argyle, rugby, & beverley roads · december 2014 june 2014 • in december, dot presented a...

15
Argyle, Rugby, & Beverley Roads New York City Department of Transportation Presented March 2, 2016 to Brooklyn Community Board 14

Upload: others

Post on 15-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Argyle, Rugby, & Beverley Roads

New York City Department of Transportation Presented March 2, 2016 to Brooklyn Community Board 14

Page 2: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

2013 - Project Background

2013 - Initial Community Request

• Community members requested routes on:

• Stratford Rd • Westminster Rd

• Dorchester Rd

Proposed Routes Existing Greenway Existing Bike Lane Existing Shared Lane

Page 3: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

2014 - Project Background

Proposed Routes Existing Greenway Existing Bike Lane Existing Shared Lane

• In June, DOT presented a revised proposal as shown on the map based on an evaluation of the routes. The revised proposal included the community requested routes and additional routes:

• Argyle Rd • Caton Ave • Flatbush Ave • Cortelyou Rd • Stratford Rd • Westminster Rd • Dorchester Rd

December 2014

June 2014

• In December, DOT presented a revised route proposal based on feedback from the June 2014 meeting. Routes included:

• Rugby Rd • Albemarle Rd • Cortelyou Rd • Argyle Rd • Caton Ave • Flatbush Ave • Stratford Rd • Westminster Rd

Page 4: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

2015 - Project Background

Proposed Routes Existing Greenway Existing Bike Lane Existing Shared Lane

• In April, DOT revised the route proposal based on

feedback from the December 2014 meeting. Routes included:

• Beverley Rd • Argyle Rd • Rugby Rd • Caton Ave • Stratford Rd • Westminster Rd

April 2015

September 2015

• In September, DOT revised the route proposal based on feedback from the April 2015 meeting. Routes included:

• Beverley Rd • Argyle Rd • Rugby Rd • Caton Ave • Stratford Rd • Westminster Rd • Coney Island Av

Page 5: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

2016 - Project Background • DOT has revised the route proposal based on

feedback, field meeting, and a re-evaluation of the routes. Routes include:

• Beverley Rd

• Argyle Rd

• Rugby Rd

March 2016

Page 6: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Beverley Road

6

from Ocean Ave to Ocean Pkwy • 42’ wide • Residential • Two-way east/west

Beverley Rd at E 18 St, facing east

Page 7: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Existing

Proposed

Beverley Road

7

Page 8: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Example: Shared Lane

Avenue H 8

Page 9: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Argyle Road

from Ave H to Caton Av • 30’ wide • Residential • One-way northbound • 12-hour bike counts

• Weekend: 249 * • Weekday: 145 **

Argyle Rd at Dorchester Rd, looking south

* 5/3/2014 ** 5/6/2014 Both counts conducted from 7AM to 7 PM between Beverley and Albemarle Roads

9

Page 10: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Rugby Road

from Caton Av to Ave H • 30’ wide • Residential • One-way southbound • South of Ave H, two-way • 12-hour bike counts

• Weekend: 302 * • Weekday: 347 **

Rugby Rd at Foster Ave, looking north

* 7/26/2014 ** 7/23/2014 Both counts conducted from 7AM to 7 PM between Beverley and Albemarle Roads

10

Page 11: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Existing

Proposed

11

Argyle and Rugby Roads

Page 12: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Example: Standard Bike Lane

Willoughby Avenue 12

Page 13: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Bicycle Lanes:

• Argyle Road

• Rugby Road Shared Lanes:

• Beverley Road

Project Summary

13

Page 14: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

• Responds to a community-based request

• Expands bicycle network in the

community

• Increased roadway organization

• Clear positioning for cyclists

• Improved safety for all road users

• No parking or lane removal

Project Summary

14

Page 15: Argyle, Rugby, & Beverley Roads · December 2014 June 2014 • In December, DOT presented a revised route ... 2016 - Project Background • DOT has revised the route proposal based

Questions? Thank You