Architect Drawing of New Entrance
![Page 2: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/2.jpg)
LocationLocation of Phase II Construction Project – Old tennis courts west of the existing building.
![Page 3: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/3.jpg)
LocationView from the bus barn.
![Page 4: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/4.jpg)
LocationFenced in with temporary access road constructed on old track.
![Page 5: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/5.jpg)
BuildingFootings are poured for new addition.
![Page 6: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/6.jpg)
UtilitiesSanitary sewer line connected.
![Page 7: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/7.jpg)
UtilitiesElectrical lines connected.
![Page 8: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/8.jpg)
UtilitiesWater line installed.
![Page 9: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/9.jpg)
ParkingHouse being moved to provide more parking.
![Page 10: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/10.jpg)
ParkingAdditional parking will be located east of the maintenance building and existing tennis courts.
![Page 11: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/11.jpg)
BuildingConstruction begins on new band room walls.
![Page 12: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/12.jpg)
BuildingBand room walls and hallway to existing building.
![Page 13: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/13.jpg)
BuildingPre-cast walls for new gym arrive and are unloaded.
![Page 14: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/14.jpg)
BuildingPre-cast walls being installed.
![Page 15: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/15.jpg)
BuildingPre-cast walls being installed.
![Page 16: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/16.jpg)
BuildingPre-cast walls.
![Page 17: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/17.jpg)
BuildingPre-cast walls viewed from the north.
![Page 18: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/18.jpg)
BuildingColumns for front entrance being installed.
![Page 19: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/19.jpg)
BuildingRoof trusses being installed.
![Page 20: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/20.jpg)
BuildingRoof trusses being installed.
![Page 21: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/21.jpg)
BuildingRoof trusses being installed.
![Page 22: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/22.jpg)
BuildingRoof trusses installed.
![Page 23: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/23.jpg)
BuildingView from the west on July 15th.
![Page 24: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/24.jpg)
New Tennis Court LocationThree new tennis courts will be constructed west of the existing tennis courts.
![Page 25: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/25.jpg)
4 Stall Garage4 stall garage needs to be moved for construction of 3 new tennis courts west of existing courts.
![Page 26: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/26.jpg)
4 Stall GarageSite cleaned up and prepared for paving of new slab and return of 4 stall.
![Page 27: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/27.jpg)
4 Stall GarageSite prepared and ready for concrete.
![Page 28: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/28.jpg)
New HS RestroomsThe existing art room demo in preparation for new restrooms in the ninth grade hallway.
![Page 29: Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building](https://reader036.vdocuments.site/reader036/viewer/2022062421/56649e605503460f94b5b345/html5/thumbnails/29.jpg)
Hallway to New Addition and Storage RoomWall constructed in old chorus room to divide into hallway and storage space.