area navigation (rnav) and required navigation performance (rnp)fsims.faa.gov/wdocs/oswg/pbn today...
TRANSCRIPT
Federal AviationAdministration
Performance Based Navigation
Today & Tomorrow An FAA Perspective
Presented by: John Barry AIR-131 Aero Engineer/Tech Pilot Aircraft Certification
Presented to: OSWG Date: March 2016
Federal AviationAdministration
PBN Qualification & Ops Approval• What’s PBN & RNP?
• RNP AR(?)
• Ongoing RNP AR Approvals
• PBN Guidance Material
• Future Challenges for PBN
Federal AviationAdministration
PBN(?) Terminology• What’s PBN?
o Performance-Based Navigation → RNAV & RNP
• What’s RNAV? ─ Area Navigation• What’s RNP? ─ Required Navigation
Performance◦ Area Navigation (RNAV) + (monitoring & alerting)
◦ What about “RNAV (GPS)”?◦ RNAV (GPS) approach is an RNP approach → RNP APCH◦ No change in titling approach procedures◦ No requirement for a new airworthiness approval!
Federal AviationAdministration
RNP AR Operational Concept• Safety Assurance Philosophy
– No change in hazard ID & mitigation → TLS 1×10-7
– Took advantage of existing airworthiness approvals– Applies to new airworthiness projects – contact us!
• Remain “New” Airworthiness & Ops Concepts– No published FAA guidance prior to AC 90-101 (2005)– Still evolving → AC 90-101A & AC 20-138D
• RNP AR Approach Operational Success Requires Close Coordination Across Disciplines– Procedure Design– Aircraft Performance & Design– Operations
Federal AviationAdministration
RNAV & RNP Guidance Material• FAA AC 90-100A → Terminal & En Route RNAV Ops• FAA AC 90-105A* → RNP Ops & Baro-VNAV
◦ Departure, arrival & approach ops → advanced features• FAA AC 90-101A → Ops & Airworthiness Criteria◦ Alternate means of compliance for monitoring GPS◦ “RNP SAAAR” become “RNP AR” → international harmony
• FAA Order 8260.58 → PBN Procedure Design ◦ Updated RNP AR missed approach design criteria ◦ Harmonized with ICAO PANS-OPS PBN criteria
• ICAO Performance-Based Navigation (PBN) Manual◦ Doc 9613 → based on U.S./EASA criteria → expanding
Federal AviationAdministration
ICAO PBN Manual – Vol II, Part CImplementing RNP Operations
Chapter 6: Implementing RNP AR APCH– Unique due to reduced obstacle clearance & advanced
functional requirements– Obstacle clearance based on 2×RNP w/no secondary OCS – May apply RNP accuracy values between 0.3 & 0.1– Requires compliance with vertical error budget – Requires an alert when GNSS updating is lost– May use GNSS vertical guidance in lieu of baro-VNAV
For RNP AR APCH missed approach ops requiring less than 1.0 to avoid obstacles or terrain, the loss of the display of lateral guidance is a hazardous (severe-major) failure condition.
Federal AviationAdministration
Challenges for RNP AR Ops Approval• No aircraft type design in full compliance
– New aircraft type designs → certification plan???• No flight crew procedures from aircraft OEM
– Customers do not use OEM checklists? → OEM should still define specific RNP AR flight crew procedures by aircraft type & configuration
– If no OEM procedures, more FAA oversight required• Multiple variants of a single aircraft type design
– Variations in avionics require specific recognition ─ tail # by tail # ─ of aircraft qualification in ops application
– Application should breakout major systems impacting RNP AR aircraft performance
• Need RNP capability documentation
Federal AviationAdministration
RNP AR Ops Approvals• Recent Operational Approvals:
◦ United 787 BP3◦ Virgin America A320 new deliveries◦ Cathay Pacific 777◦ Qatar 777◦ NetJets Int’l – Aspen Special◦ jetBlue – Embraer temp comp◦ Numerous Gulfstream Operators – G450/550 (RNP 0.30)◦ Delta A319/320◦ American 787◦ Act Two Falcon 900 EX◦ Miami Air 737
• Numerous applications staged &/or pending
Federal AviationAdministration
Aircraft & RNP AR Ops Approval• Boeing aircraft performance details found in the
RNP Capabilities Documents – by aircraft type– Incomplete documentation led to 2008 memo of
understanding between Boeing, FAA & operators to specific RNP AR requirements • Example: B767 does not meet the RNP AR vertical error budget &
requires unique pilot vertical deviations limits– Boeing revising all RNP Capabilities Documents
• Began in Fall 2015 with 777 and 787• 747 and 737 in review• 757, 767 to complete this year
– Different capabilities with different customer options• Operator must provide listing of Optional Program Code selections
for each hardware and software configuration
Federal AviationAdministration
Aircraft & RNP AR Ops Approval
• Airbus aircraft performance details found in the Airbus Compliance Documents – Airbus aircraft configurations are not common, even within
a single type design (i.e. A300 configuration not common)– Each operator must provide a copy of the ACD applicable
to their particular aircraft