A Systems Engineering Examination of the Short Range Antitank Weapon (SRAW) By John D. Rinko Project Report submitted to the Faculty of the Virginia Polytechnic Institute and State University in partial fulfillment of the requirements for the degree of Master of Science in Systems Engineering APPROVED: Benjamin S. Blanchard, Chairman br. Ue Beaton J. Dennis Hagan 3 “7 April 22, 1996 Blacksburg, Virginia Key words: Systems Engineering, Anti-tank, Weapon, Human Factors, Optical Sight

Upload: others

Post on 26-May-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: April 22, 1996 - Virginia Tech

A Systems Engineering Examination of the

Short Range Antitank Weapon (SRAW)

By

John D. Rinko

Project Report submitted to the Faculty of the Virginia Polytechnic Institute and State University in partial fulfillment of the requirements for the degree of

Master of Science

in

Systems Engineering

APPROVED:

Benjamin S. Blanchard, Chairman

br. Ue Beaton J. Dennis Hagan 3 “7

April 22, 1996

Blacksburg, Virginia

Key words: Systems Engineering, Anti-tank, Weapon, Human Factors, Optical Sight

Page 2: April 22, 1996 - Virginia Tech

Ct

z; Te gee

4. ae ce

OP Os .

eS

ge?

Re Fie ¥ - "

Page 3: April 22, 1996 - Virginia Tech

A Systems Engineering Examination of the

Short Range Antitank Weapon (SRAW)

By

John D. Rinko

Committee Chairman: Professor Benjamin S. Blanchard

Systems Engineering

(ABSTRACT)

This paper examines the systems engineering process of the development of a new

lightweight weapon system, a Short Range Anti-tank Weapon (SRAW) for the United

States Marine Corps. The systems engineering approach has been applied to this system.

The need for such an anti-tank system is established from examining currently fielded ant-

tank systems. The maintenance concept, operational requirements, functional analysis,

and requirements allocation are presented with an emphasis on the human interface. The

SRAW optical sight requirements are presented to illustrate the flow-down of the systems

engineering process to the component subassembly level. The results of a field test

verification of the optical sight requirements are presented as one example of the iterative

system development process.

Page 4: April 22, 1996 - Virginia Tech

Acknowledgments

The author wishes to thank J. Dennis Hagan, Principal Weapons Systems

Engineer, Naval Surface Warfare Center, Dahlgren, Virginia for serving as local advisor

and for attending the defense of this paper. Appreciation is offered to Professor Benjamin

S. Blanchard, Chairman, Virginia Tech Systems Engineering Program, for serving as

advisory chairman to this project, and to Dr. Robert J. Beaton, CPE, Virginia Tech

Associate Professor and Director of Displays and Controls Lab, for acting as a committee

member.

The author would also like to thank the Naval Surface Warfare Center, Dahlgren,

Virginia for the funding and the opportunity to pursue graduate studies, the Virginia Tech

satellite program for providing a wide selection of available courses, and his wife, Terri

Rinko, for her constant support.

ill

Page 5: April 22, 1996 - Virginia Tech

Table of Contents

Page ADStraCt occ ccccccccceeenececeeecesaeeeceeeeseceaeectaeseeeccneeseaeeredeessaseseaeeeseesesdeeetaesenaeed ii Acknowledgment .0...........ccccecssccccscneceesenececeeeaeeeessnaeersesseeeessnaseceesneneeecessneneeseseaaes lil List of Figures .............cccccees ec ccesceecesseeeeeceeeeeeceseeeeeeaeeeceetseeeccsessseeecesessseeteneaeees vi List Of Tables .........cccccccccccsssscessssceeeeeeeeeeeeeseessseneeeceeeeseesesesesnsaeasssaeeeeeeesesesees vi

1L.O INTRODUCTION .........0.ccccccccccccccccesescneeeseeeeeaceeeeesseseaaeeeseesessesssseeeseessensnees 1 2.0 STATEMENT OF NEED 00000... cc. cccccccccccccetnce cee ceneceeeceseeeeteseeeeeesenennaeeesenseenias l

2.1 HISTORICAL BACKGROUND... ccscssessseseeseesessesesseeeeenesesneeneaeeneenes 1 2.2 DEFICIENCIES OF CURRENT SYSTEMS .....cccccceccccceeeenteeeee 3 2.3 CONCLUSION... ccccccccccccesescecceeeensneeeeceseenneeeeeeeseeseesstseseeeteesaaees 3

3.0 OPERATIONAL REQUIREMENTS 0.000... .ccccccccesssstcceeecesceessstteeeeeeseesesaaeesees 4 3.1 MISSION DEFINITION..........0..ceccccccecceceseeceeeeeseneceesassseeeeseeateeessaes 4 3.2 MAINTENANCE CONCEPT ooo... cccccccccnceceeeeeeeesecnteeeeeeseeetneaaeeens 9

3.2.1 Organizational Maintenance ....0... cece cceeeeeeeceeeeeeeteetneeeeees 9 3.2.2 Intermediate Maintenance .............ccccccccccsccccceceeceseesentssssseneees 10

3.2.3 Depot Maintenance... ccccccsssccccesccceeeeesesceseeeestsssssaeees 11

3.3 SYSTEM PERFORMANCE AND PHYSICAL PARAMETERG......... 1] 3.3.1 Weight 0. cccceccccets te ceeeeeecesenssseeeeaeeeeeeeeeeseeeeeesteeaaaas 11

se 0271-4 | | ee 1]

3.3.3 PACKAQING oeceeeseecccccssnsecetssneceessseecesnsneeesesseceesesessaeesseeeaaeesoenee 11 3.3.4 RETIADILIY oc ceeccccccccssscceesssecssseeeceseaeeesessaceeeeeeeaneeesesanaesensaas 11 3.3.5 Service Life...cecccccccccccccccsccsessssscceeccessecseeeessessneaaeaaeeeeeeesseseesnes 12

3.3.6 TOV ZOU. ieeecccccccccccnennesenetseececeeceesoecceecaneusseceesceseeeeanseensseeeereseees 12

3.3.7 Inherent single shot hit probability (Pssu) .........ccccccccceeceseneees 12 3.3.8 Operational RANGC ...ccccccccccccccesscceesesneeeeessacececeeesnseeeseesenecsenaes 13 3.3.9 RESPONSE WINGS ooo... ccc ccccccececee cece eee eetnes tee eeeeseeeeeeeeeeensttensnaanas 13

3.3.9.1 [ritial SHOt INC ooo cece cect ceeceeeteenssteeseesensanes 13

3.3.9.2 EXPOSUTE LINE oo... eeeecceceeseeecceeeeeeeseneeceeeterseaneeaeoesees 13 3.3.9.3 FUriChion UINICS .occccccccccccccceccccceeecesceccececeecenaceeonecaaenes 13

3.3.10 Weapon firing Attitude ....iecccccsscecsssscessseesenscesesseeeseseeeooees 13 3.3.11 Optical Sight.......cciiccccccccccsteceeesesseseeeesssssececseensecessneeassoesenees 13

3.4 ENVIRONMENTS .......0.ccccccccccccccsccecencececsecsncaaeecesesensneaaaeeeseseeeeeaaeeeees 13 BAD Geter ...ceccccccccccccccccceccssesssssceeeeesesseseeseaauaaaaaeaaaaseesseeeeeeeeeees 13

3.4.2 Natural EnvirOnimen ts ...cccccccccccccceceeseeesceeesssssssseessceseesesensesenees 15

3.4.2.1 TeMpPeranure ...ccccccccccsccccsscscessccessssscenseeesssseesssssees 15 3.4.2.2 Low pressure (Altitude) .....cccccccccccssssssensceeesenssnnseeeoes 15

3.4.2.3 HUmidity ...ccccesccccccccescccsssseeeeseeeesnsecenenecesenasesesneesens 15 3.4.2.4 Sand ANA AuUSt...ecccccecccccccccceccseesessssanscaenanseeeeeseeeenenees 15

3.4.2.5 ICing/freCZING FAIR eeccssecsesesesssessssrsvessesctesstsssessseseaes 15 3.4.2.6 SAUt JOS oc ccccccccececssscseceeccssensesetsnnanacceeaneceeseeeseneesenees 15

3.4.2.7 FUNQUS oc ccccesscscseceeessncceeeessssaeeeeesesesssnenaceeesosssesaaeeens 15 3.4.2.8 SOlar PAGIAUION......ccccccccsssnccceeeesssnsncecencesensssonseesoeens 15

iV

Page 6: April 22, 1996 - Virginia Tech

3.4.2.9 Water iimer Sion ....ccccccccesesssnccceeeenssscneneeesensenseeeeees 16

3.4.2.10 ROG oe eeccccccccccccessnsneceeceesesnaaeeceessenseaanaecsesteenseesoees 16

3.4.21 Winds oeciccccccccccccscccccceeeesssnscceesessssanacaseccssssanaeessees 16 3.4.3 Induced CrvirOnnens .....cccceccccccccssccnscccccccccccceesseesssnensananaaeeees 16

3.4.3.1 ACCOLErQLIONL...ccccccccccsececeeeesessnnnsnsencceceeesceseeesusneaaaes 16

3.4.3.2 Temperature SNOCK ...csccccccsssccccesssseecevsssceescsssessoesaees 16 3.4.3.3 Basic transportation VibratiOn.......cccccsesssersesscessenes 16

3.4.3.4 Loose CAPO VIDPALION ..cccecccescsseessessesseteeseeseeseseeseens 17 3.4.3.5 Tactical Vibration ....cccccccccesssssscceesesessesaceeeensseneeenens 17

3.4.3.6 Missile-in-flight ViDFration ....ccccccccceessesesscceessnenceeeoes 17

3.4.3.7 THAHSIE AOD cicececccsscccsssecseeeseesessesneneanccenaceeeeeseeesesees 17

3.4.3.8 MU .oocecceccccccccesccssssneceeeeescsneeceeceeeeasaaneeeeseeseaseeesecenns 17 3.4.3.9 Parachute APOD ...cccccccccccccecscssceccceseesssnenaceeseesssneeeoes 17 3.4.3.10 ROG] TIPACH....ceeccececcccecceesseeessensnenaeenseseeseceeseresenees 17

4.0 FUNCTIONAL ANALYSIS... cccccccceectecceeteeneeeeeeeeseseeaaceeeeeeesscsereeeens 17 5.0 REQUIREMENTS ALLOCATION. 000... ccceccccececeseenncceeeeeeesetenseeesessenanees 23 6.0 LIFE CYCLE COST ANALYSIS 00.0... icccccccccccceeeeceeeeeeeeeeettcaeeeeeesenntneeeeeneas 25

6.1 RESEARCH AND DEVELOPMENT COST... eeeeeenteteeees 26 6.2 PRODUCTION COST oo cccccccccccccceccccessneeeeceseeentseaeeeeescssnseeeeentees 26 6.3 OPERATION AND MAINTENANCE COST .........cccccccccsssecceeeeeneees 26 6.4 DEMILITARIZATION AND DISPOSAL COST 0.00... ceeeeeee 27 6.5 LIFE CYCLE COST ESTIMATE AND PROFILE.............00:ccccceeerees 27

7.0 SRAW SYSTEM DESCRIPTION. 0.0.00. cccccccccecceceeceesenseceeeeeeeectenseeeeeneesneees 31 7.1 INTRODUCTION .........ccccccecccccccceeeeeeesceeeeseessssnnneeeeeeescaesnsetesesensaaes 31 7.2 LAUNCHER... cccccccccccceeecencneeececeeseeetaaeeeececsnsneeeceeeeteeseaereeesneaaes 31 7.3 MISSILE ASSEMBLY ..000... cece ccccccccccceesceeeceecesesteeeseeeescusssaeeeeenseeaaas 32

7.3.1 Target Detection Device (TDD) ....cccccccccccctccccetteetttseeeeeentanes 32 7.3.2 Warhead Module ........ccccccccccccceccetee cee sense teeeceesecnensaseeeeensanaess 33

7.3.3 Flight Module 00... ccccccccccccccccceceestecetescsesssceseseeesssessucessessenanes 33

8.0 SRAW LAUNCHER HUMAN FACTORS ISSUES... cccccecceceeseetteees 36 8.1 INTRODUCTION 000. ccececeeeeeetneteeseestenaneees s aeneceeeeeeneeaaes eee 36 8.2 HUMAN VISUAL SYSTEM... eeecccccceteesnnceeeeeeeseeentaaeeeesenneaaeeees 39 8.3 PREVIOUS RESEARCH ON ANTITANK WEAPON SIGHTS ......... 40 8.4 SRAW OPTICAL SIGHT HF REQUIREMENTS VERIFICATION .. 43

8.4.1 Test Procedure ......c.ccccccccccccccccececceeteeessaneeceeeeseceeteseseetsennanaaaes 44

8.4.2 Test Results... ..cccccccccccccscccccsssssscecssneeeesssueeeeeuseaaeeeeesanneeeeas shane 47 8.4.3 Verification Testing Debrief SUMIMNATY .0......ccc cece tet eees 49

8.4.4 Verification Test Conclusions and Recommendations ............ 49

9.0 CONCLUSIONS 20.0... ccc ccccccccssscccnseeesesseeeenssesecseeeeseeescsaeeessaeeessteeeesnaeersas 50 10.0 RECOMMENDATIONS FOR FURTHER STUDY ........0..ecccccccecestceeeeteees 50

REFERENCES .........ccccccccesscccesecscesteeesssseceenseeceseeesetaeceeaeecessaeeeseeeseneeses 52 SELECTED BIBLIOGRAPHY 0000... ccccccccceccceseesnneeeeeeteetensaaeeeeestsnaneeees 53

Page 7: April 22, 1996 - Virginia Tech

List of Figures

. Page

Figure 3.1 - SRAW Operational Life Cycle... ccccccceccessceeeesneeeeesteeeeesneeeeseas 7 Figure 3.2 - Second Level Distribution of SRAW During Operational Life Cycle... 8

Figure 3.3 - Mission Profile - Weapon Operational Sequence............eceeeeeeeeteees 10 Figure 4.1 - First Level Functional Analysis Flow Diagram for SRAW ...............6. 19 Figure 4.2 - Second Level Functional Analysis Flow Diagram for SRAW............... 20

Figure 4.3 - Third Level Functional Analysis Flow Diagram for SRAW.................. 21 Figure 4.4 - Maintenance Flow Diagram for SRAW.............cccccccccesssecesesseeeeeseeeees 22 Figure 5.1 - SRAW System Requirements Allocation..............cccccecseecsseeeesseeeeseeees 24 Figure 5.2 - SRAW Launcher Requirements Allocation............ccccceeeseeeeeteeeeeeeens 25 Figure 6.1 - Life Cycle Cost Profile.......0.....ccccccccccccssscesssseeeessscesessseeesesesssseesteeeens 28 Figure 6.2 - Life Cycle Cost Breakdown Structure............cccccccccceseeeeeseeeesteeeenseeees 30 Figure 7.1 - SRAW Missile with Launcher... cccccccccceececeeeessteeecessststeteeesennas 34

Figure 7.2 - SRAW Missile Principle Components ...............ccccccccseccceeeesteeeeetseeeees 35 Figure 8.1 - Prototype Launcher Design ............cccccccecccscccceeesseceeeesteeeeseetseeessteeeess 38 Figure 8.2 - LAW Reticle Pattern..........0...cccccccccccsssccesecseeceesseesesteeeeresesnseessseeens 41 Figure 8.3 - LAV-25 Frontal and Side View ............ccccccccssscceeecesstteeeeeessssteeseeseees 44

Figure 8.4 - Questionnaire .........00cccccccccccecccssseeeeeeeseeeeeecssneeeeeeeseeeeesseesensaeeceeas 46

Figure 8.5 - Number Of Gunners Preferring Each Configuration ..................cc0cc0 49 (Stationary Side View)

List of Tables

Page

Table 1 - Infantry Anti-tank Organization and Requirements .........0...cceeeeeseeees 2 Table 2 - Environmental Requirements .................ccccccceeseeeesseeeees ecteeeeeseteeereeteess 14 Table 3 - Life Cycle Cost Estimate .......0.0.0c.ccccecccccccsesescscesesssessseseeeeecsceeessseaeen wae 29 Table 4 - Optical Sight Test Configurations .....0.0....ccccccccccccessecessssceesseeeenseeeessserens 43 Table 5 - Test Scenarios ..........ccccccceeccceeeeseecestnceecenneesenacececeneeeeseaeeeeseeeseeseeeeesaas 45

Table 6 - Data Summary .....0.....0ccccccccccccesscccessecesesseeeeesseesecesseesensesesaeessesesensseeegss 48

vi

Page 8: April 22, 1996 - Virginia Tech

1.0 INTRODUCTION

This paper examines the systems engineering process of the development of a new

lightweight weapon system, a Short Range Anti-tank Weapon (SRAW) for the United

States Marine Corps (USMC). The systems engineering approach has been applied to this

system. The need for such an anti-tank system is established from examining currently

fielded ant-tank systems. The maintenance concept, operational requirements, functional

analysis, and requirements allocation are presented with an emphasis on the human

interface. The SRAW optical sight requirements are presented by the author to illustrate

the flow-down of the systems engineering process to the component subassembly level.

Each section of the report will focus on the SRAW system with the optical sight being

presented in more detail where appropriate to illustrate the transition from the general

(SRAW system) to the specific (SRAW optical sight). The results of a field test

verification of the optical sight requirements are presented as one example of the iterative

system development process.

2.0 STATEMENT OF NEED

2.1 HISTORICAL BACKGROUND

Combined arms warfare stresses the neutralization of enemy armor before contact

with infantry. This is accomplished by airborne platforms and friendly armor. In

situations where friendly airpower and armor is not available, the infantry must stand alone

with their organic weapons. This was dramatically brought home to the USMC on July 5,

1950 during early fighting in the Korean War. Lt. Col. Charles B. Smith with 540 soldiers

from the Ist Battalion, 21st Infantry went into battle against two North Korean regiments

with 33 tanks. Task Force Smith was overwhelmed, suffering heavy casualties. Task

Force Smith was composed of WWII veterans who did not break and run, but spiritedly

engaged the enemy. However, their antitank weapons were ineffective against the

Russian-made T-34s.!

Page 9: April 22, 1996 - Virginia Tech

New tactics and the development of modern reactive armor were prompted by the

effectiveness of Antitank Guided Missiles (ATGM) during the 1973 Arab-Israeli War,

when Israeli armor units suffered heavy losses by Egyptian ATGM. The new reactive

armor rendered many existing lightweight antitank systems obsolete.

The strategy and planning organizations within the Defense Department recognize

the threat to infantry posed by enemy armor. The current organization, doctrine, and

weapons mix of anti-tank infantry forces is the result of a 1950’s systems engineering

study. This study resulted in technology-driven categories of weapons: Light Weapons,

Medium Weapons, and Heavy weapons. This study was exclusively focused on the

massive Soviet armor threat in the European theater. Table 1 summarizes the results of

this study. These ranges and weights were then dictated to the weapons development

community. Initial fielding of weapons to meet these requirements (Light Assault

Weapon, Dragon, and the Tube launched Optically Tracked Wire Command weapon)

were completed by 1970.

Table 1 - Infantry Anti-tank Organization and Requirements

Weapon | Organizational Element Range Weight Weapon Ist

Category (meters) (Pounds) Issued

Light Company (200 men) 0-250 10 grew to 20 LAW

Medium | Battalion (600 men) 250-1000 | 30 grew to 50 Dragon

Heavy Division (3000+ men) 1000-3000 | Vehicle Mount TOW US ground forces are not often exposed to enemy armor without considerable

friendly armor and airpower to call upon. Situations arise where rapid reaction forces

such as airborne units, mountain brigades, and the USMC can be called upon to face

heavy armor of considerable quality. The recent Persian Gulf conflict illustrated this

situation. The first units to arrive in Saudi Arabia were elements of the 101st Airborne

Page 10: April 22, 1996 - Virginia Tech

and the USMC 7th Marine Expeditionary Brigade.” They referred to themselves as “speed

bumps” because they were deployed without their heavy equipment backup and were

incapable of stopping a heavy armor attack by Iraq. Initial insertions of American troops

can expect to face similar situations in the future, and will continue to need light category

anti-tank weapons.

2.2 DEFICIENCIES OF CURRENT SYSTEMS

Currently fielded man-portable antitank weapons are not capable of defeating

modern enemy tanks from all orientations. All current systems with sufficient lethality

weigh in excess of 50.0 pounds and are high cost systems, not truly man-portable or

disposable. Some systems such as Dragon require the gunner to maintain target tracking

for the duration of flight (multiple seconds), exposing the gunner to return fire. Other

systems are simply ineffectual against the heavy frontal armor of modern tanks

(insufficient warhead penetration). No man-portable weapon system currently in the field

is capable of firing from an enclosure. The noise, backblast, and toxic exhaust from the

rocket motor would kill or injure a gunner firing from an enclosed position. The inability

to fire from protected positions substantially reduces effectiveness in urban terrain and

reduces gunner survivability.

Cost is another deficiency of currently fielded anti-tank systems. The current

systems have very high operational maintenance costs, often driven by the missile

launcher. The launchers not disposable and as such require corrective and preventive

maintenance by highly skilled personnel. A launcher spare parts inventory must be

maintained and transported to the operational location. The missiles are inserted into the

launchers under field conditions, exposing the launcher interior to extreme environments.

The optics in current systems are high cost items, as they are designed for multiple firings.

2.3 CONCLUSION

To meet the emerging world-wide armor threats with low maintenance and low

cost, a Short Range Antitank Weapon (SRAW) must be developed for the USMC. The

Page 11: April 22, 1996 - Virginia Tech

system will be deployed worldwide, under all environmental conditions. Major

requirements for the system appear below.

e Cost Requirements

> Employ a disposable launcher concept to:

e reduce operation & maintenance cost;

e allow low-cost single use optics.

> Meet a $10,000/round Design Production Cost goal.

e Human Factors Requirements

> Weigh less than 20.0 pounds.

> Minimize gunner exposure time by employing fire and forget guidance.

> Easy to operate (user-friendly).

e Technical Requirements

> Be capable of firing from an enclosure.

> Require minimal scheduled and unscheduled maintenance.

> Engage targets at operational ranges of 17-600 meters.

> Defeat current and future main battle tanks with a minimum Probability of Single

Shot Hit of 0.5 at 500 meters. |

Note that the range requirement has been increased from 250 meters in the 1950’s study

to 600 m as inexpensive guidance technology developed. SRAW must be ready for initial

delivery by the year 2000 so as to keep pace with the evolving threat. The SRAW has

been identified as a high priority item for the USMC. Funding sufficient for the design,

test, and procurement of 21,000 units has been budgeted.

3.0 OPERATIONAL REQUIREMENTS

3.1 MISSION DEFINITION

The primary mission for the SRAW is to provide rapid-reaction ground forces with

an organic weapon system capable of defeating main battle tanks. This will be

Page 12: April 22, 1996 - Virginia Tech

accomplished by a light-weight, fire and forget, shoulder-launched missile package capable

of going with the troops into any environment. Although effective as an individual anti-

armor munition, the SRAW effectiveness will be maximized through a coordinated

employment plan and a well-trained gunner. The SRAW will be integrated into the anti-

armor tactical planning at the USMC Warfighting Center, Quantico, Virginia, and assault

gunners will be trained at Camp LeJeune, North Carolina. The SRAW is being designed

with emphasis on product life cycle. The SRAW completed preliminary design and was

approved for detailed design and development in June 1994. The detail design and

development in the Engineering and Manufacturing Development Process is to be

completed by February 1998, at which time a production decision (Milestone III) will be

made. The SRAW will first be delivered to the USMC in August 1999, delivery to the

first units by January 2000. A total of 21,000 units will be produced at a rate of

5,000/year. The units will have a ten year storage life, after which they will be phased out

and returned to the manufacturer for disposal.

The simplified operational life cycle by which the weapon will be deployed is

depicted in Figure 3.1. The weapon development will proceed from definition of

requirements to preliminary system design and then to detail design and development.

When block number 3.3, System Prototype Test and Evaluation, is completed in a

satisfactory manner, the SRAW weapon will be produced. The weapon will be distributed

to the USMC who will operate the SRAW in the gunner environment or maintain the

SRAW system. At the end ofits ten year service life, each SRAW weapon will be

returned to the manufacturer for disposal.

Figure 3.2 presents the second level distribution of the SRAW to the USMC.

The weapon will be transported from the manufacturer via air, truck, ship or rail to

intermediate maintenance sites in its palletized shipping container. These intermediate

maintenance sites include prepositioning ships, weapons stations, and logistics bases

worldwide. From here, the weapons will be transported to the Fleet Marine Force (FMF).

The FMF constitutes the end user of the weapon (the customer). The FMF customer will

Page 13: April 22, 1996 - Virginia Tech

open the shipping container and transport the weapon by infantry vehicle, landing craft, or

helicopter. The FMF gunner in the field will make a decision to fire the weapon. If the

weapon is unfired, the gunner will return it to the FMF inventory. Damaged items will be

returned to the Marine Corps Logistics Bases and from there, returned to the

manufacturer for disposal.

Page 14: April 22, 1996 - Virginia Tech

dpOAZD VT PuoHVIdg

A VAS - Te

.ansyy \

w9}s4g

AVUS Wee

0°L wasfg

. QWs

9 /

tasks

AAVUS asodsiq

0°8 MYUS BNQGLYST

O'S MYVUS

DNpPorY O'p

pUdWUOITAUA aouuNy

Ul .

MVUS Hv190Q

0°9

as . ‘e

69D

UOHENISAT 32

S9p IdAJOVOIY

wo9yshg OF

IWaAS vo

OD ON

MONUYIY

puw sysoyyuts

wosyslg C71

O5 ON

zdoou0r pUpUpY

8 I

°° 05

t shox Teuoesedo

hrommdopadcy IPAVO)OA

YL W9aySAG

7'¢ soypnyg

Ayypiqysea.y 1

ped

d 05

ON’ | saipnig

Dpery wy

sys{pemy waps(¢

ctl OD

ON .

udysacy penjzdaau07

ZT

Haisoq] <a

re | +—_

UOHVIO]TY Jeuoypun,y

wozsg 1-7

r PIN

Jo MOH A

IG

17 +

udysaqy wayskg

Crewpiyp.y

0°7

h

7:

Judtudopsarqy ap

UdIsaq [1e)9q

O'¢

a

syuaruozpnbayy wajys{g

auyaqy O°y

at

Page 15: April 22, 1996 - Virginia Tech

!

a[oXQ ayrT jeuonwsodg

oy} SUNG JASN

OY} 0} MVUS 94} JO vornquysiql

Joao] puooas 7Z"¢ aINSIy

QNS| Ol MVUS

anqiasiq ‘O'S

‘1 ¢ aINBLy

Joy

Page 16: April 22, 1996 - Virginia Tech

A FMF gunner making the decision to fire the weapon will employ the operational

sequence illustrated in Figure 3.3. The gunner must detect a target, unsling the weapon

from a carry position, and assume a firing position. The gunner must be trained to clear

the backblast area of friendly troops. The optical sight may then be deployed, and the

target acquired within the reticle pattern. The gunner, using the optical sight, must

identify the target and determine if it is in range. By depressing the arm button, the missile

batteries will power up. The gunner will track the target and depress the trigger, releasing

the missile. The period between target detection and target acquisition is referred to as

the initial shot time and must not exceed 20 seconds. Gunner exposure time, defined as

the time period between target acquisition and missile first motion, must be less than 10

seconds. The missile will then cover the 600 meter range in less than 3 seconds.

3.2 MAINTENANCE CONCEPT

To minimize life cycle deployment costs, scheduled and unscheduled maintenance

will be minimized. Design compromises and weight penalties will be accepted to comply

with the “wooden round” concept. A “wooden round” 1s a stand-alone inventory item,

requiring no spare parts. The item is used once and discarded. Marine units in the field

will treat SRAW as any other round of ammunition. ‘No special facilities will be required.

3.2.1 Organizational Maintenance

The organizational maintenance site for SRAW is the FMF Scheduled -

maintenance will consist of visual inspection for launch tube damage and optical sight

integrity. The FMF will mount the nightsight as required by their missions. Damaged

items will be tagged for return to the manufacturer through the Marine Corps Logistics

Bases. Unscheduled maintenance will consist of removing mud or ice from the launcher.

Emergency situations such as transportation accidents will be handled by Explosive

Ordnance Disposal personnel.

Page 17: April 22, 1996 - Virginia Tech

INITIAL SHOT TIME

Target Detection Target Acquisition =

Unsling Weapon Assume Firing Deploy Acquire Position & Clear Sight Target

Backblast Area | |

T-17 sec T-14 T-10 T-7

EXPOSURE TIME

Target Missile Acquisition Determine Depress First

Target In-Range Arm Maintain Depress Motio ID andlayon | & Raise Trigger Button Target Trigger

Target | Guard Track |

T-7 sec T-5 T-2.5 T-0.5 T-0

MISSILE FLIGHT TIME

First Warhead R = 600m

Motion Arm |

T+0 sec T+0.45 — T+2.8

Figure 3.3 Mission Profile - Weapon Operational Sequence

3.2.2 Intermediate Maintenance

The intermediate maintenance sites for the SRAW are Maritime Preposition Ships,

Naval Weapons Stations, Fleet Wholesale/Retail Activities, and the Marine Corps

10

Page 18: April 22, 1996 - Virginia Tech

Logistics Bases. Scheduled maintenance consists of visual inspection of the shipping

container for damage and return of damaged units to the manufacturer. When the weapons

approach the end of service life, the intermediate maintenance sites will return them to the

manufacturer for disposal. Emergency situations such as transportation accidents will be

handled by Explosive Ordnance Disposal personnel.

3.2.3 Depot Maintenance

The depot maintenance site for the SRAW is the manufacturing plant. The

manufacturer will be responsible for the SRAW production, initial transportation to the

Marine Corps activity, and eventual safe disposal of damaged/obsolete units.

3.3 SYSTEM PERFORMANCE AND PHYSICAL PARAMETERS

The top level requirements, the mission profile and the maintenance concept drive

the performance and physical parameters. The worldwide deployment of the USMC

drives the required environmental conditions. Note that this is a partial listing of the

SRAW requirements. The SRAW Prime Item Development Specification contains a

complete listing.

3.3.1 Weight. No more than 20.0 Ib.

3.3.2 Length. Not to exceed 40.0 inches.

3.3.3 Packaging. The weapon is a self-contained, man-portable, wooden round. The

launcher serves as the package for the field handling environment.

3.3.4 Reliability. Since this system is an expendable muniton that will fire a single shot

and be discarded, reliability parameters such as mission duration and mean time between

operational failure do not apply. Each firing of a SRAW will be treated as an independent

Bernoulli trial with success being defined as the system functioning properly, i.e., weapon

reliability is the probability that the gunner will be able to sight in on a target, that the

ll

Page 19: April 22, 1996 - Virginia Tech

SRAW missile will be propelled from the launcher with the actuation of the propulsion

system, that the missile maintains a stable flight, that the Target Detection Device (TDD)

functions against specified targets, and that the warhead detonates high order. The

probability that the SRAW shall perform in this manner under the specified induced

(storage, transportation, and field handling) and natural environments shall be at least 0.95

at a 90 percent lower confidence level (LCL).

3.3.5 Service life. The weapon shall be designed for a service life of 10 years. Service life

shall consist of a mixture of storage time, normal transportation and handling time, and

field handling which the weapon may experience without degrading performance and

reliability below acceptable limits. This excludes damage by mishandling, contact with

unauthorized materials, or exposure to environments in excess of the required design

environments. Typical time frames associated with each phase of normal service life cycle

are: storage no more than 10 years, transportation no more than 3 months, and field

handling no more than 3 months.

3.3.6 Targets. The weapon shall be capable of accurately engaging and defeating current

and future advanced heavy-armor targets.

3.3.7 Inherent single shot hit probability (Pssu). The weapon Pgsy is defined as the

probability that the missile will fly over the target at a lethal standoff, the Target Detection

Device (TDD) will recognize a valid target and the warhead will detonate with timing and

orientation such that the Explosively Formed Penetrator (EFP) will impact the target. The

lethal standoff is the range of distances between the warhead and the target within which

the warhead will meet its performance requirements. The weapon Pssy against a 2.3m x

2.3.m x 4.6m (h x w x d) stationary target shall be no less than 0.5 (at a 90% Lower

Confidence Level (LCL)) at a range of 600 meters. The Pssy against a 2.3m x 4.6m x

2.3m (h x w x d) target crossing at a minimum of 24 kilometers per hour at 90 degrees to

the weapon-target axis shall be no less than 0.5 (at a 90% LCL) at a range of 200 meters.

12

Page 20: April 22, 1996 - Virginia Tech

3.3.8 Operational Range. The operational ranges for the missile shall be from 17 meters

(minimum) to 600 meters (maximum effective range) against stationary targets and from

17 meters to 200 meters against moving targets.

3.3.9 Response times. /

3.3.9.1 Initial shot time. The time from the carry/field handling position to the

ready-to-fire position, with the gunner in the kneeling, sitting, prone or standing position,

shall not exceed 20 seconds. This time does not include the time required to mount a

night vision device/scope.

3.3.9.2 Exposure time. The gunner's exposure time-to-fire the weapon, once in the ready

to fire position, must not exceed ten seconds. The weapon shall be designed to minimize

exposure during operations (including noise and movement requirements) in all firing

positions.

3.3.9.3 Function times. The missile flight time shall be less than 3.0 seconds to a range of

600 meters.

3.3.10 Weapon firing attitude. The weapon shall meet all accuracy requirements through

gunner engagement angles from 30° depression to 30° elevation. The gunner engagement

angle is defined as the angle between the gunner to target line of sight and the horizontal

(gravitational) plane. The weapon shall meet all accuracy requirements when fired with a

initial roll angle of up to 15°.

3.3.11 Optical Sight. The sight shall allow the gunner to effectively engage stationary and

moving 2.3m x 4.6m x 2.3m (h x w x d) targets throughout the operational range.

3.4 ENVIRONMENTS

3.4.1 General. The weapon shall be capable of operating properly in all battlefield

environments. The environmental requirements are summarized in Table 2.

13

Page 21: April 22, 1996 - Virginia Tech

TABLE 2. Environmental Requirements.

NATURAL ENVIRONMENTS

Ambient Temperature

-54°C to 68°C i P

-40°C to 63°C . P

-32°C to 63°C P

Altitude

0 to 3,657 m P P

0 to 12,192 m Pp P

Humidity P P P P

Sand and Dust Pp P P P

Icing Pp P P P

Salt Fog P P P P

Fungus P P P

Solar Radiation P P P P

Water Immersion P

Rain P P P P

Winds P P P P

INDUCED ENVIRONMENTS

Acceleration Pp

Temperature Shock P P

Basic Transportation Vibration P P P

Loose Cargo Vibration P P

Tactical Vibration P

Flight Vibration P

Transit Drop P P

Mud P

Parachute Drop Pp P P

Rail Impact P P Requirement: P - Performance

4

The weapon and the shipping container are as described previously in this document. Four configurations of this weapon are defined:

A. Storage: Weapons stored in the shipping container and palletized with TBD shipping containers.

B. Transportation: Weapon in a single shipping container.

C. Field handling: A single weapon out of the shipping container with

the scope not deployed.

14

Page 22: April 22, 1996 - Virginia Tech

D. Operational: A single weapon in the ready to fire configuration with the scope deployed.

3.4.2 Natural Environments

3.4.2.1 Temperature. The weapon shall perform as indicated during exposure to the

operational and after exposure to the storage temperature specified in Table 2.

3.4.2.2 Low pressure (Altitude). The weapon shall perform as indicated during exposure

to the operational altitude and after exposure to the storage altitudes specified in Table 2.

3.4.2.3 Humidity. The weapon shall perform as indicated during and after exposure to

humidity and temperature profiles as specified in the "High Relative Humidity with High

Temperature" paragraph of MIL-STD-210, Climatic Information to Determine Design

and Test Requirements for Military Systems and Equipment.

3.4.2.4 Sand and dust. The weapon shall perform as indicated during and after exposure

to the sand and dust environments described in the "Frequency of Occurrence"

subparagraph of the "Sand and Dust" paragraph of the "Worldwide Surface Environment"

section of MIL-STD-210. (The helicopter downwash environment shall not apply to the

Operational configuration.)

3.4.2.5 Icing/freezing rain. The weapon shall meet all performance requirements after a

minimum accumulation of 19 mm of clear glaze ice has been removed, where required, by

the use of antifreeze, salt, alcohol, chipping or warming by any readily available source.

The missile shall be capable of meeting the performance requirements of the system when

fired in an environment of freezing rain.

3.4.2.6 Salt fog. The weapon shall meet all performance requirements after a 48 hour

(minimum) exposure to a 5% salt spray at 35°C.

3.4.2.7 Fungus. The weapon shall not support the growth of fungus under conditions

favorable for the growth of fungus.

3.4.2.8 Solar radiation. The weapon shall meet all performance requirements during and

after exposure to solar radiation as described in the "Daily Cycle of Temperature and

15

Page 23: April 22, 1996 - Virginia Tech

Other Elements Associated with the Worldwide Hottest 1-Percent Temperature Value"

table of MIL-STD-210.

3.4.2.9 Water immersion. The weapon shall meet all performance requirements after

immersion both in fresh water and a 5% + 1% concentration of salt water at a minimum 1

meter from the top of the weapon for a minimum of 2 hours each.

3.4.2.10 Rain, The weapon shall meet all performance requirements during and

after exposure to the rain conditions described in the "Rainfall Rate" paragraph of the

"Worldwide Surface Environment" section of MIL-STD-210 for the "10 year period” and

"1 hour duration".

3.4.2.11 Winds. The weapon shall meet all performance requirements during and

after exposure to the "1 percent extreme", "1 minute steady" wind environment described

in the "Frequency of Occurrence" subparagraph of the "Wind Speed" paragraph of the

"Worldwide Surface Environment" section of MIL-STD-210. The weapon shall meet all

performance requirements after exposure to the "1 percent extreme", "associated gusts"

described in this subparagraph.

3.4.3 Induced environments. The SRAW weapon shall meet the indicated induced

environmental requirements shown in Table 2 or as defined below. Unless otherwise

specified, the weapon shall meet all performance requirements after exposure to these

environments.

3.4.3.1 Acceleration. The missile shall meet all performance requirements during and after

exposure to the SRAW launch and flight acceleration environments (with an appropriate

confidence factor added, reference MIL-STD-810 Environmental Test Methods, Table

513.4-I and Table 513.4-I]).

3.4.3.2 Temperature shock. The weapon shall meet all performance requirements after

exposure to temperature shock between -54° C and 68° C.

3.4.3.3 Basic transportation vibration. The weapon shall meet all performance

requirements after encountering vibrations resulting from all modes of transportation:

land, air and sea per MIL-STD-810, Method 514.4, Procedure I, Test Condition I-3.3.1.

16

Page 24: April 22, 1996 - Virginia Tech

3.4.3.4 Loose cargo vibration. The weapon shall meet all performance requirements after

exposure to loose cargo vibration per MIL-STD-810, Method 514.4, Category 3 for 1.5

hours.

3.4.3.5 Tactical vibration. The weapon shall meet all performance requirements after

exposure to ground-mobile wheeled vehicle vibration and ground-mobile track vehicle

vibration per MIL-STD-810, Method 514.4, Procedure I, Test Condition I-3.4.7 for three

hours vibration per axis.

3.4.3.6 Missile-in-flight vibration. The missile shall meet all performance requirements

during and after exposure to in-flight vibration levels with a 50% safety factor added as

determined during flight tests in the EMD effort.

3.4.3.7 Transit drop. The weapon shall meet all performance requirements after exposure

to a 1.5m drop in either the Transportation or Field Handling configurations.

3.4.3.8 Mud. The weapon shall meet the performance requirements herein following

immersion in wet and dried mud as specified in Military Testing Definition Test

Operational Procedure 3-2-045 “Automatic Weapons, Machine Guns, Hand and Shoulder

Weapons” under all service conditions.

3.4.3.9 Parachute drop. The weapon, in the field handling and transportation

configuration, shall meet all accuracy requirements after air transport and air drop while

stabilized at ambient temperature and shall be capable of immediate deployment.

Packaging and rigging of material shall be in accordance with MIL-STD-814.

3.4.3.10 Rail impact. The weapon in the shipping container shall meet all performance

requirements after exposure to rail impact per MIL-STD-810, Method 514.4, Category 5.

4.0 FUNCTIONAL ANALYSIS

A partial functional analysis is presented to translate the operational and support

requirements of Section 3.0 into the design requirements of the SRAW. The operational

17

Page 25: April 22, 1996 - Virginia Tech

requirements and the maintenance concept were used to create Figures 4.1, 4.2, and 4.3

which show the operational functional flow to three levels. Figure 4.3 addresses the

optical sight operation. Figure 4.4 shows the maintenance flow diagram for SRAW to »

two levels.

18

Page 26: April 22, 1996 - Virginia Tech

a!

MVS

JO} Weiseicqy

MOP] sisAjeuy

yeuoNouN, [9A0"]

ISI Tp

oInsiy

W9}sAS

MVUS Were] OL

.

JUSWUOIAUA

(40)

OWSN

24} wHoI6kS

youuny ut

01 MVS

eNquIsIq

MVUS

Vs0esiq MVUS

a12I9d0 x

08 09

O'S

° w9}sA§

‘ yuoudoprasq

sik vesod

warshs |,

MVS

2Npold 29

uZisaq jleyeq

PUTA [otd

Ov Oe

07?

sjuswosnboy

woyskS ouyjoqd

Ol

19

Page 27: April 22, 1996 - Virginia Tech

MVUS

10} weiseiq

MOL

sisAjeuy seuotjoun,

JOAN] puodes

- Zp

BINSLy

MOP] souRUdUIRY]

‘p’p ONS

JOY

{ 09

ON

poyoune’y st

$}S9,[-Ul-yINg woIsto9qT

i 33

7s ;

STIS S1°9

ssed- p19 fT |

ae 9 alld - Z1°9

SUPPL BIE]

OD

= O19

osury yooIe |,

BD

sondoway vonng TAY

urysL

|, QI

pue YsIGf*

sseranoes I!

ssoldoq 6'9

QUILII}O] aunboy

- 19

koidaq 9°9

me O}eAIOY

3°9 .

deaf -

$9

O19

“ MOL]

SOURUDUILY ‘pp

OINSLY ‘Joy

t OD

ON }

USWUOJIAU uoIIsog

uodeaM HOMTPUO)

wa

Sunn yopjnous

yosIeL uodesM

; Jouuny

nea ;

-¢ pes}I9d

- 79 OD

yooyy) - 19

UL MVS

ouInssy- $°9

C9 |

aqeiodo -

0'9

JOAN] puodas

- MOP

siskjeuy [euooUN

20

Page 28: April 22, 1996 - Virginia Tech

MVUS

JO} Wresseiq

Mop] sisAjeury

jeUOTOUN JOA]

py

- Ep

oINSLY

uonoyy Apesis

‘YJOOWS Ul

JoSIV YT, JOSIE L,

uo seyssory

«=f Suraopy

urequreW ~ 7119

(x0)

Burypoevsy ose],

Jose J, enuyuod

119

UO IeYssol)

——

parry

a>

ulejureYy - T119

Areuoreys

soinjeay Surysingunsiq

UOT}eJUOUO yOBIV

dINJOIg ISIS

dnoakny on

of Te]

anQiny [e-|—-

YOBIV, UO

IeYSsol)

ul josIeEL

qf dy,

uP yoBIVL,

in 208d

- ['L'9

dIP dI-

$19

-di-#L9

JaW9D - £19

pulg - 7

L9

olnboy -

1°9

adoosuag dn-dog|,

ISIS JO

938}OY -

[°9°9 Aojdaq

- 9°9

JOAdT ps

- MOLY sisdjeuy

Jeuorjouny

21

Page 29: April 22, 1996 - Virginia Tech

MVXUS

10} Wieiseiq,

MOLY souRUaIUIRP

- pp

oIN3Ly

jesodsiq JO}

Jamnjovjnuryyy 0}

MVXUS Ayney

wNjay

TUL

[RATT PINT,

- MOLY souRUd WIRY

Saseg SOI}SIdO'T

sdiod suey

0}

MVUS Ayney

unjoy TT

. I L

J2AdT puooasg

- MOL] souvuauEy]

> as

Sanday OD

ON OD

ON

SUOISSTA] JYSIN,

jl a9] JO

Ayasoquy adeued

uoIssI [*|

JO; YSISIYSIN

[| wngypnyw

|* qY3Ig

TeondoO jo

oqny youne’y

Jo} uonIpuod)

enunuo) yorny

saowsy |OD

|uonsadsuy yensia

|OD |

wonoedsuy yensiA

uodea 49949

79 ‘Tp

By JOU

VL EL

TL VL

19 ‘Cp

sansty Jou

[PAd’T ISI]

- MOLY souRUa

UTEP]

22

Page 30: April 22, 1996 - Virginia Tech

All of the SRAW system functions could be detailed to the third level. Only the

optical sight functions are shown to this level. These diagrams show the SRAW system

operation is consistent with the low maintenance requirements and provide insight to the

functional requirements of the optical sight. These diagrams will also form the basis for

later analyses, e.g., Failure Mode, Effects, and Criticality Analysis, Fault Trees, Safety

Analyses, etc. of the SRAW system

5.0 REQUIREMENTS ALLOCATION

Figure 5.1 shows the overall system allocation of requirements. Note that since

this system is an expendable muniton which includes one-shot items (warhead, rocket

motor, batteries, etc.) the reliability allocation is presented in terms of success probability

for all components, even those components for which standard measures would normally

apply. The cost figures for the SRAW weapon refer to unit production cost based on

21,000 units. Life cycle cost details are discussed in Section 6.

The inherent reliability of the SRAW weapon (missile + launcher) must be greater

than 0.95 because when combined with gunner human limitations, the system must have

an inherent single shot hit probability of 0.5. The gunner will be under extreme stress,

performing heavy physical exertion, wearing bulky protective gear, or under hostile

environmental conditions. To account for the human limitations, gunner accuracy under

degraded conditions has been allocated at 0.6 probability of hitting the tank-sized targets

previously defined.

23

Page 31: April 22, 1996 - Virginia Tech

SRAW System

Inherent Single Shot Hit Probability: 0.57

Ranges: 600 m Stationary Target

250 m Target Crossing at 24 km/hr

[

I. saad SRAW Weapon USMC Assault Gunner

Reliablity: 0.956 Mean Accuracy at Req'd

Weight: 20 lbs Ranges Under Degraded

Cost: $10,000 Conditions: 0.60

| l. wal

Launcher Missile

Reliablity: 0.984 Reliablity: 0.972 Weight: 5 Ibs Weight: 15 lbs

Cost: $1,000 Cost: $9,000

Veeesssssssscussssetsnny qeesssscnanensvesssetaafesetsnseenenesssetene sl TDD Module Warhead Module Flight Module

Reliability: 0.998 Reliability: 0.989 Reliability: 0.985 Weight: 1.0 Ibs Weight: 6.0 Ibs Weight 8 Ibs

Cost: $3,000 Cost:$2,000 Cost: $4,000

.. | ” . Autopilot Rocket Motor Jet Reaction Control Assy

Reliability: 0.998 Reliability: 0.992 Reliability: 0.995 i Weight: 0.5 Ibs Weight: 6.25 Ibs Weight: 1.25 Ibs

Cost: $2,000 Cost: $1,000 Cost: $1,000

Figure 5.1 - SRAW System Requirements Allocation

The SRAW weapons subsystems result from the functional analysis. The missile

related functions evolve from Figure 4.2, 10.5, Missile Launch, if taken to the third and

fourth levels. A more detailed requirements allocation is presented for the launcher in

Figure 5.2. This allocation will meet the required gunner operational and maintenance

functions in Figures 4.2-4.4 and will help to form the basis for an optical sight design

requirement which takes into account gunner human factors.

24

Page 32: April 22, 1996 - Virginia Tech

Launcher

Reliability: 0.984

Weight: 5.0 Ibs

. Cost: $1,000

| J : levee J

Launch Tube Optical Sight Assy. Sling/Handles/Closures Trigger Assy.

Reliability:0.9965 Reliability: 0.9979 Reliability:0.998 Reliability: 0.9915 Weight: 3.0 Ibs Weight 0.5 Weight: 0.75 lbs Weight: 0.75

Cost: $600 Cost: $50 Cost: $250 Cost:$100

Figure 5.2 - SRAW Launcher Requirements Allocation

This allocation shows the cost and weight resource limits for the SRAW system.

System accuracy will be limited by the gunner. A SRAW weapon designed to these

requirements will be able to accomplish the mission profile within the cost budget,

employing the described operational and maintenance functions. A large cost driver in

previous, non-disposable anti-tank systems was the optical sight assembly. The $50

production cost and the 0.5 pound weight budget will limit the quality and size of the

SRAW optical sight. The disposable launcher concept will enable the SRAW optical sight

to meet performance within the total system constraints.

6.0 LIFE CYCLE COST ANALYSIS

A Life-Cycle-Cost (LCC) analysis has been conducted with the objective of

optimizing SRAW system characteristics of minimum LCC, high performance, and high

reliability. The major elements of the LCC are the Research and Development (R&D)

cost, the production cost, the Operating and Support (O&S) cost and the Disposal and

Demilitarization (D&D) cost. Costs are based on production quantity of 21,000 units

over 5 years.

25

Page 33: April 22, 1996 - Virginia Tech

6.1 RESEARCH AND DEVELOPMENT COST

This area includes the cost of funding the system management and engineering

design of the SRAW. All aspects of engineering design - conceptual, preliminary and

detail - are included. The cost of developing SRAW-specific technology is included in this

category. Initial feasibility studies, software coding and debugging, and design trade-offs

are accounted for in this category. Engineering efforts to support future product

improvements and all testing through the man-rating process are included in this cost

category. The cost of preparing, printing, publishing, and distributing all reports, plans,

and analyses relating to each design requirement is included. Once the design is finalized,

these costs are non-recurring.

6.2 PRODUCTION COST

Production costs include both recurring and non-recurring costs. Non-recurring

costs include tooling and test equipment costs of $10 million, construction cost of $25

million and First Article Testing costs of $10 million. Over the five year production,

recurring costs include production management, industrial engineering, manufacturing

material costs and labor costs, maintenance of constructed production facilities, quality

control management and inspection costs. Initial logistic support includes all integrated

logistic support planning for the SRAW system. This includes logistic program

management cost, inventory management costs, development of training manuals, aids,

and personnel, and initial transport of the SRAW to the Marine Corps logistics bases.

6.3 OPERATIONAL AND MAINTENANCE COST

Includes all costs associated with operation and maintenance of the SRAW after

delivered to the inventory. Life cycle management and operator training costs are

included. Note that operating personnel cost has not been included in this analysis.

Current Marine assault gunners will substitute the SRAW for their current issued weapon.

26

Page 34: April 22, 1996 - Virginia Tech

The gunners will require training on the new system, but their number will remain

unchanged. Maintenance of the system data package and product improvements are

included in this category. Distribution cost of shipment to any Foreign Theater of

Operation is an operational cost. The low maintenance concept reduces maintenance

personnel and support cost, corrective maintenance cost, spare parts cost, test and support

equipment cost, maintenance training cost, and maintenance facilities costs to zero.

6.4 DISPOSAL AND DEMILITARIZATION COST

This cost category includes all costs of SRAW demilitarization when removed

from service. Explosive disposal cost is included. Demilitarization will be conducted by

contractor personnel at the manufacturer plant at the end of the ten year storage life. This

category also includes funding for Explosive Ordnance Personnel to handle emergency

render-safe situations resulting from traffic accidents and the routine demilitarization of

systems that were activated, but not launched.

6.5 LIFE CYCLE COST ESTIMATE AND PROFILE

Table 3 presents the SRAW LCC estimate in constant FY95 dollars, assuming a

three year R&D program, a five year production of 21,000 SRAW units (1,000 units the

first year and 5,000/yr thereafter) and a useful storage life of 10 years. Remaining units

would then be disposed of by the manufacturer. The benefit of the low maintenance

concept is illustrated in Figure 6.1 which presents the LCC profile. The cost “spike” in

FY98 is derived from non-recurring, up-front production costs. After FY98, the funding

profile is much more benign because no spare parts inventory or preventive maintenance is

required. After production is completed in FY03, training costs predominate. The total

acquisition cost in 1995 dollars is $240,760,000. Figure 6.2 shows the LCC break down

structure.

27

Page 35: April 22, 1996 - Virginia Tech

COST

($K)

60000

50000

40000

30000

20000

10000

FY95

FY97

FY99

FY01

FY03

FYOS

FYO7

FYO9

FY14

LIFE CYCLE (YR)

Figure 6.1 - Life Cycle Cost Profile

28

FY13

Disposal

ONO0&M

Production

HR&D

Page 36: April 22, 1996 - Virginia Tech

o920pz| ss (M$)

JSOD UONISINDoY

|e}0)

OOZ} |OOSt

|OLLZ |OSPZ

1OSZZ |OSBL

|SZET ISZET

|SzES |Gze™!

|SZES Sze?

|SZEre |Gzers

|OOEKT 1000S

|00L22 |00S61 | 00091

(yg) JSOD

ajOAZQ ayr7q

penuuy

OOZ) jOOZL

|OOZE |OOZE

|OOL [OS

j|SZ j|SZ

|S@ jSe

jSe Se

Ge SZ

(4$) S05

jesodsiq

0 {009

jo16e |oszt

joss joos!

|ooez jooEez

jooez |ooez

|ooez |ooez

jooez |ooez

|ooEz ($$)

SOD WO

[2}OL oS

|S2 |oob

|oSt |ooz

|00z jo0z

|o0z jooz

jo0z j00z

j00z jo0z

[002 |00z

aoueuajuley eyeq

0 )

0 0

0 0

00S {00S

|00S {00S

[00S [00S

00S {00S

{00S .

s}UaWaAoldtuy] yONpOId

Q OSZ

|00S OSL

|OOO} |OSZE

|OSZt |OGZ}

|OGZL |OSZ}

10SZL |OSZL

[OSZ |OScL

jOSZ1 Huiures,

soyesadoO

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 aoUBUa}UIEW

Oo |s2

|S@ [oot

|00b jOOt

[004 [00%

joot |0O!

joot |00!

00! 00!

Joo; uolINqu}sig

waysks

0 002

|SZZ |0S2

|OSZ |OSze

|OSZ j|OSz

jOSz |OSZ

|OSZ |OSZ

jOSZ jose

ose "UIEW

aj9AQD ayiqswayshs

(M$) souReUa}UeEW

y UONeIedO

000ZZ | OOOZZ | 000ZZ | 000ZZ | 000ZS (Mg)

ISOD UONONpOl,

|e}OL

0 0

0 0

0000! S}Sa]

aJOIpY }SuI4

OOS! |O0St

|O0SI |OOS!

00S! pyoddns

21)816077 yentuy

000Z |000Z

|000Z j}000z

[00Sz jo1yuoyD

Ayyenho

00S [00S

{00S |00S

/o00Sz (Bursunoas-uou)

uoljonsysu04

0 0

) )

00001 Butlindai-uoy

00001 | 00001 | 00005 | 00001 | 00Sz

Buuunsay

‘ Buunjoejnuey

' OO0Or

|000r [000

|O00r /00SZ

Bulesuibuy jeuysnpuy

O00r |O00r

|000r |O00r

[C00E juawabeuew

uoljonpolg

(M$) SOD

UOHONPOld 00222

|00S6 I |00091

(M$) 1809

OPY

[e}OL

00SZ1}0008 |0009

uoljen|eAz 9 Sel

00Z }0001

|0001 uonjejuawnoog

ubisaq

000Z1|0006 |O0SZ

ubisaq Burseulbuy

Q00Z |00S!

|00S! juswabeuey wajskg

(M$) yuaudojaneq

pue yoeasay

EbAd | SAS |

ELAS | OLAS

| 60A4 | SOAS | ZOAS | SOAS | SOAS | VOAS

| EOAS | ZOAS |

LOAS

| OOAS | 66AA

| BGAS

| Z6AS

| GAS |

SEAS

OICUINIST ISO

BJOAD OFT

- € BGR.

29

Page 37: April 22, 1996 - Virginia Tech

|

Total SRAW

. Cost

System Acquisiton

| | |

Research &

Development Production Operation &

Maintenance Disposal &

Demilitarization

System |_| Production |_| System/Life Mangagement Management Cycle Maint.

Engineering |; Industrial | System

Design Engineering Distribution

Design |; Manufacturing} |_| Training Documentation

Test & | | Construction | |_ Product Evaluation Improvements

| Quality = Data Control Maintenance

Initial Logisitc

Support

1st Article Testing

Figure 6.2 - Life Cycle Cost (LCC) Breakdown Structure

30

Page 38: April 22, 1996 - Virginia Tech

7.0 SRAW SYSTEM DESCRIPTION

7.1 INTRODUCTION

The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) is currently

procuring a Short Range Antitank Weapon (SRAW) system to meet these requirements.

NSWCDD is in the eighteenth month of an Engineering & Manufacturing Development

(EMD) program to demonstrate the performance of a production ready system. SRAW

missiles are currently being flown at test facilities in China Lake, California. This section

describes the characteristics of the system under test.

The SRAW consists of a missile in a launcher as shown in Figure 7.1. The SRAW

uses an on-board inertial sensing system to guide it to its target. The SRAW is designed

to fly over targets and uses both a laser for active optical ranging and a magnetometer for

magnetic sensing to detect targets. When the SRAW missile senses the target, it fires a

top attack penetrator warhead. This warhead exploits the more vulnerable turret armor.

After the missile is launched the launcher becomes a disposable item.

7.2 LAUNCHER

The Launcher Assembly consists of a graphite/epoxy filament wound launch tube,

mechanical trigger assembly, optical sight assembly, carry handle and sling, end closures

and shock isolators. The launch tube features an internal, 45 degree conical seat which

provides the interface for the missile. Once installed, the missile is held in tension between

the seat and the launch tube aft end by the Aft Closure Release Mechanism (ACRM). It

holds the missile in the launch tube and the aft closure in place prior to launch. During the

launch sequence, immediately prior to launch, the ACRM is ejected by activation of a

warm gas pressure cartridge. The end closures provide an o-ring seal to protect the

missile from the external environment. In addition, the missile is protected from drop

shocks during field handling and transportation by the foam isolators located at each end

3]

Page 39: April 22, 1996 - Virginia Tech

of the launch tube. The length of the Launcher Assembly is approximately 34.5 inches.

The outside diameter of the launch tube is 5.7 inches while the outside diameter of the

shock isolators is 8.2 inches. The total weight of the Launcher Assembly is approximately

5.0 pounds. :

Examining the optical sight assembly in greater detail reveals packaging oriented

constraints. Weight and the required physical envelope require that the objective lens

diameter be no greater than one inch. Conceptual design studies revealed that the optical

sight must periscope away from the launch tube during use to accommodate the gunner’s

helmet. The length of this mirrored periscope assembly must be less than 2.2 inches. To

meet the initial shot time requirements, the sight assembly will be fixed-focus. No

adjustments to the sight assembly will be possible. This will also reduce the possibility of

damage to the sight assembly by eliminating sight deployment during field handling. The

sight must be designed so that under nominal conditions the resolution is limited by the

human eye, minimum resolution of 1 minute of arc (290 prad). The transmission goal at

low light levels is 50% minimum transmission.

7.3 MISSILE ASSEMBLY

The Missile Assembly in Figure 7.2 is made up of three modular sections:

e Target Detection Device (TDD)

e Warhead Module

e Flight Module ,

The missile is 5.5 inches in diameter, 27.5 inches long and has a total fin span of 10.4

inches. It weighs 15 pounds.

7.3.1 Target Detection Device (TDD)

The TDD module is an integrated target sensing system that utilizes a laser ranging

device and a three-axis flux-gate magnetometer to sense tank targets as the missile flies

above them and to calculate the firing point for the warhead based upon target shape and

32

Page 40: April 22, 1996 - Virginia Tech

height above the tank. The TDD module interfaces with the remainder of the missile

system electronics through a connector. Based upon the nature of the range and magnetic

signatures, the microprocessor determines if and when to output a firing signal to the a

warhead module.

7.3.2 Warhead Module

The Warhead Module consists of a Explosively Formed Penetrator (EFP)

Warhead, transfer manifold, and a safety and arming assembly all housed in a plastic

structure. The warhead is designed to defeat the roof armor of a tank in a close missile

overflight application.

7.3.3 Flight Module |

The Flight Module consists of the rocket motor, Autopilot Assembly and Jet

Reaction Control Assembly (IRCA). The rocket motor assembly is a two stage

propulsion system consisting of a launch motor and a flight motor. The missile guidance is

controlled by the Autopilot Assembly and the JRCA. Control Algorithms are

implemented by a microprocessor which issues on/off commands to appropriate valves of

the JRCA. Four pop-up fins are attached to the JRCA to provide stable flight

characteristics. Gas generator thrust is vectored by the eight JRC valves which open and

close by command of the autopilot. JRCA thrust controls attitude and flight path of the

missile.

33

Page 41: April 22, 1996 - Virginia Tech

UYAHONN VT

HLIM ATISSIN

MVS

- VL TANS

34

Page 42: April 22, 1996 - Virginia Tech

(HOVa p)

SNI4

VOur

SLNANOdWOO ATdIONId ATISSIN

MVUS

- 7L TANS

QVAHYVM

YOLOW

LANDOY

ONIYIVA LAV

ASSV LOMdOLNY

JINGOW

QVAHYVM

TINGOWN

LHSMA

ae YAAISOAY

YALAWOLSNDVIN

WV AJINGOW

qaqr

35

Page 43: April 22, 1996 - Virginia Tech

8.0 SRAW LAUNCHER HUMAN FACTORS ISSUES

8.1 INTRODUCTION

At this point in the development life cycle, the detail design focus is on the SRAW

missile. Detail design of the launcher has been deferred until the missile is mature. A

prototype launcher has been delivered for a human factors evaluation. This evaluation will

be the last cost-effective opportunity to review the launcher requirements and influence

the design .

Proper design of the SRAW launcher is critical to system success. The launcher

must protect the SRAW missile from environmental stress (hot/cold temperature

extremes, moisture, etc.), transportation vibration, inadvertent drops, and field handling

conditions. The alignment tolerances of the launcher will have direct impact on system

accuracy. Moreover, the launcher is the human-machine interface for the system. The

Marine will never see the SRAW missile until it is launched. His perception and usage of

the system will be dependent on the launcher. A well-designed launcher will allow the

Marine improved mobility, increase his ability to successfully engage targets, and directly

affect his confidence in and willingness to carry the SRAW in combat.

The prototype SRAW launcher is shown in Figure 8.1. Launcher human factors

issues to be resolved include:

e The sling quick release mechanism. Must be comfortable during transport and allow

rapid and unencumbered change from carry position to fire position.

e The shoulder stop. Must fit 5th to 95th percentile Marines using cold weather gear,

flak jacket, etc.

e The front grip. Location and type must be appropriate for transport and firing. It

must not snag on obstacles or equipment.

e Night sight compatibility. The SRAW with rifle-mounted night vision equipment must

be comfortable during use with protective gear under adverse conditions.

36

Page 44: April 22, 1996 - Virginia Tech

e Trigger mechanism. Must provide safety and preclude inadvertent operation using

simple tasking to minimize gunner error.

e Controls must be clearly identifiable under adverse conditions (darkness, Arctic

weather gear, Nuclear, Biological, Chemical (NBC) protective gear)

e Optical Sight Design. Must provide the gunner with a visual image magnification

sufficient to identify targets at extreme ranges and a field of view sufficient to track

moving targets at short ranges under all environmental conditions.

The human factors related to the optical sight design will be discussed in greater detail.

A discussion of the human eye which will limit the system resolution, a review of previous

research on anti-tank sights which lead to a baseline requirement, and the results of human

factors verification testing of the baseline requirement will be presented on this one issue.

37

Page 45: April 22, 1996 - Virginia Tech

Sling

Trigger Assembly/ Energy Source

Shock Isolator

Sight Assembly (>

Handle Sv 4

Shoulder Stop

Launch Tube

Shock Isolator

Closure

FIGURE 8.1 - PROTOTYPE LAUNCHER DESIGN

38

Page 46: April 22, 1996 - Virginia Tech

8.2 HUMAN VISUAL SYSTEM

The SRAW optical sight requirements are dependent on and limited by the human

visual system. The human eye and its photoreceptors transmit visual information to the

brain via the optic nerve. This is accomplished through the absorption of photons in

photopigments (rods and cones) of the retina. Incoming light passes through the cornea

into a clear liquid called the aqueous humor. The adjustable diameter iris acts as a variable

lens stop and allows the eye to regulate the intensity of light entering the lens. The lens

focal length is adjusted by the ciliary muscle to focus an image on the retina. The cavity

behind the lens is filled with a substance called the vitreous humor. The eye thus has four

media of refraction: cornea, aqueous humor, lens, and vitreous humor. Refraction occurs

at four interfaces: air-cornea, cornea-aqueous humor, aqueous humor-lens, and lens-

vitreous humor. The image formed on the retina is upside down and mirror reversed, but

the brain learns to compensate for this early in life.

The light photons falling on the retina excite rods and cones. The cones are

concentrated in the center of the retina in a region called the fovea. The cones are color-

sensitive, but require higher illumination (daylight conditions) than the rods which are used

for nighttime conditions. Vision predominated by the cones is known as photopic vision.

Since the SRAW sight assembly will only be required to function under daylight

conditions, the image formed on the retina should be centered on the fovea for maximum

resolution or acuity.

The eye is sensitive to the visible portion of the electromagnetic spectrum from

about 400-700 nanometers. Visual sensitivity is not constant throughout the visible

spectrum. Sensitivity peaks from about 500-600 nanometers (green-yellow) and is

characterized by the photopic standard observer curves. The human visual system

requires a minimum contrast ratio of 3:1 to distinguish objects. The contrast ratio is the

ratio of maximum luminance (the total perceived energy emitted from a surface) to the

minimum luminance. The contrast ratio becomes important, for example, in trying to

39

Page 47: April 22, 1996 - Virginia Tech

distinguish a olive-drab green tank from a forest green background. The human eye is

sensitive to luminance changes over a range of 10’° an is able to detect as few as 10 to 20

photons in the most sensitive wavelengths of the visible spectrum (green-yellow). The

detection threshold intensity for cone vision is 3.2 candela/meter’.

8.3 PREVIOUS HUMAN FACTORS RESEARCH ON LIGHT ANTITANK WEAPONS

OPTICAL SIGHTS

Available data on antitank weapon sights is limited, but sufficient to provide some

direction. Evaluation of the M72 Light Antitank Weapon (LAW) revealed shortcomings

in the reticle design’. The LAW reticle featured stadia lines to assist with range estimation

and velocity. The LAW reticle pattern described is presented in Figure 8.2.4 LAW

gunners were highly tasked, being asked to compensate for target range, orientation, and

velocity, hence the complicated reticle with stadia lines. Less than predicted hit

probabilities documented during infantry training and Vietnam prompted a review of

training methods. This resulted in a new engagement procedure.”

40

Page 48: April 22, 1996 - Virginia Tech

Front sight using the stacia lines for range estimation. When the tank is straddled by the stadia lines, the range is marked. Here the tank is at 200 metres

FIGURE 8.2 - LAW RETICLE PATTERN

In a previous study of light antitank weapon sights, ten candidate sights were

evaluated for a prototype LAW replacement. Nine range-finding sights utilizing stadia

lines and one post-and-peep (rifle) sight were evaluated against an M60 tank target. The

results of the experiment showed that none of the sights used provided much improvement

versus iron sights for gunners tasked with range estimation’.

The SRAW allocates the range, gravity, and target velocity compensation to the

missile, simplifying the gunner’s task. The gunner is tasked only to acquire, identify, and

track the target. The gunner only needs to grossly determine if the tank is within the

600m range. Based on previous work, this task is appropriate to iron sights. As a result,

a simple vertical/horizontal crosshair reticle pattern is utilized in the SRAW prototype

system.

41

Page 49: April 22, 1996 - Virginia Tech

Regarding magnification and field of view (FOV), a maximum magnification of

4X for rifle scopes is recommended’. Other authors recommend 1-1.5 X for aircraft-sized

targets at less than 1000 meter range®. No quantitative guidance is given regarding field

of view requirements, merely that the field of view be compatible with the intended use.

Magnification and field of view require tradeoffs for a given objective diameter.

Increased magnification results in decreased field of view, unless the size of the optics is

increased as well. Also, the amount of light transmitted decreases with increased

magnification, making a high magnification scope less suited to low ambient light

conditions. Light transmission can be improved by increased optical quality, resulting in

higher cost. The 20.0 pound system weight budget and the $10,000/unit production cost

goal of the SRAW program limits both size (weight) and optical quality. To

accommodate these limits, a one inch objective diameter was selected and a 0.5 pound

sight weight limit was set. For the one inch diameter objective, a diffraction limit can be

calculated as 6Qmin = 1.22 A/lens diameter, where 6Q;in is the minimum angular separation

that can be resolved, 4 is the wavelength of light (using 550 nanometers), and d is the lens

diameter 0.0254 m (1 inch).’ The minimum angular separation is 26.45 j1rad, much less

than the 290 pirad the human eye is capable of resolving. At 600 m, this minimum angular

separation amounts to 1.58 centimeters which is more than sufficient to identify tank sized

targets. Using this as a rough check, the lens diameter allocated should be suitable even

with 50% light transmission.

The disposable launcher concept also limits the optical quality (price) available.

Other disposable light antitank weapons, notably the LAW and the AT4 do not employ a

magnifying scope, i.e., their magnification is unity. A requirement of 3.5X with a 6 degree

FOV was imposed on the Shoulder-launched Multi-Purpose Assault Weapon (SMAW),

but this system utilized a reusable launcher with expensive optics. The SMAW was

designed for use against smaller bunker targets with an operational range of 750 meters.

The SRAW will engage tank-sized targets at 600 meters, but will also be required to

engage moving targets. Three gunner tasks detailed in the SRAW operational flow

42

Page 50: April 22, 1996 - Virginia Tech

diagrams are dependent upon the optical sight: acquiring the target within the optical

sight picture; identifying the target; and tracking moving/stationary targets. These gunner

tasks drive the sight requirements. Top level sight design requirements are the sight

magnification, field of view, and reticle pattern. Based on the previous research, a baseline

requirement of 2.5 X minimum magnification, 6 degree FOV, and a simple, cross-hair

reticle was written into the SRAW Prime Item Development Specification.

8.4 SRAW OPTICAL SIGHT HUMAN FACTORS REQUIREMENTS VERIFICATION

The delivery of a prototype launcher provided the SRAW program with a cost-

effective opportunity to verify the top level launcher requirements in the field and if

necessary, influence the design early in the life cycle. Four commercially available,

affordable ($50-100 retail price), 1-inch diameter design configurations were identified.

The test objective was to determine the combination of lens magnification and field of

view which provides the user with maximum ability to acquire, identify, and track moving

and stationary targets throughout the SRAW operational range. Table 4 presents the

optical sight configurations tested.

TABLE 4 - OPTICAL SIGHT TEST CONFIGURATIONS

SIGHT CONFIGURATION MAGNIFICATION | FIELD OF VIEW (FOV)

A 1.75 X 14° FOV

B 2.5 X 4.8° FOV

C 2.5 X 9° FOV

D 4.0 X 7? FOV

43

Page 51: April 22, 1996 - Virginia Tech

8.4.1 Test Procedure

Individual evaluation by prospective user (Marine).

Evaluate each scope configuration versus tank-size stationary targets.

Ranges: 17m; 100m; 250m; 600m

Evaluate each scope configuration versus tank-size moving target.

Ranges: 17m; 100m; 250 meters

Survey user response.

Stationary target ranges selected were: 17m (minimum range), 250m (typical

engagement), and 600m (maximum range). Likewise moving target ranges selected were:

17m (minimum range) and 250m (maximum range). Discussions with the SRAW

software/Guidance and Control (G&C) engineers, revealed that targets located at 100m

were most demanding upon the G&C system. As a result, the 100m test range was added

to both moving and stationary targets.

A temporary test range was established at NSWCDD along blacktop roads. A

laser rangefinder was used to mark accurate gunner firing positions. Four SRAW

prototype launchers, each equipped with one (1) of the Table 4 sight configurations were

available. A tank was not available, so a USMC Light Armored Vehicle, LAV-25 (77H x

8°’ W x 22’ L) was used as a representative target with no loss of validity. Figure 8.3

shows the LAV frontal and side aspects.

FIGURE 8.3 LAV-25 FRONTAL AND SIDE VIEW

44

Page 52: April 22, 1996 - Virginia Tech

Five US Marines with anti-tank weapon experience participated in this evaluation.

System Experience: LAW (4), AT4 (4), DRAGON (4), and TOW (2). Each participant

was asked to evaluate each optical sight configuration against the moving and stationary

targets at the ranges identified in Table 5. Note that only four gunners participated in the

moving target scenarios to save time.

TABLE 5 - TEST SCENARIOS

RANGE Stationary Side Stationary Frontal Moving, Crossing

(meters) View (SS) View (SF) Target (MC) 25km/hr

17 x xX x

100 xX xX xX 250 x x x 600 x x

The test participants employed the most difficult firing position, free standing,

unsupported. Each participant was given as much time as needed, was allowed to

evaluate the launcher configurations in any order, and was allowed to evaluate any given

configuration as many times as necessary.

The participants were instructed on the test objectives and were instructed to

concentrate upon the optical sight picture only. Variations in scope quality/position was

not to influence their evaluation. Strict instructions not to discuss opinions and

observations amongst themselves were also in force. After each test scenario, each

Marine met individually with a data collector and completed a questionnaire, included as

Figure 8.4. The group of test participants was debriefed at the conclusion of the test.

They were encouraged to speak freely and offer any and all comments they might want to

make.

45

Page 53: April 22, 1996 - Virginia Tech

FIGURE 8.4 - QUESTIONNAIRE

Experience with other anti-tank systems. (Check all that apply)

LAW . DRAGON AT4 SMAW

OTHER (Please specify):

CONSIDERING ONLY THE SCOPE MAGNIFICATION AND FIELD OF VIEW (i.e.,

your sight picture), PLEASE ANSWER THE FOLLOWING.

RANGE: Moving/Stationary (Circle One)

I. Ability to acquire and track target.

Preferred Configuration:

Unacceptable Configuration(s):

(Why?)

I. Ability to identify target.

Unacceptable Configuration(s):

(Why?)

POST-TEST SUMMARY

Overall, I felt FIELD OF VIEW/MAGNIFICATION to be more important. (Circle One).

Comments:

46

Page 54: April 22, 1996 - Virginia Tech

8.4.2 Test Results

The individual data are summarized in Table 6. A bar graph, Figure 8.5, illustrates

gunner preferences during the stationary side view testing. These preferences are the

gunner’s opinion of which configuration (A-D) presented the best optical sight picture for

a given range and target orientation. Note that some gunners preferred two

configurations during stationary side view testing. Hence the 0.5 split for these

configurations. Configuration C was clearly preferred throughout the testing. The Table

6 data shows the gunners unanimously preferred Configuration C for the stationary frontal

testing and the moving testing. Three of five gunners felt the 1.75 magnification of

configuration A was insufficient to identify (friend or foe) targets at 600 meters. The small

FOV of configuration B and D was unacceptable to these gunners. The high

magnification of configuration D was unacceptable for short range targets.

47

Page 55: April 22, 1996 - Virginia Tech

TABLE 6 - DATA SUMMARY

Stationary Target (Side View) Preferred Scope Configuration

Range A B "' C D Unacceptable Configurations: Comments

17m 1 3 2B:b, 3D:a,b

100m 1 3 1B:b, 4D:a

250m 0.5 * 4.5 * 1A:c, 1B:b, 3D:b(2)

600m 1 4 1A:c,d 1B:b

Stationary Target (Front View) Preferred Scope Configuration

Range A B C D Unacceptable

Configurations: Comments

17m 0.5 * 3.5 * 3D:a(2),b

100m 5 ID

250m 5 1B, 1D

600m 4 1 3A:c,d(2), 2B, 1C

Moving Target (Crossing) Preferred Scope Configuration

Range A B C D Unacceptable

Configurations: Comments

17m 4 1A,1B,2D 100m 4 2B:b(2)

250m 4 3B:b(2),1D

Notes: *: at least one participant rated B & C equally, and a value of 0.5 was assigned to each. 2 Reasons for unacceptable ratings:

a: magnification too great b: FOV too narrow

c: identification would be difficult, though not impossible d: magnification too low

Key: Number of Participants/Configuration: Reason for Unsat (# of times cited)

Example 1 2B:b(2) --> 2 Marines regarded Configuration B unacceptable,

both cited narrow FOV as the reason.

Example 2 3D:a,b --> 3 Marines regarded Configuration D unacceptable,

1 Marine cited magnification as too great; 1 Marine cited FOV too

narrow; 1 Marine did not provide a comment.

48

Page 56: April 22, 1996 - Virginia Tech

Figure 8.5 - Number Of Gunners Preferring Each Configuration

(Stationary Side View)

8.4.3 Verification Testing Debrief Summary

Participants agreed that a good combination of FOV/magnification was more

important than a single characteristic. The participants liked the wide angle 14° FOV at

short ranges. A 2.5 X scope was felt to be the minimum necessary for positive visual

identification at 600m. Ideally, the Marines would have chosen a 2.5 X scope with a 14°

FOV. While possible, this would likely be a very large and expensive scope unsuitable to

the requirements. The preferred test configuration C, was 2.5 X, 9° FOV. No negative

comments on the reticle pattern were offered by the participants.

8.4.4 Verifications Test Conclusions and Recommendations

The verification testing illustrates one iteration of the system development process.

The current 6° FOV specified in the SRAW Prime Item Development Specifications was

judged inadequate. A 2.5 X scope with a 9° FOV and simple reticle pattern was preferred

49

Page 57: April 22, 1996 - Virginia Tech

by the survey participants. The SRAW Prime Item Development Specifications should be

changed to reflect a 9° FOV. The other baseline optical sight characteristics were

acceptable to the participants. This requirement change will improve the effectiveness of

the SRAW gunner, especially at close range.

9.0 CONCLUSIONS

The top-level system requirements for SRAW are based on a 1950’s era systems

engineering study. The mission requirements and deployment doctrine are inadequate.

The systems engineering approach applied to the SRAW system revealed a design capable

of meeting the stated USMC needs. The SRAW requirements have been allocated

appropriately to the system reliability, weight, and fiscal constraints. The Life Cycle Cost

analysis illustrates the benefits of the reduced operating costs associated with maintenance

and spare parts inventory. Application of the systems engineering process to the optical

sight resulted in improved performance within constraints prior to the FY98 production

cost ramp-up. Other SRAW human factors issues need to be examined in the same detail.

10.0 RECOMMENDATIONS FOR FURTHER STUDY

A complete human factors evaluation of the launcher should be completed as soon

as possible studying man-portability and confirming ease of use for the Sth to 95th

percentile gunners in protective clothing. The USMC top level anti-tank organization,

doctrine, and tactics first allocated in the 1950’s should be reviewed with a view toward

the changed threat and technology levels. Significant improvements could result from a

willingness to reexamine the paradigm of organizing infantry anti-tank assets into light,

medium, and heavy systems.

50

Page 58: April 22, 1996 - Virginia Tech

Additional human factors testing with one inch diameter, 2.5 X scopes should be

conducted to determine an optimal field of view for this application. Testing 6, 9, 12, 15,

and 18 degree FOVs is recommended as a staring point. Testing should ideally employ

simulators to confirm and quantify the relationship between gunner preference and gunner

accuracy. The low light limits for the optical daysight should be studied further and

incorporated into the gunner training manual as guidance for when to switch to the night

sight. Human factors testing on the SRAW to nightsight interface should be conducted.

The operator and maintenance functions derived from the functional analysis should be

verified and expanded with a detailed operator task analysis. The SRAW System should

be continually reviewed throughout the life cycle for areas where evolving technology,

changing threats, or procurement reform could impact acquisition cost.

51

Page 59: April 22, 1996 - Virginia Tech

REFERENCES

' Moskin, J. Robert, The USMC Story, 3rd. ed., (New York, NY: Little, Brown

and Company 1992), p. 445.

? Ibid., p. 773.

* D.J Giodano, Gunner Errors When Using the M72A2 LAW Sight TM-19/75. (Aberdeen, MD: US Army Human Engineering Laboratory [August 1975]), p. 3-5.

* J. Weeks, ed., Jane’s Infantry Weapons, 6th edition, (London, UK: Jane’s

Publishing Co., 1981), p. 546

°D.J Giodano, Simplified Procedures for Engaging Moving Targets with the M72A2 LAW TM-28/76. (Aberdeen, MD: US Army Human Engineering Laboratory

[Nov 1976]), p. 19.

° D.J Giodano_ Sights for Light Antitank Weapons TM-11/76. (Aberdeen, MD: US Army Human Engineering Laboratory [April 1976]), p. 121.

”U.S. Department of Defense, MIL-HDBK-759A - Handbook for Human

Engineering Design Guidelines (Washington, DC: 30 June 1981), p. 7-47.

® W.E. Woodson, Human Factors Design Handbook. (New York, NY: McGraw-

Hill Book Co., 1981), p. 556.

” J. B. Marion and W. F. Hornyak, Physics for Science and Engineering. (New York, NY: Saunders College Publishing (1982), p. 1145.

52

Page 60: April 22, 1996 - Virginia Tech

SELECTED BIBLIOGRAPHY

Blanchard, B. S. and Fabrycky, W. J. Systems Engineering and Analysis, 2nd ed.

New York, NY: Prentice Hall, 1990.

Cartereete, E. and Friedman, M., eds., Handbook of Perception Volume V - Seeing. New York, NY: Academic Press, Inc., 1975.

Giodano, D. J., Gunner Errors When Using the M72A2 LAW Sight TM-19/75.

Aberdeen, MD: US Army Human Engineering Laboratory [August 1975].

Giodano, D. J., Sights for Light Antitank Weapons TM-11/76.

Aberdeen, MD: US Army Human Engineering Laboratory [April 1976].

Giodano, D. J., Simplified Procedures for Engaging Moving Targets with the M72A2

LAW TM-28/76. Aberdeen, MD: US Army Human Engineering Laboratory [April 1976].

Kennedy, D. R., History of the Shaped Charge Effect, the First 100 Years,

Mountain View, CA: D.R. Kennedy & Associates, Inc., 1988.

Korchunoff, K., “Initial Human Engineering Test Report”, prepared under contract

N60921-94-C-A132, Rancho Santa Margarita, CA: Loral Aeronutronic, 6 July

1995.

Marion, J. B. and Hornyak W.F., Physics for Science and Engineering.

New York, NY: Saunders College Publishing , 1982.

Moskin, J. Robert, The USMC Story, 3rd. ed.,

New York, NY: Little, Brown and Company 1992.

Spillman, L. and Werner, J., eds., Visual Perception: The Neurophysiological —

Foundations, New York, NY Academic Press, 1990.

Tortora, G. and Anagnostakos, N., Principles of Anatomy and Physiology, 5th ed.

New York, NY: Harper & Row, 1987.

Walters, W. P. and Zukas, J. A., Fundamentals of Shaped Charges, New York, NY: John Wiley & Sons, Inc., 1989.

Weeks, J., Ed., Jane’s Infantry Weapons, 6th edition, London Jane’s Publishing Co., 1981.

53

Page 61: April 22, 1996 - Virginia Tech

Woodson, W.E., Human Factors Design Handbook, New York, NY: McGraw-Hill, 1981.

SRAW Prime Item Development Specification (PIDS), WS-33126, Rev A, 8 Feb 94.

MIL-STD-210C, Climatic Information to Determine Design and Test Requirements for Military Systems and Equipment. |

MIL-STD-810, Environmental Test Methods.

MIL-HDBK-759A - Handbook for Human Engineering Design Guidelines

MTD TOP 3-2-045, US Army Test and Evaluation Command, Test Operations Procedure, “Automatic Weapons, Machine Guns, Hand and Shoulder Weapons”.