A.CARE

    o

    UniStar/ETA Saudi Arabiao Fawaz Al Hokair

    NDAs and Agreements were Signed with the following vendors:

    o Cannon Technology UK(Data Center components manufacturer)o ElebobisaSpain(Electromechanical contractors, have LV factory)o Allied Telesis Japan (Communication equipments Manufacturer)o TWG UK (manufacturer and inventors of Baupanel building construction system)

    Prequalificationo Efforts are being made for Product Prequalification of Baupanel system at the Ministry of

    Housing

    o TREND BMS is Approved at O&A consultant Co.

  • 7/28/2019 ARTAR Technology_Infrastructure Div

    8/8

    Operating Expense

    Q1-2013 Q2-2013 Q3-2013 Q4-2013 Total 2013

    Demo Kits 25,000 5,000 5,000 5,000 40,000

    Training 5,000 3,000 3,000 3,000 14,000

    Tenders Fees 10,000 5,000 5,000 5,000 25,000

    Travel & Ent 6,000 - 6,000 6,000 18,000

    Misc 2,170 3,160 3,580 3,700 12,610

    Total 219,170 319,160 361,580 373,700 109,610