ARDEC 40MM GRENADE3D TDP CONVERSION
EFFORT
PRESENTED BY:
RAYMOND COIRO
TEAM LEADER
DRAFTING ECP/ERR TEAM
CONFIGURATION MANAGEMENT - TECH DATA
973-724-3629
Briefing For: 40MM Industry Day
29 Jan 2004
![Page 2: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/2.jpg)
2
GOALS
• To create and provide to the PM a 3D Technical Data Package (TDP) available for competitive bid.
• Provide 3D Models and Drawings for the 40MM Family of Grenades in accordance with ARDEC 3D TDP Standards.
• Bring 3D Modeling Technology In-House (ARDEC) instead of out-sourcing to other facilities and contractors.
![Page 3: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/3.jpg)
3
3D TDP Standards and Modeling
• All 3D Models and Drawings are being created using the policies set fourth by ARDEC for creating 3D TDP’s.
• All modeling is being done in-house and two full-time contractor employees are assigned to the job.
![Page 4: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/4.jpg)
4
Completed 3D TDP Deliverable for Contract
3D Technical Data Package
Consisting of:
Disc One
1. PDF Format of all 2D ProE Drawings. (Contractually Binding)
Disc Two (Bonus Disc)
1. ProEngineer 3D Models and Drawings.
2. STEP format of all 3D Models.
3. VRML files of all 3D Models.
![Page 5: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/5.jpg)
5
40MM Grenade Family
![Page 6: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/6.jpg)
6
40 MM 3D Conversion Status• M385A1 Practice
3D Models/Detail Drawings, completed as scheduled for Engineering Review: November 5, 2003
• M169 Cartridge Case 3D Models/Detail Drawings, completed as scheduled for Engineering
Review: November 5, 2003
• M918 Practice
3D Models/Detail Drawings, completed as scheduled for Engineering Review: December 3, 2003
• M781 Practice 3D TDP (Technical Data Package) completed and available for procurement
from Tech Data.
![Page 7: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/7.jpg)
7
• M583A1 White Star Para Scheduled completion date: Feb. 25th 2004
3D Models WIP (work in progress), 25% completed.
Drawings WIP, 3% completed.
• M16A2 40MM LINK Revised completion date: Feb. 11th 2004 3D Models WIP, 90% completed. Drawings WIP, 50% completed.
• M430A1 HEDP Revised completion date: Feb. 11th 2004
3D Models WIP, 75% completed.
Drawings WIP, 10% completed.
• M433 Scheduled completion date: Feb. 27th 2004 3D Models/Detail Drawings are being completed at Rock Island Arsenal. 3D Models WIP, 75% completed. Drawings WIP, 60% completed.
40 MM 3D Conversions Status cont.
![Page 8: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/8.jpg)
8
40MM, Practice, M385A1
• 3D Models/Drawings Completed as scheduled - 11/05/2003 for Engineering Review.
![Page 9: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/9.jpg)
9
40MM, Practice, M385A1
![Page 10: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/10.jpg)
10
40MM, M385A1, Practice
![Page 11: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/11.jpg)
11
M385A1 Exploded View
![Page 12: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/12.jpg)
12
40MM, M169 CARTRIDGE CASE
Used in M385A1
3D Models/Drawings Completed as scheduled - 11/05/2003 for
Engineering Review.
![Page 13: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/13.jpg)
13
M169 Cartridge Case
![Page 14: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/14.jpg)
14
Case, Cartridge 40MM M169for M385A1
![Page 15: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/15.jpg)
15
40MM, Practice, M918
• 3D Models/Drawings Completed as scheduled - 12/03/2003 for Engineering Review.
![Page 16: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/16.jpg)
16
40MM, Practice, M918
![Page 17: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/17.jpg)
17
40MM, Practice, M918
![Page 18: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/18.jpg)
18
M918 Cross Section
![Page 19: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/19.jpg)
19
M918 Exploded View
![Page 20: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/20.jpg)
20
40MM, Practice, M781
• 3D Models/Drawings have been released for Tech Data and are available for 3D TDP.
![Page 21: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/21.jpg)
21
40MM, Practice, M781
![Page 22: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/22.jpg)
22
40MM, M781, Practice
![Page 23: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/23.jpg)
23
M781 Exploded View
![Page 24: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/24.jpg)
24
40MM, M583A1 White Star Para
• Scheduled Completion Date 02/25/2004 for 3D Models/Drawings for Engineering Review.
![Page 25: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/25.jpg)
25
40MM, M583A1, White Star Para
![Page 26: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/26.jpg)
26
M583A1 Cross-Section
![Page 27: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/27.jpg)
27
M583A1 Exploded View
![Page 28: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/28.jpg)
28
40MM, M16A2 Grenade Link
• Scheduled Completion Date 02/11/2004 for 3D Models/Drawings for Engineering Review.
![Page 29: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/29.jpg)
29
40MM, M16A2 Grenade Link
![Page 30: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/30.jpg)
30
40MM, M16A2 Grenade Linked
![Page 31: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/31.jpg)
31
40MM, M16A2 Grenade Linked
![Page 32: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/32.jpg)
32
40MM, M430A1 HEDP
• Scheduled Completion Date 02/11/2004 for 3D Models/Drawings for Engineering Review.
![Page 33: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/33.jpg)
33
40MM, M430A1 HEDP
![Page 34: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/34.jpg)
34
40MM M430A1 Exploded view
![Page 35: ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil](https://reader036.vdocuments.site/reader036/viewer/2022081504/5519eb245503463a3c8b4582/html5/thumbnails/35.jpg)
35
CONCLUSION
• To make the PM and Customers happy by providing an up-to-date 3D TDP and passing on the 3D Technology to the PM and customer.