architectural record january 2014 perspective stats · project: san marcos high school...

1
PROJECT: San Marcos High School Reconstruction ARCHITECT: LPA LOCATION: San Marcos, CA PROJECT: New Duxbury Middle/High School ARCHITECT: Mount Vernon Group Architects LOCATION: Duxbury, MA PROJECT: Essex North Shore Agricultural and Technical High School ARCHITECTS: Design Partnership of Cambridge; Wiles Architects LOCATION: Danvers, MA PROJECT: Ballou Senior High School ARCHITECT: Bowie Gridley Architects/ Perkins+Will Joint Venture LOCATION: Washington, D.C. PROJECT: Lake Central High School Addition/Renovation ARCHITECT: Schmidt Associates LOCATION: Saint John, IN $100 MILLION $100 MILLION ARCHITECTURAL RECORD JANUARY 2014 School starts, which had been hit hard by the fiscal condition of state and municipal governments, should rebound in the coming year as the country recovers from the recession and voters approve new bond measures to fund construction. K–12 Starts by Region In addition to U.S. total and 2013 forecast figures perspective stats 0 30 20 10 40 00 01 02 04 03 06 05 07 09 08 10 11 12 13 $BILLIONS NORTHEAST MIDWEST SOUTH WEST TOTAL U.S. FORECAST McGraw Hill Dodge Analytics tracks projects from predesign through construction to capture hard construction costs, square footage, and other key statistical information. 1 Ai3 Architects 2 PBK 3 Perkins+Will 4 SHW Group 5 Gignac Architects Top 5 Design Firms Ranked by K–12 construction starts 1/2011 through 10/2013 Top 5 Projects The Dodge Index for K–12 Construction 10/2012 –10/2013 The Dodge Momentum Index is a leading indicator of construction spending. The information is derived from first-issued planning reports in McGraw Hill Construction’s Dodge Reports database. The data lead the U.S. Commerce Department’s nonresidential spending by a full year. In the graph to the right, the index has been shifted forward 12 months to reflect its relationship with the Commerce data. MOMENTUM INDEX RESUMES UPWARD TREND After slipping in October, the Dodge Momentum Index continued its recent growth, rising 2.8% in November. Now at 117.9, the index is at its highest level since March 2009. 03 04 05 06 07 08 09 10 11 12 13 14 1 /2014 U.S. COMMERCE DEPARTMENT 0 100 200 300 400 DODGE MOMENTUM INDEX 0 50 100 150 200 INDEX (2000 = 100) MONTHLY DETAIL 11/2013 –– 11/2014 0 75 50 25 125 100 2012 2013 INDEX (2004 = 100) S O A J J M A M F J D N O Ranked by K–12 construction starts 1/2012 through 10/2013 MARKET FOCUS K–12 CONSTRUCTION Dunbar Senior High School, Washington, D.C., Perkins Eastman and Moody Nolan, page 124. $136 MILLION $105 MILLION $101 MILLION 1 NEW YORK CITY 2,632 WASHINGTON, D.C. 1,626 DALLAS 1,543 BOSTON 1,485 CHICAGO 1,013 Ranked by total K–12 starts 1/2012 through 9/2013 Top Metro-Area Markets REGION $MILLIONS 28 PHOTOGRAPHY: © JOSEPH ROMEO Data from McGraw Hill Dodge Analytics The index is based on data for K–12 construction starts that have not been seasonally adjusted. The average dollar value of projects in 2004 serves as the index baseline. 2 3 4 5 AR0114_DAA.indd 28 12/23/13 2:46 PM

Upload: buicong

Post on 12-May-2018

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: architectural record january 2014 perspective stats · PROJECT: San Marcos High School Reconstruction ARCHITECT: LPA LOCATION: San Marcos, CA PROJECT: New Duxbury Middle/High School

PROJECT: San Marcos High School ReconstructionARCHITECT: LPALOCATION: San Marcos, CA

PROJECT: New Duxbury Middle/High SchoolARCHITECT: Mount Vernon Group ArchitectsLOCATION: Duxbury, MA

PROJECT: Essex North Shore Agricultural and Technical High SchoolARCHITECTS: Design Partnership of Cambridge; Wiles ArchitectsLOCATION: Danvers, MA

PROJECT: Ballou Senior High SchoolARCHITECT: Bowie Gridley Architects/ Perkins+Will Joint VentureLOCATION: Washington, D.C.

PROJECT: Lake Central High School Addition/RenovationARCHITECT: Schmidt AssociatesLOCATION: Saint John, IN

$100 million

$100 million

architectural record january 2014

School starts, which had been hit hard by the fiscal condition of state and municipal governments, should rebound in the coming year as the country recovers from the recession and voters approve new bond measures to fund construction.

K–12 Starts by RegionIn addition to U.S. total and 2013 forecast figures

perspective stats

0

30

20

10

40

00 01 02 0403 0605 07 0908 10 1 1 12 13

$BILLIONS

NORTHEAST MIDWEST SOUTH WEST TOTAL U.S. FORECAST

McGraw Hill Dodge Analytics tracks projects from predesign through construction to capture hard construction costs, square footage, and other key statistical information.

1 Ai3 Architects

2 PBK

3 Perkins+Will

4 SHW Group

5 Gignac Architects

Top 5 Design FirmsRanked by K–12 construction starts 1/2011 through 10/2013

Top 5 Projects The Dodge index for K–12 Construction 10/2012 –10/2013

the dodge Momentum index is a leading indicator of construction spending. the information is derived from first-issued planning reports in McGraw hill construction’s dodge reports database. the data lead the u.S. commerce department’s nonresidential spending by a full year. in the graph to the right, the index has been shifted forward 12 months to reflect its relationship with the commerce data.

MOMENTUM INDEX RESUMES UPWARD TRENDAfter slipping in october, the Dodge momentum index continued its recent growth, rising 2.8% in november. now at 117.9, the index is at its highest level since march 2009.

03 04 05 06 07 08 09 10 1 1 12 13 14

1/ 2014

U.S. COMMERCE DEPARTMENT

0

100

200

300

400

DODGE MOMENTUM INDEX

0

50

100

150

200

INDEX (2000 = 100)

MONTHLY DETAIL11/2013 –– 11/2014

0

75

50

25

125

100

2012 2013

INDEX (2004 = 100)

S OAJJMAMFJDNO

Ranked by K–12 construction starts 1/2012 through 10/2013

mARKeT FoCuSK–12 CONSTRUCTION

Dunbar Senior High School, Washington, D.C., Perkins Eastman and Moody Nolan, page 124.

$136 million

$105 million

$101 million

1 New York CitY 2,632

washiNgtoN, D.C. 1,626

Dallas 1,543

BostoN 1,485

ChiCago 1,013

Ranked by total K–12 starts 1/2012 through 9/2013

Top metro-Area markets

regioN $MillioNs

28

PH

OT

OG

RA

PH

Y:

© j

Os

eP

H R

OM

eO

Data from McGraw Hill Dodge Analytics

the index is based on data for K–12 construction starts that have not been seasonally adjusted. the average dollar value of projects in 2004 serves as the index baseline.

2

3

4

5

AR0114_DAA.indd 28 12/23/13 2:46 PM