ArcelorMittal Hamilton East Inc.Hamilton Industrial Environmental Association CAP Presentation
June 9, 2015
ArcelorMittal in the world
• ArcelorMittal is the world's leading steel and mining company, with around 232,000 employees in more than 60 countries. ArcelorMittal is the leader in all major global steel markets, including automotive, construction, household appliances and packaging, with leading R&D and technology, as well as sizeable captive supplies of raw materials and outstanding distribution networks.
• An industrial presence in 20 countries exposes the company to all major markets, from emerging to mature.
• ArcelorMittal values geographical breadth, product diversity and raw materials security. Around 38% of our steel is produced in the Americas, 46% in Europe and 16% in other countries such as Kazakhstan, South Africa and Ukraine.
Underpinning all our operations is a philosophy to produce safe, sustainable steel
1
ArcelorMittal’s principles of integrity
2
Hon
our
your
wor
d
Lead
by
exam
ple
Expectations and understanding
Recognitionand sanctions
Measurementand reporting
Be
hone
st
Res
pect
pe
ople
Res
pect
as
sets
Be
tran
spar
ent
Res
pect
co
nfid
entia
lity
Com
mun
icat
e ab
out e
thic
s
Honesty and transparency Respect and dignity Exemplarity
Behaviours and practices
CULTURE OF INTEGRITY
Fostering a culture of integrity
The three pillars are embedded into our business and understood by all our employees.
Corporate responsibility strategy
• Our corporate responsibility strategy aims to support ArcelorMittal towards its operating philosophy of Safe, Sustainable Steel, by:
3
Investing in our people
Making each and every person working on our behalf
feel valued
Making steel more sustainable
Using our expertise in steel to develop cleaner processes and greener products
Enriching our communities
Ensuring our presence plays an important role in all the
communities where we operate
operated through transparent governance
A dedicated governance structure underpins the stra tegy to drive performance
Making steel more sustainable• Steel is at the heart of the modern world and offers extensive sustainability benefits to
society. That said, we recognise that steelmaking is resource intensive and are taking steps to improve this.
• 2014 Investments– $270m invested in research & development– $207m invested in environmental & energy capital expenditure
• Environmental management: – 98% of our steel production and finishing facilities are certified to ISO 14001– We recycled 31mt of steel in 2014, saving 40mt of CO2
4
Using our expertise in steel to develop more resour ce efficient processes & products
Making steel more sustainable• Tackling climate change
– We are committed to reducing our CO2 per tonne of steel produced by 8% by 2020– We work closely with our customers to support their environmental ambitions e.g. our
S-in motion® uses lightweight steels, to reduce a vehicle’s CO2 emissions by 14%
• Preventing pollution: since 2010 we have reduced dust emissions by 19% and our net water use to 4.2m3 per tonnes of steel.
5
Using our expertise in steel to develop more resour ce efficient processes & products
AM Long Carbon North America
Georgetown, SC
Indiana Harbor, IN
LaPlace, LA
Steelton, PA
Vinton, TX
Canada
Our mission is to manufacture safe, sustainable ste el.
7
ArcelorMittal Montreal Inc.
• Steel producer with locations in Quebec and Ontario.
• 1700 employees working in Contrecouer, Longueuil, Montreal, and Hamilton.
• Annual sales of over $1.4 billion and an annual production of over 2 million tons of steel.
Our mission is to safely manufacture durable steel while minimizing environmental impacts for future generations.
Vision 2019
8
ArcelorMittal Montreal vision:
We aspire to add value in the daily lives of our employees, customers and neighbors through sustainable steel
products and solutions
- Our employees first – since it will positively impact our clients- Our neighbors (communities), since our economic, social and environmental impact
must be taken into account in any plan for our survival and growth
Vision 2019: 0-150-1.5-200
9
0 150
1.5 200
Vision 2019Four major objectives
10
Zero illness
Rolling mills: 1.5 million tons per year
$150 EBITDA per ton
Wire mills: 200,000 tons per year
11
Environment• AMM continuously recycles steel in our
furnaces to make new steel.
• AMM is the largest recycler in Quebec.
• Close to 100% of the materials that enter our scrap recycling and processing centres is recycled or reclaimed.
• All of our Canadian facilities will be certified to ISO 14001 by the end of 2015. • Adhering to this voluntary
environmental management standard demonstrates our commitment to minimizing the impact steelmaking has on the environment.
Steel is the most widely recycled material in the w orld
12
Our accomplishments• AMM energy efficiency initiatives yielded considerable environmental and
financial benefits.• A new reheat furnace in Longueuil delivered a 30% reduction in CO2
emissions.• A new electric heating system aboard locomotives cut diesel
consumption.• The expansion of our Contrecouer warehouse reduced the need for
locomotives and yielded a 300 metric ton reduction in GHG emissions.
• AMM joined other partners in a project led by Ducks Unlimited to restore and improve Lavalliere Bay, on the south shore of St. Pierre Lake.• The lake is home to 58 bird species, 27 fish species and 10 reptile and
amphibian species and the bay has been identified as critical, due to its geographic location and its status as a vulnerable wetland.
• The project will restore a permanent wetland within the bay by implementing a system of dikes and a pumping station to control water levels.
13
ArcelorMittal Hamilton East
Who are we?
Location: ArcelorMittal Hamilton East690 Strathearne Ave. N. Hamilton, Ont.
Plant Size: 40 acres (approximately)
Business: Wire Mill
Employees: 200
Union: USW 5328
15
1956 Parkdale Works, Stelco Inc.
1993 Parkdale Works (along with a number of other works) incorporated as Stelwire Ltd.
2006 Stelwire Ltd. is acquired by Mittal Canada, Parkdale Works is renamed Hamilton East
2008 Mittal Canada officially changes it's name to ArcelorMittal Montréal
ArcelorMittal Hamilton East - History
16
ArcelorMittal Montreal – Hamilton East - Production F lowchart Wire Drawing FG
PC Strand FG
Oil Temper FG Straighten & Cut FG
Processed Rod FG
Single Die Wire Drawing
Oil Temper
Continuous Wire Drawing
Raw Material / Rod Storage
PC Strand / Stabilizing
Cleaning/ Pickling
Annealing
600,000 Square Feet
Processing Capacity of 370,000 MT
17
Hamilton East Production Capacity
Raw Material Storage
Raw Material Summary - Outside Locations 20,000 MT- Inside Locations 3,000 MT- Total Storage 23,000 MT
18
Cleaning Line Summary - Two lines utilizing hydrochloric acid baths- High-nickel zinc phosphate, borax, lime,
polymer and reactive lube coatings
Hamilton East Production Capacity
Cleaning
19
Hamilton East Production Capacity
Wire Drawing
Drawing Summary- 31 drawing machines (18 Single-hole, 13 Multi-hole)
- Finished size range 0.064’’ – 1.125’’ - Low & high carbon steel
Product Application- Fastening devices such as screws, nuts and bolts for
automotive and construction industries- Bent formed parts for the construction industry
20
Hamilton East Production Capacity
Annealing
Annealing Summary- 2 continuous pusher furnaces
- Subcritical and intercritical annealing of low carbon, high carbon and CHQ grades
Product Application- Nuts, bolts, screws, rivets and engine mounts for the
automotive industry.- Roofing and decking screws.
21
Hamilton East Production Capacity
Bundling
Bundling Summary- 6 workstations for strapping and compacting of
wire/rod coils
Product Application- Welding sticks for the welding industry
22
Hamilton East Production Capacity
Oil Temper
Oil Temper Summary- 3 Oil Temper lines (Basket take-ups, and sidewinder
blocks – 36’’, 48’’, 60’’ packages)- Finished size range from 0.080’’ – 0.562’’
Product Application- Springs for both the automotive and construction
industry.
23
Hamilton East Production Capacity
Straighten & Cut
Straighten & Cut Summary- Flying shear straighten and cut machine- Finished size range from 0.148’’ – 0.500’’
- Finished cut length from 29’’ – 25’ - Low and high carbon steel
Product Application- Tail gate lift assembly in the Ford F150- Other automotive applications
24
Hamilton East Production Capacity
PC Strand
Stranding Summary- 1 strander, 1 stabilizer and 1 re-reeling unit
- 7 wire cable for PC Strand- Finished cable sizes 0.375’’, 0.437’’, 0.500’’, 0.515’’,
0.600’’
Product Application- Concrete reinforcing in the construction industry.
- Bridges, Seating structures, Roadways
ENVIRONMENT –Continuous Improvement
• Water Treatment Plant• CAPEX project to take place in 2015 • System expected to be online by the end of 2015• The system will recycle 80% of process water used in the Facility• 80% reduction in waste water generation• 80% reduction in water consumption • Expected savings of $729K / year
• Global Adjustment Initiative• Partnered with ArcelorMittal Dofasco to reduce the peak electrical demand
during the critical consumption days in the both the summer and winter months.
• Energy Reduction - EMIS (Energy Management Information System)• Project commenced in late 2012• The software system itself is primarily intended for collecting and reporting
energy-related information, but also has analytical capabilities to support energy savings
• Meter installation is in progress with electrical meters online and natural gas / steam meters online by the end of 2015.
• 50% of the funding has been provided through government programs (utilities).
• ISO 14001 Certification by end of 2015.
ENVIRONMENT –Continuous Improvement
Corporate responsibility
Enriching our communities
28
Our presence plays an important role in all the com munities where we operate
Breast Cancer Awareness
29
Backpack Initiative
On August 28, 2014 employees of ArcelorMittal Hamilton East and other groups helped assemble 600 backpacks for inner-city kids in Hamilton.
Hamilton East #1 for Fundraisingraises $6368 for MACKIDS
Hamilton East gets colourful to raise funds for the Hamilton Conservation Authority
Team Hamilton East – At the finish
Steel – The Fabric of Life
The fabric of life
34
Fabric of life - Canada’s ArcelorMittal Dofasco is
supplying steel for the Toronto 2015 Pan Am / Parapan Am
Games’ most iconic symbol –the cauldron. The cauldron will be made from ten types of steel including hot roll, Galvalume®, cold-roll enamelling and tubular,
and will weigh around 14 tonnes.
Fabric of life - Thousands of ceramic poppies were planted around the Tower of London, in the UK in November 2014, to
commemorate the centenary of the First World War. For this special event, our Hamburg plant supplied to one of our customers, Barnfather Wire
(Midlands) Ltd wire steel that was used to create the stems of
the flowers.
Fabric of life - The 3.1-mile new Tappan Zee twin span cable-stayed bridge is the
single largest bridge construction project in New
York’s history, and the largest transportation design-build project to date in the United
States. Supported with 160,000 tonnes of
ArcelorMittal steel, it is designed to last 100 years.
35
Fabric of life
Fabric of life - our steel plays an important and irreplaceable role in the modern car, from small parts
like the front bumper to larger, more complex parts like the gear and transmission mechanisms. With
carmakers using our flat products, long products, electrical steels,
tailored blanks and more, it is easy to understand why the name
ArcelorMittal is becoming synonymous with automotive
Fabric of life – our French site, Bourg-en-Bresse, has recently signed a deal with
French leader in energy industry projects and
constructions, Technip, to help develop high-tech, high
resistance flexible pipes which are used on offshore oil rigs to develop deep oil
and gas fields.
Fabric of life - More than US$51bn was invested in
Winter Olympic facilities, roads, rail, and other infrastructure projects to prepare the Black
Sea town of Sochi, Russia, for the Games. One of the major
upgrade projects involved Sochi’s ports, a key part in
transforming the city into an Olympic wonderland, for which
ArcelorMittal supplied more than 9,000 tonnes of steel.
Thank - you