architecture | engineering | construction...
TRANSCRIPT
![Page 1: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/1.jpg)
GALWAY CENTRAL SCHOOL DISTRICT
ARCHITECTURE | ENGINEERING | CONSTRUCTION MANAGEMENT SERVICES
DECEMBER 2, 2015 | COMMUNITY FORUM 3
![Page 2: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/2.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
• Building Condition Survey
• District Five Year Plan
• District Administration
• District Staff
• Other Facility Users
• Community and Stakeholders
Facility Evaluation Resources
![Page 3: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/3.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
• SED Mandated Process
• Survey facility condition, assess remaining
life of building components
• Generate list of required improvements and
facility needs
• Provide budgets for components with 5
years or less life expectancy
Building Condition Survey
![Page 4: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/4.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
• Incorporate BCS findings
• Meet with stakeholders, administrative staff,
and facility committee to gather information
and establish work scope priorities
• Synthesize educational and facilities needs
into a plan for the next five years in SED
format
Five-Year Plan
![Page 5: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/5.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
• Work with BOE, Administration and
Construction Manager to establish the
scope of a Capital Project and
implementation approach
• Provide preliminary conceptual designs and
budgets for consideration
• Document conceptual designs for vote
• Establish project schedule
• Provide technical support and graphics
during public information phase
Pre-referendum Planning
![Page 6: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/6.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Construction History
![Page 7: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/7.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
2011 Capital Project Scope
![Page 8: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/8.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
General Categories of Need:
• Health, Safety and Accessibility
• Infrastructure
• District Improvements
• Energy Saving Measures / Alternative
Energy
Ideas and Concerns
![Page 9: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/9.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Galway Campus
![Page 10: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/10.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Traffic/Circulation Congestion
![Page 11: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/11.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
New Possibilities – Site Safety
(87 EXISTING PARKING SPACES) THIS OPTION PROVIDES 99 PARKING SPACES AND 53 ADDITIONAL SPACES
FOR EVENTS
![Page 12: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/12.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
New Possibilities – Site Safety
![Page 13: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/13.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Infrastructure / Safety • Roofing replacement - Partial
• Door and door hardware replacement
• Sidewalk and paving replacement
• Ceiling replacement
• Floor finish replacement – VAT, VCT, carpet, terrazzo
• Masonry restoration – MS gym wall
• Window replacement
• Toilet room renovations (ADA compliance and condition)
• Casework replacement
• Replace ES gym divider wall
• Replace pressure treated playground structure
![Page 14: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/14.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Infrastructure / Safety • Mechanical system upgrades:
– Boiler replacement
– Unit ventilator replacement
– Air handler replacement
– Provide ventilation to all interior occupied spaces and
corridors
– Steam and condensate piping replacement
– Provide digital equipment controls
• Electrical system upgrades:
– Panel replacement
– Lighting replacement
– Connect generator at bus garage
• Plumbing system upgrades:
– Domestic water piping replacement
– Storm and sanitary piping replacement
– Fixture and faucet replacement
– Well house replacement
– Isolation valve replacement
![Page 15: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/15.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Infrastructure / Safety
![Page 16: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/16.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
BCS - Roofing Replacement
1960
1990
1999
2011
1988
![Page 17: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/17.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
District Improvements • Auditorium air conditioning
• Auditorium seating, sound & lighting replacement
• Provide additional soccer field at Bus Garage site
• Provide ADA compliant ramp from ES to track
• Provide track and field lighting
• Provide exterior toilet facilities at the track
• Re-grade softball field outfield
• Replace Maintenance Garage with several smaller structures
• Replace metal panel wall system at ES gym, renovate equipment
• Replace chalk boards with white boards
• Renovate 1951 building vintage, primarily MS/HS Art wing
![Page 18: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/18.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Energy Saving Measures
COBLESKILL-RICHMONDVILLE
CENTRAL SCHOOL DISTRICT
• Replace 1987 hot water boilers with condensing boilers and
convert 2007 steam boilers to hot water
• Eliminate failed steam traps
• Replace air handling units at gyms and auditorium, include
demand control ventilation controls
• Convert water pumps to variable speed
• Replace classroom unit ventilators, include multi-speed fans
• Replace exterior lighting with LED
• Replace interior lighting with LED fixtures and occupancy sensors
• Increase roof insulation in areas of roof replacement.
• Provide Photovoltaic Array for electrical production
![Page 19: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/19.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Additional Suggestions
COBLESKILL-RICHMONDVILLE
CENTRAL SCHOOL DISTRICT
The following suggestions were made by community and staff
members:
• Provide water and electricity to the greenhouse
• Improve the 1974 vintage science labs
• Create a canopy over the loading dock
• Repair or replace scoreboards
• Provide irrigation for the athletic fields
• Re-surface the running track
• Extend the sidewalk from the ES to the track parking lot
• Replace the dust collection system at the woodshop
• Assess scoreboards for replacement
• Improve exterior drainage at lower hall entrance
• Upgrade science labs for programmatic deficiencies
![Page 20: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/20.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Pre-Referendum Phase Aug. ‘15- May 2016
• Refine Scope and Budget Sept. ‘15 – March 2016
• Community Forum #1 October 1, 2015
• Community Forum #2 November 3, 2015
• Community Forum #3 December 2, 2015
• BOE Resolution (Min. 45 days prior to vote) March 2016
• Referendum to voters May 2016
Post-Referendum Phase
• Design & Construction document production June ‘16- Jan. 2017
• SED Review (Based on a 52 week review) Feb. ’17- Feb. ‘18
• Bidding Process March- April 2018
• Award Contract May 2018
• Construction Period June 2018 – Aug. 2019
Potential Project Schedule
![Page 21: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/21.jpg)
INTRODUCTION
APPROACH
IDEAS AND
CONCERNS
POTENTIAL SCHEDULE
QUESTIONS
Join the discussion of the project at upcoming
Board of Education meetings in 2016 and look
for additional project information in district
newsletters, website updates, press releases
and other community outreach meetings as the
project scope is developed.
Public Information
![Page 22: ARCHITECTURE | ENGINEERING | CONSTRUCTION …galway.ss16.sharpschool.com/UserFiles/Servers/Server_91329/File...POTENTIAL SCHEDULE QUESTIONS • Incorporate BCS findings • Meet with](https://reader033.vdocuments.site/reader033/viewer/2022050716/5e16d78fd5d32e430d15194a/html5/thumbnails/22.jpg)
Questions or Comments?
THANK YOU!