CHICAGO AVENUESHERIDAN ROAD IMPROVEMENTALTERNATIVES
![Page 2: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/2.jpg)
BACKGROUNDCRASH ANALYSIS (2007 – 2012)
Total of 28 (8%) crashes involving a pedestrianTotal of 22 (6%) crashes involving a bicyclist
Majority (59%) of crashes:Turning (21%), Rear End (24%), Sideswipe (14%)
141 Total Crashes
212 Total Crashes
Chicago Ave (Grove St to Sheridan Rd)
Sheridan Rd(Chicago Ave to Isabella St)
• 17% of pedestrian crashes resulted in incapacitating injuries• 14% of bicyclist crashes resulted in incapacitating injuries• 2% of motorist crashes resulted in incapacitating injuries
Intersections with most crashes: • Lincoln St • Foster St• Church St• Davis St
Segments with most crashes:• Foster St to Chicago Ave• Church St to Davis St
1 fatality in the time period, which involved a pedestrian and 7 of the 12 incapacitating injuries involved pedestrians or cyclists
![Page 3: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/3.jpg)
BACKGROUNDBICYCLE DATA (STRAVA)
DATA COLLECTED BY STRAVA GPS TRACKING PROGRAM.
ACCOUNTS FOR ~10% OF CYCLISTS IN THE AREA
SH
ER
IDA
N R
OA
D
June 1, 2013thru
May 31, 2014
![Page 4: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/4.jpg)
AVERAGE OF BIKE COUNTS(DAILY) PERFORMED
10/2013 & 5/2014
NO. OF CYCLISTS ON ROAD= 295 (31%)
NO. OF CYCLISTS ON SIDEWALK = 653 (69%)
TOTAL NUMBER OF CYCLISTS = 948
BACKGROUNDBICYCLE DATA
![Page 5: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/5.jpg)
DAILY PEDESTRIAN COUNT 5/2014
TOTAL NUMBER OF PEDESTRIANS= 9,164
BACKGROUNDPEDESTRIAN DATA
![Page 6: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/6.jpg)
BACKGROUNDVEHICLE COUNTS (ADT)
SH
ERID
AN
RD
CENTRAL ST
LINCOLN ST
NOYES ST
FOSTER ST
RID
GE A
VE
CH
ICAG
O A
VE
SHERIDAN RD
12,000
14,000
15,000
17,000
NORTHWESTERN PLACE
18,000
7,000
11,000
![Page 7: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/7.jpg)
BACKGROUNDFUNDING
• IDOT – $1.6 Million
• ITEP – $1.5 Million
• MFT – $950,000
• Northwestern University – TBD
![Page 8: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/8.jpg)
TABLE OF CONTENTS
1. Chicago Avenue Corridor (Davis St to Church St)
2. Chicago Avenue Corridor (Church St to Sheridan Rd)
3. Sheridan Road Corridor (Chicago Ave to Central St)
4. Sheridan Road Corridor (Central St to Isabella St)
5. Corridor Amenities
6. New Traffic Signal at Sheridan Rd and Campus Dr
![Page 9: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/9.jpg)
CHICAGO AVE – GROVE TO CHURCHEXISTING
*Grove St to Davis St will be resurfacing only
![Page 10: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/10.jpg)
CHICAGO AVE – DAVIS TO CHURCH4 CAR LANES
2-WAY BIKE LANE WEST SIDEON-STREET WITH BIKE SIGNALS
![Page 11: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/11.jpg)
CHICAGO AVE. – CHURCH TO SHERIDANEXISTING
![Page 12: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/12.jpg)
2 LANES2-WAY PROTECTED BIKE LANE WEST SIDE
PARKING EAST SIDE
CHICAGO AVE – CHURCH TO SHERIDAN2 CAR LANES
2-WAY PROTECTED BIKE LANE WEST SIDEON AND OFF STREET WITH BIKE SIGNALS
![Page 13: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/13.jpg)
BACKGROUNDEXISTING SIGNAL PHASING
Sheridan Phase Chicago Phase Pedestrian Phase
Sheridan/Chicago Intersection
![Page 14: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/14.jpg)
BACKGROUNDOPTIONAL SIGNAL PHASING
Sheridan Phasewith 2-way bikes
Chicago Phasewith 2-way bikes
Pedestrian Phasewith NB bikes
Sheridan/Chicago Intersection
![Page 15: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/15.jpg)
SHERIDAN RD - CHICAGO TO CENTRALEXISTING
![Page 16: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/16.jpg)
SHERIDAN RD - CHICAGO TO CENTRAL4 LANES
EAST BIKE LANE(PARKWAY PATH)
![Page 17: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/17.jpg)
SHERIDAN RD - CHICAGO TO CENTRAL4 LANES
WEST BIKE LANE(PARKWAY PATH)
![Page 18: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/18.jpg)
SHERIDAN RD - CHICAGO TO CENTRALCOMBINATION 3 & 4 LANESRAISED (BUFFERED) BIKE LANES
![Page 19: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/19.jpg)
SHERIDAN RD– CENTRAL TO INGLESIDEEXISTING
![Page 20: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/20.jpg)
SHERIDAN RD– CENTRAL TO INGLESIDE2 LANES
BIKE LANES
*MINOR WIDENING EAST, NO TREE IMPACTS
![Page 21: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/21.jpg)
SHERIDAN – INGLESIDE TO ISABELLAPROPOSED ROUTE
![Page 22: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/22.jpg)
LOADING AND TRANSIT CONSOLIDATION DESIGNSSHERIDAN ROAD CORRIDOR
2 STOPS IN EACH DIRECTION; LOCATIONS TBD
Widen 14.5’
Widen 13.5’
ONE WAY CYCLE TRACK
TWO WAY CYCLE TRACK
![Page 23: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/23.jpg)
MID-BLOCK CROSSING WITH PEDESTRIAN REFUGE ISLANDSHERIDAN ROAD CORRIDOR
2 - 3 LOCATIONS (TO BE DETERMINED)
![Page 24: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/24.jpg)
INTERSECTION CORNER BIOSWALE
![Page 25: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/25.jpg)
MID-BLOCK BIOSWALE
![Page 26: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/26.jpg)
SHERIDAN RD AND CAMPUS DRPROPOSED TRAFFIC SIGNAL
SH
ER
IDA
N R
OA
D
CH
ICAG
O A
VEN
UE
CA
MPU
S D
R
SH
ER
IDA
N R
D
![Page 27: Apw2 sheridan and chicago avenue presentation full 7.14.14](https://reader033.vdocuments.site/reader033/viewer/2022061305/54995f18b47959ff658b4569/html5/thumbnails/27.jpg)
SHERIDAN ROAD OPTIONCOMPARATIVE ANALYSIS