arin update leslie nobile director, registration services

14
ARIN Update Leslie Nobile Director, Registration Services

Upload: jack

Post on 08-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

ARIN Update Leslie Nobile Director, Registration Services. 2012 Focus. IPv4 Depletion & IPv6 Uptake Developing, adapting, and enhancing processes and procedures IPv4 Countdown Plan (depletion planning) Continuing IPv6 outreach IPv4 Transfers - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ARIN  Update Leslie Nobile Director, Registration Services

ARIN UpdateLeslie Nobile

Director, Registration Services

Page 2: ARIN  Update Leslie Nobile Director, Registration Services

2012 Focus• IPv4 Depletion & IPv6 Uptake • Developing, adapting, and enhancing processes

and procedures– IPv4 Countdown Plan (depletion planning)

• Continuing IPv6 outreach• IPv4 Transfers

• Continued development and integration of web-based system (ARIN Online)

• RPKI deployment• Continued participation in Internet

Governance forums

Page 3: ARIN  Update Leslie Nobile Director, Registration Services

3

Current IPv4 Inventory

• 4.64 /8 equivalents in the pool of “available addresses”

• 4.43 /16 equivalents in the “RRH” bucket

(RRH = returned, revoked, held)• 1 /10 reserved – For NRPM 4.10 “Dedicated IPv4 block to

facilitate IPv6 Deployment”

4.64

Page 4: ARIN  Update Leslie Nobile Director, Registration Services

2011 & Q1 2012 IPv4 Allocations and Assignments Issued By ARIN(listed in /24s)

**Feb 3 2011: IANA depletion and new 3-month allocation policy for ISPs implemented

0

5,000

10,000

15,000

20,000

25,000

Dele

gatio

ns

0

5,000

10,000

15,000

20,000

25,000

Dele

gatio

ns

Page 5: ARIN  Update Leslie Nobile Director, Registration Services

**Feb 3, 2011- IANA depletion

2011 and Q1 IPv6 Address Allocations and Assignments

0

20

40

60

80

100

120

140

160

Com

plet

ed

IPv6

Del

egati

ons

0

20

40

60

80

100

120

140

160

Com

plet

ed

IPv6

Del

egati

ons

Page 6: ARIN  Update Leslie Nobile Director, Registration Services

6

ISP Members with IPv4 and IPv6

Total of 4,122 ISP Subscriber Members

*as of Mar 31, 2012

Page 7: ARIN  Update Leslie Nobile Director, Registration Services

7

Total Organizations Served by ARIN

*as of Mar 31, 2012

Page 8: ARIN  Update Leslie Nobile Director, Registration Services

IPv4 Transfer Stats2011 & 1st Qtr 2012

*8.3 transfers are to Specified Recipients*8.2 transfers are Mergers & Acquisitions

0

5

10

15

20

25

30

35

Com

plet

ed T

rans

fers

0

5

10

15

20

25

30

35

Com

plet

ed T

rans

fers

Page 9: ARIN  Update Leslie Nobile Director, Registration Services

Specified Transfer Listing Service (STLS)• Voluntary listing service established to

facilitate the transfer of IPv4 addresses under NRPM 8.3 “Transfers to Specified Recipients”– “Lister”- *validated entity that has IPv4 space

available for transfer– “Seeker”- *validated entity that has a

demonstrated need for IPv4 space and can pre-qualify under policy

– “Facilitator”- *validated entity that facilitates transfers between agreeing parties

*Org vetted, must agree to ToS

Page 10: ARIN  Update Leslie Nobile Director, Registration Services

Draft Policies Moving Forward• ARIN-2011-1: ARIN Inter-RIR Transfers

– Would allow transfers to/from the ARIN region– The two RIRs must have compatible transfer policy;

transfer based on need• AC recommended adoption

• ARIN-2012-1: Clarifying requirements for IPv4 transfers– Establishes criteria for 8.3 Specified Transfers and inter-

RIR transfers– Cannot have gotten space from ARIN in previous 12

months or get additional space for 12 months after transfer• Last Call

• ARIN-2012-3 ASN transfers– Adds ASNs to specified transfers

• Last Call

Page 11: ARIN  Update Leslie Nobile Director, Registration Services

Public Facing Development Efforts

• ARIN Online– Billing integration initiated

• Implemented Whowas Service– Subject to ToS

• RPKI– Running into HSM issues which are delaying

rollout• Hosted: To be completed in 2012 –

development is underway• Delegated: To be done after Hosted deployed

Page 12: ARIN  Update Leslie Nobile Director, Registration Services

2012 Outreach EventsEvents include: – ARIN on the Road

(New York, Chicago, and more)

– CES– Internet2 Joint Techs– V6 World Congress– North American IPv6

Summit– Interop– The Cable Show– CANTO

Page 13: ARIN  Update Leslie Nobile Director, Registration Services

13

Upcoming ARIN Meetings

Spring 2013 – in progress

Page 14: ARIN  Update Leslie Nobile Director, Registration Services