Application of R.C.M. type Maintenance Methodology within Eskom Distribution. Presenter: Peter Busch. Background Eskom The Company. At 31 March 2005 : Nominal capacity – 42 011 MW Power lines (all voltages) – 347 204 km Coal burnt – 136,4 Mt Revenue (Company) – R41 387m - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Application of R.C.M. type Application of R.C.M. type

Maintenance Methodology within Maintenance Methodology within

Eskom DistributionEskom Distribution

Presenter: Peter Busch

Page 2: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Background Eskom The Company

At 31 March 2005:• Nominal capacity – 42 011 MW

• Power lines (all voltages) – 347 204 km

• Coal burnt – 136,4 Mt

• Revenue (Company) – R41 387m

• Total sales – 256 959 GWh

• Sales to countries in southern Africa (Transmission and Distribution) – 16 008 GWh

• Peak demand on integrated system – 34 195 MW

• Total assets (Company) – R104 994 million

• Employees – 29 845

• Customers – 3 603 943

Page 3: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

International Comparisons

Company    Sales RatingCountry   TWh by sales

RAO-UES Russia 636 1EDF France 473 2E.On. Germany 404 3

KEPCO South Korea 294 4TEPCO Japan 281 5RWE Energie AG Germany 230 6Eskom South Africa 206 7Vattenfall Sweden 186 8Eletrobras Brazil 178 9Hydro Quebec Canada 169 10Taiwan Power (TaiPower) Taiwan 159 11Enel Italy 156 12TVA USA 155 13Kansai Electric Power Co. Japan 142 14Electrabel Belgium 137 15Endesa Spain 134 16Chubu Japan 123 17AEP USA 118 18AES USA 108 19FPL USA 103 20

Page 4: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

International Comparisons

 

Generation capacityMW

Rating by capacityCompany Country

RAO-UES Russia 156 600 1 

EDF France 122 600 2 

Tepco Electric Power Co Japan 62 660 3 

E.On Germany 54 000 4 

KEPCO Korea 50 432 5 

Enel Italy 47 000 6 

AES USA 46 000 7 

RWE Energie AG Germany 45 000 8 

Endea Spain 43 000 9 

Eletrobas Brazil 40 854 10 

Eskom South Africa 39 810 11 

Southern USA 39 000 12 

Duke USA 38 748 13 

Exelon USA 38 000 14 

AEP USA 36 000 15 

Kansai Electric Japan 35 434 16 

Hydro Quebec Canada 34 000 17 

Taiwan Power (TaiPower) Taiwan 33 290 18 

TVA USA 33 189 19 

Vattenfall Sweden 33 000 20  

 Source: Data Monitor UK 2004 figures

Page 5: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Background Eskom The Company

• Eskom is Africa’s largest Electricity Utility generating 60% of Africa’s electricity. It has 5 divisions, which are the following: Generation, Transmission, Distribution, Eskom Enterprises and Corporate.

• Eskom Distribution is divided into 6 Regions covering all of geographic South Africa. Each Region is divided into a number of geographic areas where area staff makes use of a computerised maintenance management system to implement maintenance strategies. Within Eskom there is a lot of staff movement at this level and therefore a skill shortage as well as experience is in short supply.

Page 6: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Background Eskom The Company

• Within Eskom Distribution there are approximately 4000 High Voltage Substations from 132kV to 33 kV spread around South Africa. The Substations contain approximately 4500 Power Transformers with 99 different makes and types of Tap Switches. 45000 Circuit Breakers of 400 different makes and types. 10500 M.V and H.V. lines. Eight different voltage categories are used from 132kV down to 3,3kV.

Page 7: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

The Maintenance Hierarchy within Eskom Distribution

National Maintenance Policy for electricity networks NRS 082. NRS 082 (1.1) 10 02 2005.doc used by the N.E.R.

• Eskom maintenance policy. maintenance policy.pdf

• Eskom Maintenance planning directive.• Eskom Distribution Standards per equipment type.

Standard for maintenance of circuit breakers.pdf• Eskom Job Plans per maintenance intervention per

Make and Type of equipment.• Eskom Work Instructions per maintenance

intervention per Make and Type of equipment.

Page 8: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Maintainable Equipment

• Equipment complexity.– Equipment completely automated, Under fault conditions equipment has to be removed from

the fault within less than 100 milliseconds normally within 35 milliseconds.

– Equipment loadings and switching control centralized.

• Decentralization of equipment around the country.– H.V. Substations approximately 4000– Power Transformers 1MVA and above approximately 4500 There are 99 different makes and types of tap changers.– H.V. Circuit Breakers approximately 45000. There are 400 different makes and types of H.V. circuit

breakers which employ 4 different rupturing mediums and 5 different energy sources drive the mechanisms.

– M.V. and H.V. Lines approximately 10500– Etc.

Page 9: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Issues around skilled staff in the Industry

Skill shortage experienced.• New labour entrants need experience.• Skilled staff centralized within regional

offices as well as national offices.• Complex equipment de-centralized.• Technical Service Groups centralized

regionally as well as nationally.

Page 10: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

What strategy to follow

A pure RCM pilot study was done at Brackpan North, a Substation to the East of Johannesburg.

• Costing of various solution.• Decision on maintenance strategy

solution.• A modified “RCM” type study to be

implemented.

Page 11: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Equipment and work group format

Equipment divided into groups of expertise ie. Transformers, Circuit Breakers, Cables, D.C. Batteries, Low Voltage etc.

• Centralized modified “R.C.M.” studies done.

• Regional representation on Work group.

• National specialists on Work group.

Page 12: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Requirements for easy to use Software

The software package should be user friendly.

• R.C.M. knowledge by the user not required.

• Experience not required by user.

• Applicable to all Geographic areas.

• Applicable to all network requirements.

• Applicable to all customer loads.

Page 13: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Software Package

Market was investigated for suitable software.

• All maintenance planners have Microsoft office suite.

• Written in Microsoft Access.• Results of work group studies populate

tables.• Queries run on tables returning

maintenance strategies depending on the options of the maintenance planner.

Page 14: Application of R.C.M. type Maintenance Methodology within Eskom Distribution

Transformer study

• Transformer FMEA studies. PowerTrfr RCM Template(Prelim Findings).xls• Transformer RCM decision diagram. Decision work sheet.xls• Criticality scores. Criticality Analyses Questionaire.xls• Dissolved Gas analysis. DGA cost analysis for Transformers.xls• Software DDMMT SOFTWARE.mdb• Software Demonstration and Training Tool• DT Maintenance management tool_30_01_2007.E