application index - infrastructure.planninginspectorate.gov.uk · plans/drawings detailed plans...
TRANSCRIPT
The Rail Central Rail Freight Interchange and Highway Order 201[x]
Application Index
PINS Reference Number:TR050004Document Reference: 1.1 Regulation Number: Reg 5(2)(q)
September 2018Version 1.0
Planning Act 2008 | Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
TR050004
Category (use drop down list) Document type (use drop down
list)
Plain English Description Date Author
Application Form Other Application Index 26.10.18 Turley
Application Form Other Cover letter to PINS 26.10.18 Womble Bond
Dickinson
Application Form Form Application Form 26.10.18 Womble Bond
Dickinson
Application Form Other Schedule of Rail Central Development Consent Order
Submission Documents
26.10.18 Turley
Application Form Other Guide to the Rail Central Development Consent Order 26.10.18 Turley
Application Form Newspaper Notices Copies of newspaper notices & section 48 notices 26.10.18 Camargue
Application Form Other Amendments to the Resubmitted DCO Application 26.10.18 Turley 1.7 Amends to DCO Application.pdf
Plans/Drawings General Site Plans (Part 23) Location plan (Key Plan) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Key Plan) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 1 of 5) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 2 of 5) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 3 of 5) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 4 of 5) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Main Site Sheet 5 of 5) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (J15a) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan Cycleway on Towcester (Sheet 1 of 2) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan Cycleway on Towcester (Sheet 2 of 2) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan Cycleway on Barn Lane 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (A43 (south)/ Saint Johns Road (west)/ A43
(north)/ Saint Johns Road (east)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (A43 South/ Northampton Road/ A43 North) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (A43 and Tove Roundabout, Towcester
Bypass (southwest)/ Towcester Road/ A5, (north)/ A43,
(northeast)/ A5, Watling Street (southeast)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (Abthorpe Road and Abthorpe roundabout/ A43,
Towcester Bypass (north)/ Brackley Road/ A43,
Towcester Bypass (south)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (A5076, Upton Way (south)/ Telford Way/ A5076,
Upton Way (north)/ Water Tull Way/ Duston Mill
Lane)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (A5076, Upton Way (south)/ High Street/
A5076, Upton Way (north)/ Duston Mill)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan (A5076/ A5123/ Upton Way Roundabout
(Pineham Park) (Danes Camp Way)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan A5076 (West)/ Hunsbury Hill Avenue/ Hunsbarrow
Road/ A5076, Danes Camp Way/ Hunsbury
Hill Road
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Land Plan Towcester Road/ A5076, Danes Camp Way/ A5123,
Towcester Road/ Mere Way/ Tesco Access
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – Key Plan 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – 1 of 3 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – 2 of 3 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Ecological Mitigation Plan – 3 of 3 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) J15A Ecological Mitigation Plan 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site & Highways) (Key Plan) 26.10.18 Terra Quest
RC-ALG-PLN-2.2–W21
RC-ALG-PLN-2.2–W22
RC-ALG-PLN-2.2–W23
RC-ALG-PLN-2.2–W24
RC-ALG-PLN-2.2–W25
RC-ALG-PLN-2.2-W26
Plans
Plans
Plans
Plans
RC-ALG-PLN-2.3.0
RC-ALG-PLN-2.3.1
RC-ALG-PLN-2.3.2
RC-ALG-PLN-2.3.3
RC-ALG-PLN-2.3.4
RC-ALG-PLN-2.4
Plans
Plans
Plans
Plans
RC-ALG-PLN-2.2-MS.2
RC-ALG-PLN-2.2-MS.3
RC-ALG-PLN-2.2-MS.4
RC-ALG-PLN-2.2-MS.5
1.7
RC-ALG-PLN-2.2-W10
Plans
Plans
RC-ALG-PLN-2.2-W17A.1
RC-ALG-PLN-2.2–W17A.2
RC-ALG-PLN-2.2–W17B
RC-ALG-PLN-2.2–W18
RC-ALG-PLN-2.2–W19
RC-ALG-PLN-2.2–W20
Plans
Plans
Plans
2.2.Land Plan KP.pdf
2.2-MS.1. Land Plan MS 1 of 5.pdf
Application Form
Application Form
Application Form
Application Form
Plans
Plans
Plans
Application Form
Ref or drawing number
1.1
1.2
Folder
Application Form
Application Form
1.3
1.4
1.5
1.6
RC-ALG-PLN-2.1
RC-ALG-PLN-2.2
RC-ALG-PLN-2.2-MS.1
2.2-W17B. Land Plan Cycleway Barn
Lane.pdf2.2-W18. Land Plan A43 St Johns Rd.pdf
2.2-W19. Land Plan A43 and Northampton
Road.pdf2.2-W20. Land Plan A43 and Tove
Roundabout.pdf
2.2-W21. Land Plan Abthorpe Road.pdf
Plans
Plans
Plans
2.2-MS.2. Land Plan MS 2 of 5.pdf
2.2-MS.3. Land Plan MS 3 of 5.pdf
2.2-MS.4. Land Plan MS 4 of 5.pdf
2.2-MS.5. Land Plan MS 5 of 5.pdf
2.2-W10. Land Plan J15a.pdf
2.2-W17A.1. Land Plan Cycleway Towcester
1 of 2.pdf
Plans
Plans
Plans
Planning Inspectorate Electronic Application Index
Please use a new line for each document - drop down lists in columns category and document type need to be selected
from the drop down lists only.
Planning Inspectorate Application
Reference Number:
Filename
1.1.Application Index.pdf
1.2.Covering letter.pdf
1.3.Application Form.pdf
1.4.Schedule of RC DCO Submission
Docs.pdf
1.5 Guide to the RC DCO.pdf
1.6.Newspaper Notices and Section 48
Notices.pdf
2.1. Location Plan KP.pdf
2.3.1. EMP 1 of 3.pdf
2.3.2. EMP 2 of 3.pdf
2.3.3. EMP 3 of 3.pdf
2.3.4. J15A EMP.pdf
2.4. Works Plan Key Plan.pdf
Plans
Plans
2.2-W22. Land Plan A5076 Upton Way
Telford Way.pdf
2.2-W23. Land Plan A5076 Upton Way High
Street.pdf
2.2-W24. Land Plan A5076 A5123.pdf
2.2-W25. Land Plan A5076 Hunsbury Hill
Ave.pdf
2.2-W26. Land Plan Towcester Road
A5076.pdf
2.3.0. EMP Key Plan.pdf
Plans
Plans
2.2-W17A.2. Land Plan Cycleway Towcester
2
Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 1 of 4) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 2 of 4) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 3 of 4) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Main Site Sheet 4 of 4) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (J15a) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Cycleway on Towcester Sheet 1 of 2) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Cycleway on Towcester Sheet 2 of 2) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Cycleway on Barn Lane) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (A43 (south)/ Saint Johns Road (west)/ A43
(north)/ Saint Johns Road (east)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (A43 South/ Northampton Road/ A43 North) 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (A43 and Tove Roundabout, Towcester Bypass
(southwest)/ Towcester Road/ A5, (north)/ A43,
(northeast)/ A5, Watling Street (southeast)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (Abthorpe Road and Abthorpe roundabout/ A43,
Towcester Bypass (north)/ Brackley Road/ A43,
Towcester Bypass (south)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (A5076, Upton Way (south)/ Telford Way/ A5076,
Upton Way (north)/ Water Tull Way/ Duston Mill
Lane)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (A5076, Upton Way (south)/ High Street/
A5076, Upton Way (north)/ Duston Mill)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan (A5076/ A5123/ Upton Way Roundabout
(Pineham Park) (Danes Camp Way)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan A5076 (West)/ Hunsbury Hill Avenue/
Hunsbarrow Road/ A5076, Danes Camp Way/ Hunsbury Hill Road
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Works Plan Towcester Road/ A5076, Danes Camp Way/ A5123,
Towcester Road/ Mere Way/ Tesco Access
26.10.18 Terra Quest
Plans/Drawings Detailed Plans (Part 23) Access to works plan (Key Plan) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 1 of 3) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 2 of 3) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Access to works plan (Main Site Sheet 3 of 3) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up (Key Plan) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up
(Sheet 1 of 4)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to bestopped up
(Sheet 2 of 4)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up
(Sheet 3 of 4)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Plan showing public rights of way to be stopped up
(Sheet 4 of 4)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Streets Works Plans – Stopping up of the Highway (Key
Plan)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Streets Works Plans – Stopping up of the Highway
(Sheet 1 of 2)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Streets Works Plans – Stopping up of the Highway
(Sheet 2 of 2)
26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Highway Classification Plan ( Key Plan) 26.10.18 TPA 2.8.0. HCP Key Plan.pdfRC-ALG-PLN-2.8.0 Plans
2.6.1. PROW 1 of 4.pdf
2.6.2. PROW 2 of 4.pdf
RC-ALG-PLN-2.6.3 Plans 2.6.3. PROW 3 of 4.pdf
RC-ALG-PLN-2.6.4 Plans 2.6.4. PROW 4 of 4.pdf
RC-ALG-PLN-2.7.0 Plans 2.7.0. Street Works Plans Key Plan.pdf
RC-ALG-PLN-2.7.1 Plans 2.7.1. Street Works Plans 1 of 2.pdf
RC-ALG-PLN-2.7.2 Plans 2.7.2. Street Works Plan 2 of 2.pdf
RC-ALG-PLN-2.6.2 Plans
RC-ALG-PLN-2.6.1 Plans
2.4-W25. Works Plan A5076 Hunsbury Hill
Ave.pdf
2.4-W26. Works Plan Towcester Road
A5076.pdf
RC-ALG-PLN-2.5.0 Plans 2.5.0. ATWP Key Plan.pdf
RC-ALG-PLN-2.5.1 Plans 2.5.1. ATWP Main Site 1 of 3.pdf
RC-ALG-PLN-2.5.2 Plans 2.5.2. ATWP Main Site 2 of 3.pdf
RC-ALG-PLN-2.5.3 Plans 2.5.3. ATWP Main Site 3 of 3.pdf
RC-ALG-PLN-2.6.0 Plans 2.6.0. PROW Key Plan.pdf
RC-ALG-PLN-2.4–W26 Plans
RC-ALG-PLN-2.4–W25 Plans
2.4-W18. Works Plan A43 Saint Johns
Rd.pdf
2.4-W19. Works Plan A43 Northampton
Rd.pdf
RC-ALG-PLN-2.4–W20 Plans 2.4-W20. Works Plan A43 and Tove
Roundabout.pdf
RC-ALG-PLN-2.4–W21 Plans 2.4-W21. Works Plan Abthorpe Rd and
Abthorpe Roundabout.pdf
RC-ALG-PLN-2.4–W22 Plans 2.4-W22. Works Plan A5076 Upton Way
Telford Way.pdf
RC-ALG-PLN-2.4–W23 Plans 2.4-W23. Works Plan A5076 Upton Way
High Street.pdf
RC-ALG-PLN-2.4–W24 Plans 2.4-W24. Works Plan A5076 A5123.pdf
RC-ALG-PLN-2.4–W19 Plans
RC-ALG-PLN-2.4–W18 Plans
RC-ALG-PLN-2.4-MS.1
RC-ALG-PLN-2.4-MS.2 Plans
2.4-MS.3. Works Plan Main Site 3 of 4.pdf
RC-ALG-PLN-2.4-MS.4 Plans 2.4-MS.4. Works Plan Main Site 4 of 4.pdf
RC-ALG-PLN-2.4–W10 Plans 2.4-W10. Works Plan J15a.pdf
RC-ALG-PLN-2.4-W17A.1 Plans 2.4-W17A.1. Works Plan Cycleway on
Towcester 1 of 2.pdf
RC-ALG-PLN-2.4-W17A.2 Plans 2.4-W17A.2. Works Plan Cycleway on
Towcester 2 of 2.pdf
RC-ALG-PLN-2.4–W17B Plans 2.4-W17B. Works Plan Cycleway on Barn
Lane.pdf
RC-ALG-PLN-2.4-MS.3 Plans
Plans
2.4-MS.2. Works Plan Main Site 2 of 4.pdf
2.4-MS.1. Works Plan Main Site 1 of 4.pdf
Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 1 of 5) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 2 of 5) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 3 of 5) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 4 of 5) 26.10.18 TPA
Plans/Drawings Detailed Plans (Part 23) Highways Classification Plan (Sheet 5 of 5) 26.10.18 TPA
Plans/Drawings Plan showing statutory and non
statutory sites (Part 16)
Plan of statutory/non-statutory sites or features of nature
conservation
26.10.18 BCA
Plans/Drawings Plans showing statutory historic or
scheduled monument sites (Part 17)
Historic Environment Plan 26.10.18 Turley
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Key Plan) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 1 of 4) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 2 of 4) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 3 of 4) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Main Site Sheet 4 of 4) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (J15a) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Cycleway on Towcester) 26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A43 (south)/ Saint Johns Road
(west)/ A43 (north)/ Saint Johns Road (east)
26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A43 South/ Northampton Road/ A43
North)
26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A43 and Tove Roundabout, Towcester Bypass
(southwest)/ Towcester Road/ A5, (north)/ A43, (northeast)/ A5,
Watling Street (southeast)
26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (Abthorpe Road and Abthorpe
roundabout/ A43, Towcester Bypass (north)/ Brackley Road/ A43,
Towcester Bypass (south)
26.10.18 Terra Quest
Plans/Drawings Plan showing any crown land (Part 20) Crown Land Plan (A5076/ A5123/ Upton Way
Roundabout (Pineham Park) (Danes Camp Way)
26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Order Limits Key Plan 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 1 of 6 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 2 of 6 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 3 of 6 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 4 of 6 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 5 of 6 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Order Limits Plan Sheet - Sheet 6 of 6 26.10.18 Terra Quest
Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan - Key Plan 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 1 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 2 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 3 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Parameter Plan – Green Infrastructure Plan – 4 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Parameters Plan-A0-Sheet 1 of 2 26.10.18 Turley
Plans/Drawings General Site Plans (Part 23) Parameters Plan-A0 - Sheet 2 of 2 26.10.18 Turley
Plans/Drawings General Site Plans (Part 23) Site Context Plan – Key Plan 26.10.18 Turley
Plans/Drawings General Site Plans (Part 23) Site Context Plan Sheet 1 and 2 26.10.18 Turley
Plans/Drawings General Site Plans (Part 23) Site Context Plan – J15A 26.10.18 Turley
Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – Key Plan 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 1 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 2 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 3 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Illustrative Landscape Masterplan – 4 of 4 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Illustrative Colour Masterplan-A0 - Sheet 1 of 2 26.10.18 MSA
Plans/Drawings General Site Plans (Part 23) Illustrative Colour Masterplan-A0 - Sheet 2 of 2 26.10.18 MSA
RC-ALG-PLN-2.16.3 Plans 2.16.3. ILM 3 of 4.pdf
RC-ALG-PLN-2.16.4 Plans 2.16.4. ILM 4 of 4.pdf
RC-ALG-PLN-2.16.05 Plans 2.16.05. ICM A0 1 of 2.pdf
RC-ALG-PLN-2.16.06 Plans 2.16.06. ICM A0 2 of 2.pdf
RC-ALG-PLN-2.15.0 Plans 2.15.0. SCP Key Plan.pdf
RC-ALG-PLN-2.15.1 Plans 2.15.1. SCP Main Site.pdf
RC-ALG-PLN-2.15.2 Plans 2.15.2. SCP J15A.pdf
RC-ALG-PLN-2.16.0 Plans 2.16.0. ILM Key Plan.pdf
RC-ALG-PLN-2.16.1 Plans 2.16.1. ILM 1 of 4.pdf
RC-ALG-PLN-2.16.2 Plans 2.16.2. ILM 2 of 4.pdf
RC-ALG-PLN-2.13.1 Plans 2.13.1. Parameter Plan GIP 1 of 4.pdf
Plans 2.13.2. Parameter Plan GIP 2 of 4.pdf
RC-ALG-PLN-2.13.3 Plans 2.13.3. Parameter Plan GIP 3 of 4.pdf
RC-ALF-PLN-2.13.4 Plans 2.13.4. Parameter Plan GIP 4 of 4.pdf
RC-ALG-PLN-2.14.0 Plans 2.14.0. Parameters Plan 1 of 2.pdf
RC-ALG-PLN-2.14.1 Plans 2.14.1. Parameters Plan 2 of 2.pdf
RC-ALG-PLN-2.13.2
RC-ALG-PLN-2.12.1 Plans 2.12.1 OLP 1 of 6.pdf
2.12.2 OLP 2 of 6.pdf
RC-ALG-PLN-2.12.3 Plans 2.12.3 OLP 3 of 6.pdf
RC-ALG-PLN-2.12.4 Plans 2.12.4 OLP 4 of 6.pdf
RC-ALG-PLN-2.12.5 Plans 2.12.5 OLP 5 of 6.pdf
RC-ALG-PLN-2.12.6 Plans 2.12.6 OLP 6 of 6.pdf
RC-ALG-PLN-2.13 Plans 2.13. Parameter Plan GIP Key Plan.pdf
RC-ALG-PLN-2.12.2 Plans
RC-ALG-PLN-2.11–W17A Plans 2.11-W17A. CLP Cycleway.pdf
2.11-W18. CLP A43 St Johns Rd.pdf
RC-ALG-PLN-2.11–W19 Plans 2.11-W19. CLP A43 Northampton Rd.pdf
RC-ALG-PLN-2.11–W20 Plans 2.11-W20. CLP A43 Tove Roundabout.pdf
RC-ALG-PLN-2.11–W21 Plans 2.11-W21. CLP Abthorpe Rd Abthorpe
Roundabout.pdf
RC-ALG-PLN-2.11–W24 Plans 2.11-W24. CLP A5076 A5123.pdf
RC-ALG-PLN-2.12.0 Plans 2.12.0. OLP Key Plan.pdf
RC-ALG-PLN-2.11–W18 Plans
Plans 2.10. Historic Environment Plan.pdf
2.11. CLP Key Plan.pdf
RC-ALG-PLN-2.11-MS.1 Plans 2.11-MS.1. CLP 1 of 4.pdf
RC-ALG-PLN-2.11-MS.2 Plans 2.11-MS.2. CLP 2 of 4.pdf
RC-ALG-PLN-2.11-MS.3 Plans 2.11-MS.3 CLP 3 of 4.pdf
RC-ALG-PLN-2.11-MS.4 Plans 2.11-MS.4 CLP 4 of 4.pdf
RC-ALG-PLN-2.11–W10 Plans 2.11-W10. CLP J15a.pdf
RC-ALG-PLN-2.11 Plans
RC-ALG-PLN-2.10
2.8.1. HCP 1 of 5.pdf
RC-ALG-PLN-2.8.2 Plans 2.8.2. HCP 2 of 5.pdf
RC-ALG-PLN-2.8.3 Plans 2.8.3. HCP 3 of 5.pdf
RC-ALG-PLN-2.8.4 Plans 2.8.4. HCP 4 of 5.pdf
RC-ALG-PLN-2.8.5 Plans 2.8.5. HCP 5 of 5.pdf
RC-ALG-PLN-2.9 Plans 2.9. Statutory non-statutory sites.pdf
RC-ALG-PLN-2.8.1 Plans
Plans/Drawings General Site Plans (Part 23) Private Means of Access (Key Plan) 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Private Means of Access (A43) 26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Private Means of Acess (J15a) 26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Private Means of Acess (Emergency Access) 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Speed Limits Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 1 of 5) 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 2 of 5) 26.10.18 TPA/Hydrock
Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 3 of 5) 26.10.18 TPA/Hydrock
Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 4 of 5) 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Speed Limits Plan (Sheet 5 of 5) 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal - Key Plan 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal – 1 of 3 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal – 2 of 3 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Hedgerow and Tree Retention and Removal – 3 of 3 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) J15A Hedgerow and Tree Retention and Removal 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative general arrangement (key
plan)
26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative general arrangement (sheet
1 of 2)
26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative general arrangement (sheet
2 of 2)
26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail Interchange illustrative Phasing Plan 26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 1 layout (sheet 1 of 2) 26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 1 layout (sheet 2 of 2) 26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 2 layout (sheet 1 of 2) 26.10.18 Trust Rail
Plans/Drawings General Site Plans (Part 23) Rail interchange illustrative phase 2 layout (sheet 2 of 2) 26.10.18 Trust Rail
Plans/Drawings Detailed Plans (Part 23) Long Sections Railway Alignment (sheet 1 of 3) 26.10.18 Trust Rail
Plans/Drawings Detailed Plans (Part 23) Long Sections Railway Alignment (sheet 2 of 3) 26.10.18 Trust Rail
Plans/Drawings Detailed Plans (Part 23) Long Sections Railway Alignment (sheet 3 of 3) 26.10.18 Trust Rail
Plans/Drawings Detailed Plans (Part 23) Cross Sections Railway Alignment (sheet 1 of 2) 26.10.18 Trust Rail
Plans/Drawings Detailed Plans (Part 23) Cross Sections Railway Alignment (sheet 2 of 2) 26.10.18 Trust Rail
Plans/Drawings Elevations (Part 23) Unit 9 Illustrative Colour Elevations-A0 26.10.18 MSA
Plans/Drawings Detailed Plans (Part 23) Landscape Sections 1 of 2 26.10.18 BCA
Plans/Drawings Detailed Plans (Part 23) Landscape Sections 2 of 2 26.10.18 BCA
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – General Arrangement 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Parameters Plan 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Northbound Merge 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Northbound
Diverge
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Southbound
Merge
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan & Profile Southbound
Diverge
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Cross Sections 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Departure from Standard -
Mainline 1 of 2
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Departure from Standard -
Mainline 2 of 2
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Departure from Standard -
Northbound Diverge
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Speed Limit Plan 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – TRO Plan 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction - Proposed Contours 26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Junction 15a – General Arrangement 26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Junction 15a – Parameters Plan 26.10.18 Hydrock
RC-ALG-PLN-2.28.0 Plans 2.28.0. J15a General Arrangement.pdf
RC-ALG-PLN-2.28.1 Plans 2.28.1. J15a Parameters Plan.pdf
RC-ALG-PLN-2.27.7 Plans 2.27.7. SAJ Mainline 1 of 2.pdf
RC-ALG-PLN-2.27.8 Plans 2.27.8. SAJ Mainline 2 of 2.pdf
RC-ALG-PLN-2.27.9 Plans 2.27.9. SAJ Northbound Diverge.pdf
RC-ALG-PLN-2.27.10 Plans 2.27.10. SAJ Speed Limit Plan.pdf
RC-ALG-PLN-2.27.11 Plans 2.27.11. SAJ TRO Plan.pdf
RC-ALG-PLN-2.27.12 Plans 2.27.12. SAJ Proposed Contours.pdf
RC-ALG-PLN-2.27.1 Plans 2.27.1. SAJ Parameters Plan.pdf
RC-ALG-PLN-2.27.2 Plans 2.27.2. SAJ P&P Northbound Merge.pdf
RC-ALG-PLN-2.27.3 Plans 2.27.3. SAJ P&P Northbound Diverge.pdf
RC-ALG-PLN-2.27.4 Plans 2.27.4. SAJ P&P Southbound Merge.pdf
RC-ALG-PLN-2.27.5 Plans 2.27.5. SAJ P&P Southbound Diverge.pdf
RC-ALG-SEC-2.27.6 Plans 2.27.6. SAJ Cross Sections.pdf
RC-ALG-ELE-2.24.0 Plans 2.24.0. CSRA 1 of 2.pdf
RC-ALG-ELE-2.24.1 Plans 2.24.1. CSRA 2 of 2.pdf
RC-ALG-SEC-2.25 Plans 2.25. Unit 9 ICE A0.pdf
RC-ALG-PLN-2.26.0 Plans 2.26.0. Landscape Sections 1 of 2.pdf
RC-ALG-PLN-2.26.1 Plans 2.26.1. Landscape Sections 2 of 2.pdf
RC-ALG-PLN-2.27.0 Plans 2.27.0. SAJ General Arrangement.pdf
RC-ALG-PLN-2.21.2 Plans 2.21.1. IPP1L 2 of 2.pdf
RC-ALG-SEC-2.22.0 Plans 2.22.0. IP2L 1 of 2.pdf
RC-ALG-SEC-2.22.1 Plans 2.22.1. IP2L 2 of 2.pdf
RC-ALG-SEC-2.23.0 Plans 2.23.0. LSRA 1 of 3.pdf
RC-ALG-SEC-2.23.1 Plans 2.23.1. LSRA 2 of 3.pdf
RC-ALG-SEC-2.23.2 Plans 2.23.2. LSRA 3 of 3.pdf
RC-ALG-PLN-2.19.4 Plans 2.19.4. J15a HATRAR 4 of 4.pdf
RC-ALG-PLN-2.20.0 Plans 2.20.0. IGA Key Plan.pdf
RC-ALG-PLN-2.20.1 Plans 2.20.1. IGA 1 of 2.pdf
RC-ALG-PLN-2.20.2 Plans 2.20.2. IGA 2 of 2.pdf
RC-ALG-PLN-2.21.0 Plans 2.21.0. IPP.pdf
RC-ALG-PLN-2.21.1 Plans 2.21.1. IPP1L 1 of 2.pdf
RC-ALG-PLN-2.18.4 Plans 2.18.4. SLP 4 of 5.pdf
RC-ALG-PLN-2.18.5 Plans 2.18.5. SLP 5 of 5.pdf
RC-ALG-PLN-2.19.0 Plans 2.19.0. HATRAR Key Plan.pdf
RC-ALG-PLN-2.19.1 Plans 2.19.1. HATRAR 1 of 4.pdf
RC-ALG-PLN-2.19.2 Plans 2.19.2. HATRAR 2 of 4.pdf
RC-ALG-PLN-2.19.3 Plans 2.19.3. HATRAR 3 of 4.pdf
RC-ALG-PLN-2.17.2 Plans 2.17.2 PMoA J15a.pdf
RC-ALG-PLN-2.17.3 Plans 2.17.3 PMoA Emergency Access.pdf
RC-ALG-PLN-2.18.0 Plans 2.18.0. SLP.pdf
RC-ALG-PLN-2.18.1 Plans 2.18.1. SLP 1 of 5.pdf
RC-ALG-PLN-2.18.2 Plans 2.18.2. SLP 2 of 5.pdf
RC-ALG-PLN-2.18.3 Plans 2.18.3. SLP 3 of 5.pdf
RC-ALG-PLN-2.17.0 Plans 2.17.0. PMoA Key Plan.pdf
RC-ALG-PLN-2.17.1 Plans 2.17.1. PMoA A43.pdf
Plans/Drawings Detailed Plans (Part 23) Junction 15a – Plan & Profile A43 Westbound Link Road 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a – Plan & Profile A43 Southbound Merge 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a – Speed Limit Plan 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a – TRO Plan 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a - Proposed Contours 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a - Cross Sections 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Northampton Road – General Arrangement 26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Site Plan 26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Site Access Junction – Plan View of Grade Separated
North Bridge
26.10.18 Hydrock
Plans/Drawings Elevations (Part 23) Site Access Junction – Elevation and Sections through
North Bridge
26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Site Access Junction – Plan View of Grade Separated
South Bridge
26.10.18 Hydrock
Plans/Drawings Elevations (Part 23) Site Access Junction – Elevation and Section South
Bridge
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan view of Northern Slip Road
Retaining Walls (North of Junction)
26.10.18 Hydrock
Plans/Drawings Elevations (Part 23) Site Access Junction – Elevations and Typical Sections
of Northern Slip Road Retaining Walls
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Plan view of Northern Slip Road
Retaining Walls (South of Junction)
26.10.18 Hydrock
Plans/Drawings Elevations (Part 23) Site Access Junction – Elevations and Sections of
Southern Slip Road Retaining Walls
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Existing A43 Canal bridge 26.10.18 Hydrock
Plans/Drawings Elevations (Part 23) Site Access Junction – Proposed Canal Bridge Widening
Plan View and Elevation
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Site Access Junction – Proposed Canal Bridge Widening
Abutment and Bridge Elevation
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a – Proposed Canal Bridge Widening Plan
View and East Abutment Elevation
26.10.18 Hydrock
Plans/Drawings Detailed Plans (Part 23) Junction 15a – Proposed Typical Details through Canal
Bridge widening - Bridge Elevation
26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Northampton Road – Proposed Underpass General
Arrangement
26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Pedestrian Underpass under the Site Access Road –
General Arrangement
26.10.18 Hydrock
Plans/Drawings General Site Plans (Part 23) Junction 4 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 1 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 2 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 3 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 4 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement – 5 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 4 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 1 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 2 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 3 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement – 4 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 6 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - Existing Layout Plan 26.10.18 TPARC-ALG-PLN-2.36.0 Plans 2.36.0. J7 Existing Layout Plan.pdf
RC-ALG-PLN-2.35.2.0 Plans 2.35.2.0. J6 GA Key Plan.pdf
RC-ALG-PLN-2.35.2.1 Plans 2.35.2.1. J6 GA 1 of 4.pdf
RC-ALG-PLN-2.35.2.2 Plans 2.35.2.2. J6 GS 2 of 4.pdf
RC-ALG-PLN-2.35.2.3 Plans 2.35.2.3. J6 GA 3 of 4.pdf
RC-ALG-PLN-2.35.2.4 Plans 2.35.2.4. J6 GA 4 of 4.pdf
RC-ALG-PLN-2.35.3 Plans 2.35.3. J6 GA Masterplan.pdf
RC-ALG-PLN-2.34.2.3 Plans 2.34.2.3. J4 GA 3 of 5.pdf
RC-ALG-PLN-2.34.2.4 Plans 2.34.2.4. J4 GA 4 of 5.pdf
RC-ALG-PLN-2.34.2.5 Plans 2.34.2.5. J4 GA 5 of 5.pdf
RC-ALG-PLN-2.34.3 Plans 2.34.3. J4 GA Masterplan.pdf
RC-ALG-PLN-2.35.0 Plans 2.35.0. J6 Existing Layout Plan.pdf
RC-ALG-PLN-2.35.1 Plans 2.35.1. J6 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.33 Plans 2.33. Pedestrian Underpass General
Arrangement.pdf
RC-ALG-PLN-2.34.0 Plans 2.34.0. J4 Existing Layout Plan.pdf
RC-ALG-PLN-2.34.1 Plans 2.34.1. J4 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.34.2.0 Plans 2.34.2.0. J4 GA Key Plan.pdf
RC-ALG-PLN-2.34.2.1 Plans 2.34.2.1. J4 GA 1 of 5.pdf
RC-ALG-PLN-2.34.2.2 Plans 2.34.2.2. J4 GA 2 of 5.pdf
RC-ALG-PLN-2.30.10 Plans 2.30.10. SAJ Existing Canal Bridge.pdf
RC-ALG-PLN-2.30.11 Plans 2.30.11. SAJ Proposed Canal Bridge WPV
and Elevation.pdf
RC-ALG-PLN-2.30.12 Plans 2.30.12. SAJ Proposed Canal Bridge WA
and Bridge Elevation.pdf
RC-ALG-PLN-2.31.1 Plans 2.31.1. J15a Proposed Canal Bridge WPV
and Elevation.pdf
RC-ALG-PLN-2.31.2 Plans 2.31.2. J15a Proposed Typical Details
through Canal Bridge Widening.pdf
RC-ALG-PLN-2.32 Plans 2.32. Northampton Rd Proposed Underpass
General Arrangement.pdf
RC-ALG-PLN-2.30.3 Plans 2.30.3.SAJ PV Seperated South Bridge.pdf
RC-ALG-PLN-2.30.4 Plans 2.30.4. SAJ EAS South Bridge.pdf
RC-ALG-PLN-2.30.6 Plans 2.30.6. SAJ Northern Slip Rd Retaining
Walls.pdf
RC-ALG-PLN-2.30.7 Plans 2.30.7. SAJ EaTS Northern Slip Rd
Retaining Walls.pdf
RC-ALG-PLN-2.30.8 Plans 2.30.8. SAJ Plan View Northern Slip Rd
Retaining Walls.pdf
RC-ALG-PLN-2.30.9 Plans 2.30.9. SAJ Elevations and Sections
Southern Slip Rd Retaining Walls.pdf
RC-ALG-PLN-2.28.6 Plans 2.28.6. J15a Proposed Contours.pdf
RC-ALG-PLN-2.28.7 Plans 2.28.7. J15a Cross Sections.pdf
RC-ALG-PLN-2.29 Plans 2.29. Northampton Road General
Arrangement.pdf
RC-ALG-PLN-2.30.0 Plans 2.30.0. SAJ Site Plan.pdf
RC-ALG-PLN-2.30.1 Plans 2.30.1. SAJ PV Seperated North Bridge.pdf
RC-ALG-PLN-2.30.2 Plans 2.30.2. SAJ EAS through North Bridge.pdf
RC-ALG-PLN-2.28.2 Plans 2.28.2. J15a PP A43 Westbound.pdf
RC-ALG-PLN-2.28.3 Plans 2.28.3. J15a PP A43 Southbound.pdf
RC-ALG-PLN-2.28.4 Plans 2.28.4. J15a Speed Limit Plan.pdf
RC-ALG-PLN-2.28.5 Plans 2.28.5. J15a TRO Plan.pdf
Plans/Drawings General Site Plans (Part 23) Junction 7 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 1 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 2 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 3 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement – 4 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 7 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 1 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 2 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 3 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 4 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement – 5 of 5 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 14 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 1 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 2 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 3 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement – 4 of 4 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 15 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – 1 of 3 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – 2 of 3 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – 3 of 3 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 19 - General Arrangement – Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 20 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 20 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – 1 of 2 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – 2 of 2 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 20 - General Arrangement – Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 29 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 29 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement – 1 of 2 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement – 2 of 2 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 29 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 31 - Existing Layout Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 31 - Red Line Boundary Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement – Key Plan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement – 1 of 2 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement – 2 of 2 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Junction 31 - General Arrangement - Masterplan 26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Towcester Road/ Northampton Road Footway/
Cycleway – Outline Design
26.10.18 TPA
Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – Key Plan 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – 1 of 5 26.10.18 BCA
RC-ALG-PLN-2.42.2.2 Plans 2.42.2.2. J31 GA 2 of 2.pdf
RC-ALG-PLN-2.42.3 Plans 2.42.3. J31 GA Masterplan.pdf
RC-ALG-PLN-2.43.1 Plans 2.43.1. Towcester Road Northampton Road
Outline Design.pdf
RC-ALG-PLN-2.44.0 Plans 2.44.0.PROWS Key Plan.pdf
RC-ALG-PLN-2.44.1 Plans 2.44.1. PROWS 1 of 5.pdf
RC-ALG-PLN-2.41.2.2 Plans 2.41.2.2. J29 GA 2 of 2.pdf
RC-ALG-PLN-2.41.3 Plans 2.41.3. J29 GA Masterplan.pdf
RC-ALG-PLN-2.42.0 Plans 2.42.0. J31 Existing Layout Plan.pdf
RC-ALG-PLN-2.42.1 Plans 2.42.1. J31 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.42.2.0 Plans 2.42.2.0. J31 GA Key Plan.pdf
RC-ALG-PLN-2.42.2.1 Plans 2.42.2.1. J31 GA 1 of 2.pdf
RC-ALG-PLN-2.40.2.2 Plans 2.40.2.2. J20 GA 2 of 2.pdf
RC-ALG-PLN-2.40.3 Plans 2.40.3. J20 GA Masterplan.pdf
RC-ALG-PLN-2.41.0 Plans 2.41.0. J29 Existing Layout Plan.pdf
RC-ALG-PLN-2.41.1 Plans 2.41.1. J29 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.41.2.0 Plans 2.41.2.0. J29 GA Key Plan.pdf
RC-ALG-PLN-2.41.2.1 Plans 2.41.2.1. J29 GA 1 of 2.pdf
RC-ALG-PLN-2.39.2.3 Plans 2.39.2.3. J19 GA 3 of 3.pdf
RC-ALG-PLN-2.39.3 Plans 2.39.3. J19 GA Masterplan.pdf
RC-ALG-PLN-2.40.0 Plans 2.40.0. J20 Existing Layout Plan.pdf
RC-ALG-PLN-2.40.1 Plans 2.40.1. J20 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.40.2.0 Plans 2.40.2.0. J20 GA Key Plan.pdf
RC-ALG-PLN-2.40.2.1 Plans 2.40.2.1. J20 GA 1 of 2.pdf
RC-ALG-PLN-2.38.3 Plans 2.38.3. J15 GA Masterplan.pdf
RC-ALG-PLN-2.39.0 Plans 2.39.0. J19 Existing Layout Plan.pdf
RC-ALG-PLN-2.39.1 Plans 2.39.1. J19 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.39.2.0 Plans 2.39.2.0. J19 GA Key Plan.pdf
RC-ALG-PLN-2.39.2.1 Plans 2.39.2.1. J19 GA 1 of 3.pdf
RC-ALG-PLN-2.39.2.2 Plans 2.39.2.2. J19 GA 2 of 3.pdf
RC-ALG-PLN-2.38.1 Plans 2.38.1. J15 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.38.2.0 Plans 2.38.2.0. J15 GA Key Plan.pdf
RC-ALG-PLN-2.38.2.1 Plans 2.38.2.1. J15 GA 1 of 4.pdf
RC-ALG-PLN-2.38.2.2 Plans 2.38.2.2. J15 GA 2 of 4.pdf
RC-ALG-PLN-2.38.2.3 Plans 2.38.2.3. J15 GA 3 of 4.pdf
RC-ALG-PLN-2.38.2.4 Plans 2.38.2.4. J15 GA 4 of 4.pdf
RC-ALG-PLN-2.37.2.2 Plans 2.37.2.2. J14 GA 2 of 5.pdf
RC-ALG-PLN-2.37.2.3 Plans 2.37.2.3. J14 GA 3 of 5.pdf
RC-ALG-PLN-2.37.2.4 Plans 2.37.2.4. J14 GA 4 of 5.pdf
RC-ALG-PLN-2.37.2.5 Plans 2.37.2.5. J14 GA 5 of 5.pdf
RC-ALG-PLN-2.37.3 Plans 2.37.3. J14 GA Masterplan.pdf
RC-ALG-PLN-2.38.0 Plans 2.38.0. J15 Existing Layout Plan.pdf
RC-ALG-PLN-2.36.2.4 Plans 2.36.2.4. J7 GA 4 of 4.pdf
RC-ALG-PLN-2.36.3 Plans 2.36.3. J7 GA Masterplan.pdf
RC-ALG-PLN-2.37.0 Plans 2.37.0. J14 Existing Layout Plan.pdf
RC-ALG-PLN-2.37.1 Plans 2.37.1. J14 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.37.2.0 Plans 2.37.2.0. J14 GA Key Plan.pdf
RC-ALG-PLN-2.37.2.1 Plans 2.37.2.1. J14 GA 1 of 5.pdf
RC-ALG-PLN-2.36.1 Plans 2.36.1. J7 Red Line Boundary Plan.pdf
RC-ALG-PLN-2.36.2.0 Plans 2.36.2.0. J7 GA Key Plan.pdf
RC-ALG-PLN-2.36.2.1 Plans 2.36.2.1. J7 GA 1 of 4.pdf
RC-ALG-PLN-2.36.2.2 Plans 2.36.2.2. J7 GA 2 of 4.pdf
RC-ALG-PLN-2.36.2.3 Plans 2.36.2.3. J7 GA 3 of 4.pdf
Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – 2 of 5 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy – 3 of 5 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) J15A Public Rights of Way Strategy (4 of 5) 26.10.18 BCA
Plans/Drawings General Site Plans (Part 23) Public Rights of Way Strategy Footpath Links with
Northampton Gateway (5 of 5)
26.10.18 BCA
Draft development consent order Draft Order (Part 9) Draft Development Consent Order 26.10.18 Turley
Draft development consent order Explanatory Memorandum to Draft
Order
(Part 10)
Explanatory Memorandum 26.10.18 Turley
Compulsory Purchase information Statement of Reasons document (Part
13)
Statement of Reasons 26.10.18 Womble Bond
Dickinson
Compulsory Purchase information Funding statement document (Part 13) Funding Statement 26.10.18 Womble Bond
Dickinson
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Main Site) – (MS) 26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (J15a) – (W10) 26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Cycleway on Towcester) – (W17A) 26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Cycleway on Barn Lane) – (W17B) 26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference A43 (south)/ Saint Johns Road (west)/ A43
(north)/ Saint Johns Road (east) – (W18)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A43 South/ Northampton Road/ A43 North) –
(W19)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A43 and Tove Roundabout, Towcester
Bypass (southwest)/ Towcester Road/ A5, (north)/ A43,
(northeast)/ A5, Watling Street (southeast)
– (W20)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (Abthorpe Road and Abthorpe roundabout/
A43, Towcester Bypass (north)/ Brackley Road/ A43, Towcester
Bypass (south) – (W21)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A5076, Upton Way (south)/ Telford
Way/ A5076, Upton Way (north)/ Water Tull Way/ Duston Mill
Lane) – (W22)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A5076, Upton Way (south)/ High Street/
A5076, Upton Way (north)/ Duston Mill) – (W23)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference (A5076/ A5123/ Upton Way Roundabout
(Pineham Park) (Danes Camp Way) –
(W24)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference A5076 (West)/ Hunsbury Hill Avenue/
Hunsbarrow Road/ A5076, Danes Camp Way/ Hunsbury
Hill Road – (W25)
26.10.18 Terra Quest
Compulsory Purchase information Book of reference Part 1 (Part 13) Book of Reference Towcester Road/ A5076, Danes
Camp Way/ A5123, Towcester Road/ Mere Way/ Tesco Access –
(W26)
26.10.18 Terra Quest
Report Consultation report (Part 8a) Consultation Report 26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 1 – Statement of Compliance 26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 2 – Regulation 6 Notification 26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 3 – Regulation 8 Notification
(2017)
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 4 – Section 46 Notification Letter
to the Planning Inspectorate
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 5 – List of Prescribed Bodies
Consulted under Section 42 of the Act
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 6 – Letter templates to prescribed
bodies inviting comments on the Project under Section 42 of the
2008 Act
26.10.18 Camargue
5.1 Reports 5.1. CR Appendix 4.pdf
5.1 Reports 5.1. CR Appendix 5.pdf
5.1 Reports 5.1. CR Appendix 6.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W25.pdf
4.3 Compulsory
Acquisition Information
4.3. BOR W26.pdf
5.1 Reports 5.1. CR.pdf
5.1 Reports 5.1. CR Appendix 1.pdf
5.1 Reports 5.1. CR Appendix 2.pdf
5.1 Reports 5.1. CR Appendix 3.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W19.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W20.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W21.pdf
4.3 Compulsory
Acquisition Information
4.3. BOR W22.pdf
4.3 Compulsory
Acquisition Information
4.3. BOR W23.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W24.pdf
4.2 Compulsory
Acquisition Information
4.2. Funding Statement.pdf
4.3 Compulsory
Acquisition Information
4.3. BOR Main Site.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W10.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W17A.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W17B.pdf
4.3 Compulsory Acquisition
Information
4.3. BOR W18.pdf
RC-ALG-PLN-2.44.3 Plans 2.44.3. PROWS 3 of 5.pdf
RC-ALG-PLN-2.44.4 Plans 2.44.4. J15A PROWS 4 of 5.pdf
RC-ALG-PLN-2.44.5 Plans 2.44.5. PROWS Footpath Links with
N'hampton Gateway.pdf 5 of 5.pdf
3.1 Draft Development
Consent Orders
3.1. Draft Dev Consent Order.pdf
3.2 Draft Development
Consent Orders
3.2. Explanatory Memorandum.pdf
4.1 Compulsory Acquisition
Information
4.1. Statement of Reasons.pdf
RC-ALG-PLN-2.44.2 Plans 2.44.2. PROWS 2 of 5.pdf
Report Consultation report (Part 8a) Consultation Report – Appendix 7 – List of Local Authorities
consulted under Section 43 of the Act
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 8 – Letter templates sent to Local
Authorities inviting comments on the Project under Section 43 of
the Act
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 10 – Overview of Informal
Engagement with Key Stakeholders
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 11 – Letter templates sent to
persons with an interest in the land inviting comments on the
Project under Section 44 of the Act
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 12 – Section 47, Phase 1:
Covering emails to local authorities requesting comments on the
draft Statement of Community Consultation (SoCC) and Report to
Inform the SoCC in March 2016
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 13 – Section 47, Phase 1:
Responses received from local authorities on the draft SoCC and
Report to Inform the SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 14 – Section 47, Phase 1:
Published SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 15 – Section 47, Phase 1:
Published Report to Inform the SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 16 – Section 47, Phase 1: Notice
of Deposit of the SoCC in Northampton Chronicle & Echo on 28
April 2016 (Section 47 notice)
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 17 – Section 47, Phase 1:
Consultation zone
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 18 – Section 47, Phase 1:
Database of all addresses in consultation zone and other
stakeholders that were notified of the consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 19 – Section 47, Phase 1:
Notification letter sent to addresses within the consultation zone
and stakeholders ahead of consultation (18 April 2016)
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 20 – Section 47, Phase 1:
Exhibition panels
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 21 – Section 47, Phase 1:
Supporting maps and plans published for consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 22 – Section 47, Phase 1:
Feedback form
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 23 – Section 47, Phase 1: Copy
of PEIR Phase 1: Non-technical summary published as part of the
consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 24 – Section 47, Phase 1: Press
releases issued in relation to the consultation
26.10.18 Camargue
5.1 Reports 5.1. CR Appendix 23.pdf
5.1 Reports 5.1. CR Appendix 24.pdf
5.1 Reports 5.1. CR Appendix 17.pdf
5.1 Reports 5.1. CR Appendix 18.pdf
5.1 Reports 5.1. CR Appendix 19.pdf
5.1 Reports 5.1. CR Appendix 20.pdf
5.1 Reports 5.1. CR Appendix 21.pdf
5.1 Reports 5.1. CR Appendix 22.pdf
5.1 Reports 5.1. CR Appendix 11.pdf
5.1 Reports 5.1. CR Appendix 12.pdf
5.1 Reports 5.1. CR Appendix 13.pdf
5.1 Reports 5.1. CR Appendix 14.pdf
5.1 Reports 5.1. CR Appendix 15.pdf
5.1 Reports 5.1. CR Appendix 16.pdf
5.1 Reports 5.1. CR Appendix 7.pdf
5.1 Reports 5.1. CR Appendix 8.pdf
5.1 Reports 5.1. CR Appendix 10.pdf
Report Consultation report (Part 8a) Consultation Report – Appendix 25 – Section 47, Phase 1:
Sample
of media coverage relating to the consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 26 – Section 47, Phase 1
feedback
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 27 – Section 47, Phase 1:
Schedule of feedback from local community and the regard the
Applicant has had to these responses
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 28 – Section 47, Phase 1:
Responses from organisations and MPs and the regard the
Applicant has had to these responses
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 29 – Section 47, Phase 2:
Covering emails to local authorities requesting comments on the
draft SoCC and Report to Inform the SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 30 – Section 47, Phase 2:
Responses received from local authorities on the draft SoCC and
Report to Inform the SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 31 – Section 47, Phase 2:
Published Updated SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 32 – Section 47, Phase 2:
Published Updated Report to Inform the SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 33 – Section 47, Phase 2: Notice
of Deposit of the SoCC
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 34 – Section 47, Phase 2:
Notification letter sent to addresses within the consultation zone
and other stakeholders (non-statutory consultees) on 27 February
2018
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 35 – Section 47, Phase 2:
Consultation zone
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 36 – Section 47, Phase 2:
Database of consultees notified of consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 37 – Parish Council boundaries
plan
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 38 – Section 47, Phase 2:
Exhibition panels
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 39 – Section 47, Phase 2:
Feedback form
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 40 – Section 47, Phase 2:
Photographs of documents at public exhibitions
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 41 – Section 47, Phase 2: Copy
of PEIR: Non-Technical Summary published as part of the
consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 42 – Section 48 Notice 26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 43 – List of Regulation 11
consultees to receive a copy of the Section 48 notice at Section
42, Phase 2 Consultation
26.10.18 Camargue
5.1 Reports 5.1. CR Appendix 41.pdf
5.1 Reports 5.1. CR Appendix 42.pdf
5.1 Reports 5.1. CR Appendix 43.pdf
5.1 Reports 5.1. CR Appendix 35.pdf
5.1 Reports 5.1. CR Appendix 36.pdf
5.1 Reports 5.1. CR Appendix 37.pdf
5.1 Reports 5.1. CR Appendix 38.pdf
5.1 Reports 5.1. CR Appendix 39.pdf
5.1 Reports 5.1. CR Appendix 40.pdf
5.1 Reports 5.1. CR Appendix 29.pdf
5.1 Reports 5.1. CR Appendix 30.pdf
5.1 Reports 5.1. CR Appendix 31.pdf
5.1 Reports 5.1. CR Appendix 32.pdf
5.1 Reports 5.1. CR Appendix 33.pdf
5.1 Reports 5.1. CR Appendix 34.pdf
5.1 Reports 5.1. CR Appendix 25.pdf
5.1 Reports 5.1. CR Appendix 26.pdf
5.1 Reports 5.1. CR Appendix 27.pdf
5.1 Reports 5.1. CR Appendix 28.pdf
Report Consultation report (Part 8a) Consultation Report – Appendix 44 – Section 48: Copies of
notices
that appeared in newspapers
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 45 – Phase 2: Press releases
issued in relation to the consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 46 – Phase 2: Sample of media
coverage related to the consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 47 – Phase 2: Photos of roadside
adverts at Junction 15A service station in both directions
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 48 – Phase 2: Example
screenshots of the illustrative 3D model
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 49 – Section 42, Phase 2:
Responses received from S42 consultation and the regard the
Applicant has had to these responses (including S43 consultees)
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 50 – Section 44, Phase 2:
Responses received from S44 consultation and the regard the
Applicant has had to these responses
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 51 – Section 47, Phase 2: Full
verbatim feedback received from respondents with thematic
groupings
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 52 – Section 47, Phase 2:
Responses received from S47 consultation and the regard the
Applicant has had to these responses
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 53 – Section 47, Phase 2:
Responses received from S47 representative consultees and the
regard the Applicant has had to these responses
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 54 – Section 47, Phase 2:
Acknowledgement letter sent to all respondents after the
consultation
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 55 – Localised Consultation:
notification letter sent to relevant stakeholders and relevant
addresses in the local community on 25 June 2018
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 56 – Localised Consultation:
notification letter sent to affected landowners and others with an
interest in the land on 25 June 2018
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 57 – Localised Consultation:
letter sent as a reminder, a week prior to close of consultation on
16 July 2018
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 58 – Localised Consultation:
plans
pack
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 59 – Localised Consultation:
feedback form
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 60 – Localised Consultation:
database of recipients of notifications
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 61 – Localised Consultation:
summary of responses received
26.10.18 Camargue
5.1 Reports 5.1. CR Appendix 59.pdf
5.1 Reports 5.1. CR Appendix 60.pdf
5.1 Reports 5.1. CR Appendix 61.pdf
5.1 Reports 5.1. CR Appendix 53.pdf
5.1 Reports 5.1. CR Appendix 54.pdf
5.1 Reports 5.1. CR Appendix 55.pdf
5.1 Reports 5.1. CR Appendix 56.pdf
5.1 Reports 5.1. CR Appendix 57.pdf
5.1 Reports 5.1. CR Appendix 58.pdf
5.1 Reports 5.1. CR Appendix 47.pdf
5.1 Reports 5.1. CR Appendix 48.pdf
5.1 Reports 5.1. CR Appendix 49.pdf
5.1 Reports 5.1. CR Appendix 50.pdf
5.1 Reports 5.1. CR Appendix 51.pdf
5.1 Reports 5.1. CR Appendix 52.pdf
5.1 Reports 5.1. CR Appendix 44.pdf
5.1 Reports 5.1. CR Appendix 45.pdf
5.1 Reports 5.1. CR Appendix 46.pdf
Report Consultation report (Part 8a) Consultation Report – Appendix 62 – Copies of newsletters
published
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 63 – Copies of monthly updates
provided to the Local Liaison Group (LLG)
26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 64 – Example of website page 26.10.18 Camargue
Report Consultation report (Part 8a) Consultation Report – Appendix 65 – Keep in touch (KIT) card 26.10.18 Camargue
Associated Development information Environmental Protection information
(Part
19)
Environmental protection statement of engagement 26.10.18 RSK
Report Other Habitat Regulations Assessment No Significant Effects
Report
26.10.18 RSK
Associated Development information Details of other consents/licences
required
(Part 24)
Consents and licences required under other legislation 26.10.18 Womble Bond
Dickinson
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Introduction (Chapter 1) 26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Site and Surroundings
(Chapter 2)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Reasonable Alternatives
(Chapter 3)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Overview of Consultation
and Scoping (Chapter 4)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – The Proposed Development
(Chapter 5)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Legislative and Policy
Context (Chapter 6)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – EIA Assessment
Methodology (Chapter 7)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Air Quality (Chapter 8) 26.10.18 RPS
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Agricultural Land (Chapter 9) 26.10.18 Reading
Agricultural
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Archaeology (Chapter 10) 26.10.18 CFA Archaeology
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Built Heritage (Chapter 11) 26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Ground Conditions (Chapter
12)
26.10.18 Hydrock
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Hydrology, Drainage and
Flood Risk (Chapter 13)
26.10.18 Hydrock
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Biodiversity (Chapter 14) 26.10.18 RSK
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Landscape and Visual
Impact Assessment (Chapter 15)
26.10.18 RSK
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Noise and Vibration
(Chapter 16)
26.10.18 Spectrum
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Highways and
Transportation (Chapter 17)
26.10.18 TPA
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Socio-Economics (Chapter
18)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Lighting (Chapter 19) 26.10.18 Hoare Lea
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Waste and Resource
Efficiency (Chapter 20)
26.10.18 RPS
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Climate Change Mitigation
and Adaptation (Chapter 21)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Cumulative Effects
Summary (Chapter 22)
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Environmental Statement – Conclusion (Chapter 23) 26.10.18 Turley
6.1 Environmental
Statement
6.1. ES Chapter 21.pdf
6.1 Environmental
Statement
6.1. ES Chapter 22.pdf
6.1 Environmental
Statement
6.1. ES Chapter 23.pdf
6.1 Environmental
Statement
6.1. ES Chapter 15.pdf
6.1 Environmental
Statement
6.1. ES Chapter 16.pdf
6.1 Environmental
Statement
6.1. ES Chapter 17.pdf
6.1 Environmental
Statement
6.1. ES Chapter 18.pdf
6.1 Environmental
Statement
6.1. ES Chapter 19.pdf
6.1 Environmental
Statement
6.1. ES Chapter 20.pdf
6.1 Environmental
Statement
6.1. ES Chapter 9.pdf
6.1 Environmental
Statement
6.1. ES Chapter 10.pdf
6.1 Environmental
Statement
6.1. ES Chapter 11.pdf
6.1 Environmental
Statement
6.1. ES Chapter 12.pdf
6.1 Environmental
Statement
6.1. ES Chapter 13.pdf
6.1 Environmental
Statement
6.1. ES Chapter 14.pdf
6.1 Environmental
Statement
6.1. ES Chapter 3.pdf
6.1 Environmental
Statement
6.1. ES Chapter 4.pdf
6.1 Environmental
Statement
6.1. ES Chapter 5.pdf
6.1 Environmental
Statement
6.1. ES Chapter 6.pdf
6.1 Environmental
Statement
6.1. ES Chapter 7.pdf
6.1 Environmental
Statement
6.1. ES Chapter 8.pdf
5.1 Reports 5.1. CR Appendix 65.pdf
5.2 Reports 5.2. Environmental Protection Statement of
Engagement.pdf
5.3 Reports 5.3. Habitat Regs Assessment NSE
Report.pdf
5.4 Reports 5.4. Contents and Licences Required.pdf
6.1 Environmental
Statement
6.1. ES Chapter 1.pdf
6.1 Environmental
Statement
6.1. ES Chapter 2.pdf
5.1 Reports 5.1. CR Appendix 62.pdf
5.1 Reports 5.1. CR Appendix 63.pdf
5.1 Reports 5.1. CR Appendix 64.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Appendix 2.1 –
Designations
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Figure 2.1 –
Location Plan
26.10.18 Terra Quest
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Figure 2.2a –
Baseline Utilities
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 2 Figure 2.2b –
Baseline Utilities
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 3 Figure 3.1 – Consultation 1
Illustrative Draft Masterplan (Main SRFI
Site)
26.10.18 MSA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 3 Figure 3.2 – March 2018
S42 Consultation Parameters Plan (Main
SRFI Site)
26.10.18 MSA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 3 Figure 3.3 – March 2018
S42 Consultation Order Limits (All
Proposed Development)
26.10.18 MSA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 4 Appendix 4.1 –
Scoping Opinion
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 4 Appendix 4.2 –
Population and Human Health Scoping Statement
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 4 Appendix 4.3 – Major
Accidents and Natural Disasters Risk Assessment
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.1 - Plans
Forming Embedded Mitigation. Comprising:
• Order Limits Plans
• Parameters Plan (Main SRFI Site),
• Green Infrastructure Plan (Main SRFI Site),
• J15a Green Infrastructure Plan (J15a Works), and
• Minor Highway Works – Site Plans.
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.2. Management
Plans Forming Embedded Mitigation. Comprising:
• Code of Construction Practice (CoCP), and
• Outline Construction Environmental Management Plan (CEMP))
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.3 –
Schedule of Mitigation
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.4 – Masterplans
and J15a Landscape Plan. Comprising:
• Illustrative Masterplan (Main SRFI Site),
• Illustrative Landscape Masterplan (Main SRFI Site), and
• Illustrative J15a Landscape Plan (J15a works).
26.10.18 MSA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.5 – Earthworks
Levels and Volumes. Comprising:
• Earthworks Plateau Levels Option 6 (Main SRFI Site), and
• Earthworks Bund Volumes Option 6 (Main SRFI Site)).
26.10.18 BCA and RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.6 – Plans
Showing Outputs of Adaptive Mitigation.
Comprising:
• Ecological Mitigation Plan (Main SRFI Site),
• Ecological Mitigation Plan (J15a works),
• Hedgerow and Tree Retention and Removal Plan (Main SRFI
Site),
• Hedgerow and Tree Retention and Removal Plan (J15a works),
• Public Rights of Way Strategy (Main SRFI Site), and
• Illustrative Colour Elevations (Main SRFI Site))
26.10.18 Turley6.1.5.6 Environmental Statement 6.1.5.6. ES Chapter 5 Appendix 5.6.pdf
6.1.4.3 Environmental Statement 6.1.4.3. ES Chapter 4 Appendix 4.3.pdf
6.1.5.1 Environmental Statement 6.1.5.1. ES Chapter 5 Appendix 5.1.pdf
6.1.5.2 Environmental Statement 6.1.5.2. ES Chapter 5 Appendix 5.2.pdf
6.1.5.3 Environmental
Statement
6.1.5.3. ES Chapter 5 Appendix 5.3.pdf
6.1.5.4 Environmental Statement 6.1.5.4. ES Chapter 5 Appendix 5.4.pdf
6.1.5.5 Environmental Statement 6.1.5.5. ES Chapter 5 Appendix 5.5.pdf
RC-ALG-PLN-6.1.2.3.1 Environmental
Statement
6.1.2.4. ES Chapter 2 Figure 2.2b.pdf
RC-ALG-PLN-6.1.3.1 Environmental Statement 6.1.3.1.ES Chapter 3 Figure 3.1.pdf
30708-FE-103 Environmental Statement 6.1.3.2. ES Chapter 3 Figure 3.2.pdf
MSA-30708-PL-DCO-117 Environmental Statement 6.1.3.3. ES Chapter 3 Figure 3.3.pdf
6.1.4.1 Environmental
Statement
6.1.4.1. ES Chapter 4 Appendix 4.1.pdf
6.1.4.2 Environmental
Statement
6.1.4.2. ES Chapter 4 Appendix 4.2.pdf
6.1.2.1 Environmental
Statement
6.1.2.1. ES Chapter 2 Appendix 2.1.pdf
RC-ALG-PLN-2.1 Environmental
Statement
6.1.2.2. ES Chapter 2 Figure 2.1.pdf
RC-ALG-PLN-6.1.2.3.0 Environmental
Statement
6.1.2.3. ES Chapter 2 Figure 2.2a.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Appendix 5.7 – Proposed
utilities Infrastructure Works. Comprising:
• Proposed Utilities,
• Utilities Connection Offers, and
• Stopping up Plans
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 5 Figure 5.1 –
Landscape Phasing Plan
26.10.18 BCA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Figure 7.1 – Zone
of Search for other Development
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Figure 7.2 –
Location of Cumulative Projects (sheet 1 of 2)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Figure 7.2 –
Location of Cumulative Projects (sheet 2 of 2)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 7 Appendix 7.3 –
List of Cumulative Projects
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.1 –
Model Inputs and Outputs
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.2 –
Onsite Vehicle Emissions
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.3 –
Rail Emissions
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.4 –
Model Verification
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.5 –
Diffusion Tube Monitoring
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.6 –
Quality Impacts on Designated Sites
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.8 –
AQMAs
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.9 –
Project Specific Monitoring Locations
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.10 –
Modelled Receptors – Northampton – Northern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.11 – Modelled
Receptors – Northampton – Southern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.12 –
Modelled Receptors – Northampton – Central Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.13 –
Modelled Receptors – South Northamptonshire – Northern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.14 –
Modelled Receptors – South Northamptonshire –Central Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.15 – Modelled
Receptors – South Northamptonshire – South
Western Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.16 – Modelled
Receptors – South Northamptonshire – South
Eastern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.17 – Modelled
Roads –Northampton – North Western Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.18 – Modelled
Roads –Northampton – North Eastern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.19 –
Modelled Roads –Northampton –Western Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.20 – Modelled
Roads –Northampton – Central/Eastern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.21 –
Modelled Roads –Northampton – Southern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.22 – Modelled
Roads –South Northamptonshire – Northern
Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.23 – Modelled
Roads –South Northamptonshire – Towcester
Area
26.10.18 RPS
RC-ALG-FIG-6.1.8.19 Environmental
Statement
6.1.8.19. ES Chapter 8 Figure 8.19.pdf
RC-ALG-FIG-6.1.8.20 Environmental Statement 6.1.8.20. ES Chapter 8 Figure 8.20.pdf
RC-ALG-FIG-6.1.8.21 Environmental
Statement
6.1.8.21. ES Chapter 8 Figure 8.21.pdf
RC-ALG-FIG-6.1.8.22 Environmental Statement 6.1.8.22. ES Chapter 8 Figure 8.22.pdf
RC-ALG-FIG-6.1.8.23 Environmental Statement 6.1.8.23. ES Chapter 8 Figure 8.23.pdf
RC-ALG-FIG-6.1.8.13 Environmental Statement 6.1.8.13. ES Chapter 8 Figure 8.13.pdf
RC-ALG-FIG-6.1.8.14 Environmental Statement 6.1.8.14. ES Chapter 8 Figure 8.14.pdf
RC-ALG-FIG-6.1.8.15 Environmental Statement 6.1.8.15. ES Chapter 8 Figure 8.15.pdf
RC-ALG-FIG-6.1.8.16 Environmental Statement 6.1.8.16. ES Chapter 8 Figure 8.16.pdf
RC-ALG-FIG-6.1.8.17 Environmental Statement 6.1.8.17. ES Chapter 8 Figure 8.17.pdf
RC-ALG-FIG-6.1.8.18 Environmental Statement 6.1.8.18. ES Chapter 8 Figure 8.18.pdf
6.1.8.6 Environmental
Statement
6.1.8.6. ES Chapter 8 Appendix 8.6.pdf
RC-ALG-FIG-6.1.8.8 Environmental
Statement
6.1.8.8. ES Chapter 8 Figure 8.8.pdf
RC-ALG-FIG-6.1.8.9 Environmental
Statement
6.1.8.9. ES Chapter 8 Figure 8.9.pdf
RC-ALG-FIG-6.1.8.10 Environmental
Statement
6.1.8.10. ES Chapter 8 Figure 8.10.pdf
RC-ALG-FIG-6.1.8.11 Environmental Statement 6.1.8.11. ES Chapter 8 Figure 8.11.pdf
RC-ALG-FIG-6.1.8.12 Environmental
Statement
6.1.8.12. ES Chapter 8 Figure 8.12.pdf
6.1.7.3 Environmental
Statement
6.1.7.3. ES Chapter 7 Appendix 7.3.pdf
6.1.8.1 Environmental
Statement
6.1.8.1. ES Chapter 8 Appendix 8.1.pdf
6.1.8.2 Environmental
Statement
6.1.8.2. ES Chapter 8 Appendix 8.2.pdf
6.1.8.3 Environmental
Statement
6.1.8.3. ES Chapter 8 Appendix 8.3.pdf
6.1.8.4 Environmental
Statement
6.1.8.4. ES Chapter 8 Appendix 8.4.pdf
6.1.8.5 Environmental
Statement
6.1.8.5. ES Chapter 8 Appendix 8.5.pdf
6.1.5.7 Environmental Statement 6.1.5.7. ES Chapter 5 Appendix 5.7.pdf
RC-ALG-FIG-6.1.5.8 Environmental
Statement
6.1.5.8. ES Chapter 5 Figure 5.1.pdf
RC-ALG-FIG-6.1.7.1 Environmental
Statement
6.1.7.1. ES Chapter 7 Figure 7.1.pdf
RC-ALG-FIG-6.1.7.2.0 Environmental
Statement
6.1.7.2. ES Chapter 7 Figure 7.2. Sheet 1 of
2.pdf
RC-ALG-FIG-6.1.7.2.1 Environmental
Statement
6.1.7.2. ES Chapter 7 Figure 7.2. Sheet 2 of
2.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.24 – Modelled
Roads –South Northamptonshire – South
Western Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.25 – Modelled
Roads –South Northamptonshire – South
Eastern Area
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Figure 8.26 –
Receptors with a Minor Adverse Impact
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 8 Appendix 8.27 –
Modelled Onsite Road Links
26.10.18 RPS
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Appendix 9.1 –
Agricultural Land Classification and Soil Resources, July 2017
26.10.18 Reading
Agricultural
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Appendix 9.2 – Summary of
Agricultural Land Classification and Soil
Resources, November 2017
26.10.18 Reading
Agricultural
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.1 – Soil
Profile Observations
26.10.18 Reading
Agricultural
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.2 – Soil
Resources
26.10.18 Reading
Agricultural
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.3 –
Agricultural Land Classification
26.10.18 Reading
Agricultural
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 9 Figure 9.4 – Farm
Holdings
26.10.18 Reading
Agricultural
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.1 –
Archaeological Sites, Features and Find-spots recorded by the
HER within the Main SRFI Site
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.2 –
Archaeological Sites within the Main SRFI Site revealed
by Geophysical Survey
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.3:
Archaeological Sites within the Main SRFI Site revealed
by Trial Trenching Evaluation
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.4 –
Archaeological Sites and Features within 1km of the
Main SRFI Site
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.5: M1 J15a
Site: Archaeological Sites, Features and Find-
spots
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.6 – A43/A5
Tove Roundabout: Archaeological Sites,
Features and Find-spots here]
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.7 – The
Hedgerows Regulations – Archaeology and History
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.8 –
Geophysical Survey Report (Sumo Services 2017)
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.9 –
Archaeological Evaluation Summary Report (CFA 2017)
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 10 Appendix 10.10
– Written Scheme of Investigation (CFA 2018)
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -
Overall Archaeology Plan
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -
Archaeological Sites, Features and Find-spots within the Main
SRFI Site
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -
Archaeological Sites within the Main SRFI Site derived from
Geophysical Survey and Aerial Photography
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -
Archaeological Sites within the Main SRFI Site identified by Trial
Trenching Evaluation
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -
Archaeological Sites and Features within 1km of the Main SRFI
Site
26.10.18 CFA Archaeology
6.1.10.10 Environmental Statement 6.1.10.10. ES Chapter 10 Appendix
10.10.pdf
RC-ALG-FIG-6.1.10.11.0 Environmental
Statement
6.1.10.11. ES Chapter 10 Appendix
10.11.0.pdf
RC-ALG-FIG-6.1.10.11.1 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix
10.11.1.pdf
RC-ALG-FIG-6.1.10.11.2 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix
10.11.2.pdf
RC-ALG-FIG-6.1.10.11.3 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix
10.11.3.pdf
RC-ALG-FIG-6.1.10.11.4 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix
10.11.4.pdf
6.1.10.4 Environmental Statement 6.1.10.4. ES Chapter 10 Appendix 10.4.pdf
6.1.10.5 Environmental Statement 6.1.10.5. ES Chapter 10 Appendix 10.5.pdf
6.1.10.6 Environmental Statement 6.1.10.6. ES Chapter 10 Appendix 10.6.pdf
6.1.10.7 Environmental Statement 6.1.10.7. ES Chapter 10 Appendix 10.7.pdf
6.1.10.8 Environmental Statement 6.1.10.8. ES Chapter 10 Appendix 10.8.pdf
6.1.10.9 Environmental Statement 6.1.10.9. ES Chapter 10 Appendix 10.9.pdf
RC-ALG-FIG-6.1.9.4 Environmental
Statement
6.1.9.4. ES Chapter 9 Figure 9.2.pdf
RC-ALG-FIG-6.1.9.5 Environmental
Statement
6.1.9.5. ES Chapter 9 Figure 9.3.pdf
RC-ALG-FIG-6.1.9.6 Environmental
Statement
6.1.9.6. ES Chapter 9 Figure 9.4.pdf
6.1.10.1 Environmental Statement 6.1.10.1. ES Chapter 10 Appendix 10.1.pdf
6.1.10.2 Environmental Statement 6.1.10.2. ES Chapter 10 Appendix 10.2.pdf
6.1.10.3 Environmental Statement 6.1.10.3. ES Chapter 10 Appendix 10.3.pdf
RC-ALG-FIG-6.1.8.25 Environmental Statement 6.1.8.25. ES Chapter 8 Figure 8.25.pdf
RC-ALG-FIG-6.1.8.26 Environmental
Statement
6.1.8.26. ES Chapter 8 Figure 8.26.pdf
RC-ALG-APP-6.1.8.27 Environmental
Statement
6.1.8.27. ES Chapter 8 Figure 8.27.pdf
6.1.9.1 Environmental Statement 6.1.9.1. ES Chapter 9 Appendix 9.1.pdf
6.1.9.2 Environmental Statement 6.1.9.2. ES Chapter 9 Appendix 9.2.pdf
RC-ALG-FIG-6.1.9.3 Environmental
Statement
6.1.9.3. ES Chapter 9 Figure 9.1.pdf
RC-ALG-FIG-6.1.8.24 Environmental Statement 6.1.8.24. ES Chapter 8 Figure 8.24.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 - J15a Site:
Archaeological Sites, Features and Find-spots
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 10 Figure 10.11 -A5 Tove
Roundabout: Archaeological Sites, Features and
Find Spots
26.10.18 CFA Archaeology
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Appendix 11.1 –
Heritage Assessment
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.2 –
5km Radius Plan
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (key plan)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 1 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 2 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 3 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 4 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 5 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 6 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 7 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.3 –
Heritage Asset Plan SRFI (sheet 8 of 8)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (key plan)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 1 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 2 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 3 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 4 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 5 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 6 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 7 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 8 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 9 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 10 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 11 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 12 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.4 –
Heritage Asset Plan Highways (sheet 13 of 13)
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 11 Figure 11.5 –
LIDAR Plan
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.1 – Milton
Malsor Northamptonshire - Desk Study Report
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.2 – Rail
Central. Milton Malsor, Northamptonshire. Ground Investigation
Report - Main SRFI Site
26.10.18 Hydrock
RC-ALG-FIG-6.1.11.4.11 Environmental
Statement
6.1.11.4.11. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.12 Environmental
Statement
6.1.11.4.12. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.13 Environmental
Statement
6.1.11.4.13. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.5 Environmental
Statement
6.1.11.5. ES Chapter 11 Figure 11.5.pdf
6.1.12.1 Environmental Statement 6.1.12.1. ES Chapter 12 Appendix 12.1.pdf
6.1.12.2 Environmental Statement 6.1.12.2. ES Chapter 12 Appendix 12.2.pdf
RC-ALG-FIG-6.1.11.4.5 Environmental
Statement
6.1.11.4.5. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.6 Environmental
Statement
6.1.11.4.6.ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.7 Environmental
Statement
6.1.11.4.7. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.8 Environmental
Statement
6.1.11.4.8. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.9 Environmental
Statement
6.1.11.4.9. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.10 Environmental
Statement
6.1.11.4.10. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.3.8 Environmental
Statement
6.1.11.3.8. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.4.0 Environmental
Statement
6.1.11.4.0. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.1 Environmental
Statement
6.1.11.4.1. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.2 Environmental
Statement
6.1.11.4.2.ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.3 Environmental
Statement
6.1.11.4.3. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.4.4 Environmental
Statement
6.1.11.4.4. ES Chapter 11 Figure 11.4.pdf
RC-ALG-FIG-6.1.11.3.2 Environmental
Statement
6.1.11.3.2. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.3.3 Environmental
Statement
6.1.11.3.3. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.3.4 Environmental
Statement
6.1.11.3.4. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.3.5 Environmental
Statement
6.1.11.3.5. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.3.6 Environmental
Statement
6.1.11.3.6. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.3.7 Environmental
Statement
6.1.11.3.7. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.10.11.5 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix
10.11.5.pdf
RC-ALG-FIG-6.1.10.11.6 Environmental Statement 6.1.10.11. ES Chapter 10 Appendix
10.11.6.pdf
6.1.11.1 Environmental
Statement
6.1.11.1. ES Chapter 11 Appendix 11.1.pdf
RC-ALG-FIG-6.1.11.2 Environmental
Statement
6.1.11.2. ES Chapter 11 Figure 11.2.pdf
RC-ALG-FIG-6.1.11.3.0 Environmental
Statement
6.1.11.3.0. ES Chapter 11 Figure 11.3.pdf
RC-ALG-FIG-6.1.11.3.1 Environmental
Statement
6.1.11.3.1. ES Chapter 11 Figure 11.3.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.3 – Rail
Central, Milton Malsor. Ground Conditions Desk Study Report,
M1 Junction 15A Improvements
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.4 – Rail
Central SRFI Northamptonshire. Pollution
Prevention Method Statement
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.5 –
Rail Central SRFI Northamptonshire. Materials Management Plan
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.6 –
Rail Central Development, Milton Malsor, Northamptonshire. Soil
Resource Survey
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.7 – Rail
Central. Milton Malsor, Northamptonshire. Ground Investigation
Report - Main Strategic Rail Freight Interchange - Conceptual
Geotechnical Design
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 12 Appendix 12.8 – Rail
Central. Milton Malsor, Northamptonshire. Ground Investigation
Report - Main Strategic Rail Freight Interchange - Remediation
Method Statement
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 13 Appendix 13.1 - Flood
Risk Assessment, Hydraulic Modelling and
Drainage Strategy Report (Part 1 and 2)
26.10.18 Hydrock
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14 Annex A –
(Part 1) Main Site Background Data Search
Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14 Annex A –
(Part 2) J15a Background Data Search
Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex B – Annex Phase 1 Habitat Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex C – Phase 2 Botany and NVC Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex D – Hedgerow Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement - Chapter 14 Appendix 14
Annex E – (Part 1) Bat Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex E – (Part 2) Bat Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex E – (Part 2) Bat Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex F – Reptiles Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Appendix 14
Annex G – Otter and Water Vole Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex H – Breeding Bird Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex I – Golden Plover Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex J – Great Crested Newt Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex K – Invertebrate Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex L – Aquatic Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex M – Veteran Tree Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental statement – Chapter 14 Appendix 14
Annex N – Badger Survey Report
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.1 – Study Area 26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.2a – Statutory
Designated Sites
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.2b – Non-
Statutory Designated Sites
26.10.18 RSK
6.1.14.15 ES Chapter 14 Figure 14.1.pdf
6.1.14.16 ES Chapter 14 Figure 14.2a.pdf
6.1.14.17 ES Chapter 14 Figure 14.2b.pdf
6.1.14.9 Environmental
Statement
6.1.14.9. ES Chapter 14 Appendix 14 I.pdf
6.1.14.10 Environmental
Statement
6.1.14.10. ES Chapter 14 Appendix 14 J.pdf
6.1.14.11 Environmental
Statement
6.1.14.11. ES Chapter 14 Appendix 14 K.pdf
6.1.14.12 Environmental
Statement
6.1.14.12. ES Chapter 14 Appendix 14 L.pdf
6.1.14.13 Environmental
Statement
6.1.14.13. ES Chapter 14 Appendix 14
M.pdf
6.1.14.14 Environmental
Statement
6.1.14.14. ES Chapter 14 Appendix 14 N.pdf
6.1.14.5 Environmental
Statement
6.1.14.5. ES Chapter 14 Appendix 14 E
(Part
1).pdf6.1.14.5 Environmental
Statement
6.1.14.5. ES Chapter 14 Appendix 14 E
(Part
2).pdf6.1.14.5 Environmental
Statement
6.1.14.5. ES Chapter 14 Appendix 14 E
(Part
3).pdf6.1.14.6 Environmental
Statement
6.1.14.6. ES Chapter 14 Appendix 14 F.pdf
6.1.14.7 Environmental
Statement
6.1.14.7. ES Chapter 14 Appendix 14 G.pdf
6.1.14.8 Environmental
Statement
6.1.14.8. ES Chapter 14 Appendix 14 H.pdf
6.1.13.1 Environmental Statement 6.1.13.1. ES Chapter 13 Appendix 13.1.pdf
6.1.14.1 Environmental Statement 6.1.14.1. ES Chapter 14 Appendix 14 A Part
1.pdf
6.1.14.1 Environmental Statement 6.1.14.1. ES Chapter 14 Appendix 14 A Part
2.pdf
6.1.14.2 Environmental
Statement
6.1.14.2. ES Chapter 14 Appendix 14 B.pdf
6.1.14.3 Environmental
Statement
6.1.14.3. ES Chapter 14 Appendix 14 C.pdf
6.1.14.4 Environmental
Statement
6.1.14.4. ES Chapter 14 Appendix 14 D.pdf
6.1.12.3 Environmental Statement 6.1.12.3. ES Chapter 12 Appendix 12.3.pdf
6.1.12.4 Environmental Statement 6.1.12.4. ES Chapter 12 Appendix 12.4.pdf
6.1.12.5 Environmental Statement 6.1.12.5. ES Chapter 12 Appendix 12.5.pdf
6.1.12.6 Environmental Statement 6.1.12.6. ES Chapter 12 Appendix 12.6.pdf
6.1.12.7 Environmental Statement 6.1.12.7. ES Chapter 12 Appendix 12.7.pdf
6.1.12.8 Environmental Statement 6.1.12.8. ES Chapter 12 Appendix 12.8.pdf
6.1.14.15
6.1.14.16
6.1.14.17
Environmental
Statement
Environmental
Statement
Environmental
Statement
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1
Habitat Survey (Map 1 of 5)
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1
Habitat Survey (Map 2 of 5)
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1
Habitat Survey (Map 3 of 5)
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1
Habitat Survey (Map 4 of 5)
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 14 Figure 14.3 – Phase 1
Habitat Survey (Map 5 of 5)
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Gantry
Crane ZTV
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Grade
Separated Junction ZTV
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Warehousing Buildings ZTV
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Container Storage ZTV
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Main
SRFI Site Representative Viewpoint Locations
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Junction 15a Representative Viewpoint Locations
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Main
SRFI Site Landscape Context
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Junction 15a Landscape context
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Landscape Policy and Designations Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Landscape Policy and Designations Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – National
Landscape Character
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – County
Landscape Character
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Topography
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Main
SRFI Site Residential Receptors
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.2 -
Landscape Character Assessments and Studies
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7
(Foreground Mitigation Omitted) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7
(Foreground Mitigation Omitted) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7
(Foreground Mitigation Omitted) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7 (With
Foreground Mitigation) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7 (With
Foreground Mitigation) Sheet 2
26.10.18 RSK
6.1.15.3.3.2. ES Chapter 15 Figure V1 PP
Y1 S2.pdf
RC-ALG-FIG-6.1.15.3.3.3 Environmental Statement 6.1.15.3.3.3. ES Chapter 15 Figure V1 PP
Y1 S3.pdf
RC-ALG-FIG-6.1.15.3.4.1 Environmental Statement 6.1.15.3.4.1. ES Chapter 15 Figure V1 PP
Y7 (FMO) S1.pdf
RC-ALG-FIG-6.1.15.3.4.2 Environmental Statement 6.1.15.3.4.2. ES Chapter 15 Figure V1 PP
Y7 (FMO) S2.pdf
RC-ALG-FIG-6.1.15.3.4.3 Environmental Statement 6.1.15.3.4.3. ES Chapter 15 Figure V1 PP
Y7 (FMO) S3.pdf
RC-ALG-FIG-6.1.15.3.5.1 Environmental Statement 6.1.15.3.5.1. ES Chapter 15 Figure V1 PP
Y7 (WFM) S1.pdf
RC-ALG-FIG-6.1.15.3.5.2 Environmental Statement 6.1.15.3.5.2. ES Chapter 15 Figure V1 PP
Y7 (WFM) S2.pdf
6.1.15.1.11. ES Chapter 15 Figure CLC.pdf
RC-ALG-FIG-6.1.15.1.12 Environmental
Statement
6.1.15.1.12. ES Chapter 15 Figure Topo.pdf
RC-ALG-FIG-6.1.15.1.13 Environmental
Statement
6.1.15.1.13. ES Chapter 15 Figure M SRFI
SRR.pdf
6.1.15.2 Environmental Statement 6.1.15.2. ES Chapter 15 Appendix 15.2.pdf
RC-ALG-FIG-6.1.15.3.1 Environmental
Statement
6.1.15.3.1. ES Chapter 15 Figure V1
LP&D.pdf
RC-ALG-FIG-6.1.15.3.2 Environmental
Statement
6.1.15.3.2.ES Chapter 15 Figure V1 BP.pdf
RC-ALG-FIG-6.1.15.3.3.1 Environmental Statement 6.1.15.3.3.1. ES Chapter 15 Figure V1 PP
Y1 S1.pdf
6.1.15.1.5. ES Chapter 15 Figure M SRFI S
R V
L.pdfRC-ALG-FIG-6.1.15.1.6 Environmental
Statement
6.1.15.1.6. ES Chapter 15 Figure J15a R V
L.pdf
RC-ALG-FIG-6.1.15.1.7 Environmental
Statement
6.1.15.1.7. ES Chapter 15 Figure M SRFI S
L
C.pdfRC-ALG-FIG-6.1.15.1.8 Environmental
Statement
6.1.15.1.8. ES Chapter 15 Figure J15a L
C.pdf
RC-ALG-FIG-6.1.15.1.9.1 Environmental
Statement
6.1.15.1.9.1. ES Chapter 15 Figure LPandD
Sheet 1.pdf
RC-ALG-FIG-6.1.15.1.9.2 Environmental
Statement
6.1.15.1.9.2. ES Chapter 15 Figure LPandD
Sheet 2.pdf
RC-ALG-FIG-6.1.15.1.10 Environmental
Statement
6.1.15.1.10. ES Chapter 15 Figure NLC.pdf
6.1.15.1.1. ES Chapter 15 Figure GC
ZTV.pdf
6.1.14.18 ES Chapter 14 Figure 14.3 Map
1.pdf
6.1.14.19 ES Chapter 14 Figure 14.3 Map
2.pdf
6.1.14.20 ES Chapter 14 Figure 14.3 Map
3.pdf
6.1.14.21 ES Chapter 14 Figure 14.3 Map
4.pdf
6.1.14.22 ES Chapter 14 Figure 14.3 Map
5.pdf
RC-ALG-FIG-6.1.15.1.2 Environmental
Statement
6.1.15.1.2. ES Chapter 15 Figure GS
Junction
ZTV.pdfRC-ALG-FIG-6.1.15.1.3 Environmental
Statement
6.1.15.1.3. ES Chapter 15 Figure WB
ZTV.pdf
RC-ALG-FIG-6.1.15.1.4 Environmental
Statement
6.1.15.1.4. ES Chapter 15 Figure CS
ZTV.pdf
6.1.14.18
6.1.14.19
6.1.14.20
6.1.14.21
6.1.14.22
Environmental
Statement
Environmental
Statement
Environmental
Statement
Environmental
Statement
Environmental
Statement
RC-ALG-FIG-6.1.15.1.1 Environmental
Statement
RC-ALG-FIG-6.1.15.1.5 Environmental
Statement
RC-ALG-FIG-6.1.15.1.11 Environmental
Statement
RC-ALG-FIG-6.1.15.3.3.2 Environmental Statement
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7 (With
Foreground Mitigation) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 15
(Foreground Mitigation Omitted) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Parameters Photomontage Year 15 (Foreground
Mitigation Omitted) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Parameters Photomontage Year 15 (Foreground
Mitigation Omitted) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 15 (With
Foreground Mitigation) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 15 (With
Foreground Mitigation) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 15 (With
Foreground Mitigation) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 7
(Foreground Mitigation Omitted) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 7
(Foreground Mitigation Omitted) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 7
(Foreground Mitigation Omitted) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7 (With
Foreground Mitigation) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7 (With
Foreground Mitigation) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Parameters Photomontage Year 7 (With
Foreground Mitigation) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 15
(Foreground Mitigation Omitted) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Illustrative Photomontage Year 15 (Foreground
Mitigation Omitted) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Illustrative Photomontage Year 15 (Foreground
Mitigation Omitted) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 1 Illustrative Photomontage Year 15 (With Foreground
Mitigation) Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 15 (With
Foreground Mitigation) Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 1
Illustrative Photomontage Year 15 (With
Foreground Mitigation) Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 2 Location Plan and Data
26.10.18 RSK
RC-ALG-FIG-6.1.15.3.12.3 Environmental Statement 6.1.15.3.12.3. ES Chapter 15 Figure V1 IP
Y15 (WFM) S3.pdf
RC-ALG-FIG-6.1.15.3.13 Environmental
Statement
6.1.15.3.13. ES Chapter 15 Figure V2
LP&D.pdf
6.1.15.3.10.2. ES Chapter 15 Figure V1 PP
Y7 (WFM) S2.pdf
RC-ALG-FIG-6.1.15.3.10.3 Environmental Statement 6.1.15.3.10.3. ES Chapter 15 Figure V1 PP
Y7 (WFM) S3.pdf
RC-ALG-FIG-6.1.15.3.11.1 Environmental Statement 6.1.15.3.11.1. ES Chapter 15 Figure V1 IP
Y15 (FMO) S1.pdf
RC-ALG-FIG-6.1.15.3.11.2 Environmental Statement 6.1.15.3.11.2. ES Chapter 15 Figure V1 IP
Y15 (FMO) S2.pdf
RC-ALG-FIG-6.1.15.3.11.3 Environmental Statement 6.1.15.3.11.3. ES Chapter 15 Figure V1 IP
Y15 (FMO) S3.pdf
RC-ALG-FIG-6.1.15.3.12.1 Environmental Statement 6.1.15.3.12.1. ES Chapter 15 Figure V1 IP
Y15 (WFM) S1.pdf
RC-ALG-FIG-6.1.15.3.12.2 Environmental Statement 6.1.15.3.12.2. ES Chapter 15 Figure V1 IP
Y15 (WFM) S2.pdf
6.1.15.3.8.1. ES Chapter 15 Figure V1 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.8.2 Environmental Statement 6.1.15.3.8.2. ES Chapter 15 Figure V1 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.8.3 Environmental Statement 6.1.15.3.8.3. ES Chapter 15 Figure V1 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.9.1 Environmental Statement 6.1.15.3.9.1. ES Chapter 15 Figure V1 IP Y7
(FMO) S1.pdf
RC-ALG-FIG-6.1.15.3.9.2 Environmental Statement 6.1.15.3.9.2. ES Chapter 15 Figure V1 IP Y7
(FMO) S2.pdf
RC-ALG-FIG-6.1.15.3.9.3 Environmental Statement 6.1.15.3.9.3. ES Chapter 15 Figure V1 IP Y7
(FMO) S3.pdf
RC-ALG-FIG-6.1.15.3.10.1 Environmental Statement 6.1.15.3.10.1. ES Chapter 15 Figure V1 PP
Y7 (WFM) S1.pdf
6.1.15.3.5.3. ES Chapter 15 Figure V1 PP
Y7 (WFM) S3.pdf
RC-ALG-FIG-6.1.15.3.6.1 Environmental Statement 6.1.15.3.6.1. ES Chapter 15 Figure V1 PP
Y15 (FMO) S1.pdf
RC-ALG-FIG-6.1.15.3.6.2 Environmental Statement 6.1.15.3.6.2. ES Chapter 15 Figure V1 PP
Y15 (FMO) S2.pdf
RC-ALG-FIG-6.1.15.3.6.3 Environmental Statement 6.1.15.3.6.3. ES Chapter 15 Figure V1 PP
Y15 (FMO) S3.pdf
RC-ALG-FIG-6.1.15.3.7.1 Environmental Statement 6.1.15.3.7.1. ES Chapter 15 Figure V1 PP
Y15 (WFM) S1.pdf
RC-ALG-FIG-6.1.15.3.7.2 Environmental Statement 6.1.15.3.7.2. ES Chapter 15 Figure V1 PP
Y15 (WFM) S2.pdf
RC-ALG-FIG-6.1.15.3.7.3 Environmental Statement 6.1.15.3.7.3. ES Chapter 15 Figure V1 PP
Y15 (WFM) S3.pdf
RC-ALG-FIG-6.1.15.3.5.3 Environmental Statement
RC-ALG-FIG-6.1.15.3.8.1 Environmental Statement
RC-ALG-FIG-6.1.15.3.10.2 Environmental Statement
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 2 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 2
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 3 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 3 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Parameters Photomontage Year 7 Sheet
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Parameters Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Parameters Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Parameters Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 3
Illustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 4 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 4 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Parameters Photomontage Year 15 Sheet 3
26.10.18 RSK
RC-ALG-FIG-6.1.15.3.28.3 Environmental Statement 6.1.15.3.28.3. ES Chapter 15 VP4 PP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.29.1 Environmental Statement 6.1.15.3.29.1. ES Chapter 15 VP4 PP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.29.2 Environmental Statement 6.1.15.3.29.2. ES Chapter 15 VP4 PP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.29.3 Environmental Statement 6.1.15.3.29.3. ES Chapter 15 VP4 PP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.26 Environmental
Statement
6.1.15.3.26. ES Chapter 15 VP4 BP.pdf
RC-ALG-FIG-6.1.15.3.27.1 Environmental Statement 6.1.15.3.27.1. ES Chapter 15 VP4 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.27.2 Environmental Statement 6.1.15.3.27.2. ES Chapter 15 VP4 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.27.3 Environmental Statement 6.1.15.3.27.3. ES Chapter 15 VP4 PP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.28.1 Environmental Statement 6.1.15.3.28.1. ES Chapter 15 VP4 PP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.28.2 Environmental Statement 6.1.15.3.28.2. ES Chapter 15 VP4 PP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.22.2 Environmental Statement 6.1.15.3.22.2. ES Chapter 15 VP3 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.23.1 Environmental Statement 6.1.15.3.23.1. ES Chapter 15 VP3 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.23.2 Environmental Statement 6.1.15.3.23.2. ES Chapter 15 VP3 IP Y2
S2.pdf
RC-ALG-FIG-6.1.15.3.24.1 Environmental Statement 6.1.15.3.24.1. ES Chapter 15 VP3 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.24.2 Environmental Statement 6.1.15.3.24.2. ES Chapter 15 VP3 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.25 Environmental
Statement
6.1.15.3.25. ES Chapter 15 VP4 LP.pdf
RC-ALG-FIG-6.1.15.3.19.2 Environmental Statement 6.1.15.3.19.2. ES Chapter 15 Figure VP3
PP Y1 S2.pdf
RC-ALG-FIG-6.1.15.3.20.1 Environmental Statement 6.1.15.3.20.1. ES Chapter 15 Figure VP3
PP Y7 S1.pdf
RC-ALG-FIG-6.1.15.3.20.2 Environmental Statement 6.1.15.3.20.2. ES Chapter 15 Figure VP3
PP Y7 S2.pdf
RC-ALG-FIG-6.1.15.3.21.1 Environmental Statement 6.1.15.3.21.1. ES Chapter 15 Figure VP3
PP Y15 S1.pdf
RC-ALG-FIG-6.1.15.3.21.2 Environmental Statement 6.1.15.3.21.2. ES Chapter 15 Figure VP3
PP Y15 S2.pdf
RC-ALG-FIG-6.1.15.3.22.1 Environmental Statement 6.1.15.3.22.1. ES Chapter 15 VP3 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.16.1 Environmental Statement 6.1.15.3.16.1. ES Chapter 15 Figure VP2 IP
Y1
S1.pdfRC-ALG-FIG-6.1.15.3.16.2 Environmental Statement 6.1.15.3.16.2. ES Chapter 15 Figure VP2 IP
Y1
S2.pdfRC-ALG-FIG-6.1.15.3.16.3 Environmental Statement 6.1.15.3.16.3. ES Chapter 15 Figure VP2 IP
Y1
S3.pdfRC-ALG-FIG-6.1.15.3.17 Environmental
Statement
6.1.15.3.17. ES Chapter 15 Figure VP3
LP.pdf
RC-ALG-FIG-6.1.15.3.18 Environmental
Statement
6.1.15.3.18. ES Chapter 15 Figure VP3
BP.pdf
RC-ALG-FIG-6.1.15.3.19.1 Environmental Statement 6.1.15.3.19.1. ES Chapter 15 Figure PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.14 Environmental
Statement
6.1.15.3.14. ES Chapter 15 Figure V2
BP.pdf
RC-ALG-FIG-6.1.15.3.15.1 Environmental Statement 6.1.15.3.15.1. ES Chapter 15 Figure V2 PP
Y1 S1.pdf
RC-ALG-FIG-6.1.15.3.15.2 Environmental Statement 6.1.15.3.15.2. ES Chapter 15 Figure V2 PP
Y1 S2.pdf
RC-ALG-FIG-6.1.15.3.15.3 Environmental Statement 6.1.15.3.15.3. ES Chapter 15 Figure V2 PP
Y1 S3.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 4
Illustrative Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 5 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 5 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Viewpoint 5
Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Viewpoint 5
Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Viewpoint 5
Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Viewpoint 5
Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Viewpoint 5
Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Parameters Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5
Illustrative Photomontage Year 15 Sheet 3
26.10.18 RSK
RC-ALG-FIG-6.1.15.3.40.1 Environmental Statement 6.1.15.3.40.1. ES Chapter 15 VP5 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.40.2 Environmental Statement 6.1.15.3.40.2. ES Chapter 15 VP5 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.40.3 Environmental Statement 6.1.15.3.40.3. ES Chapter 15 VP5 IP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.38.1 Environmental Statement 6.1.15.3.38.1. ES Chapter 15 VP5 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.38.2 Environmental Statement 6.1.15.3.38.2. ES Chapter 15 VP5 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.38.3 Environmental Statement 6.1.15.3.38.3. ES Chapter 15 VP5 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.39.1 Environmental Statement 6.1.15.3.39.1. ES Chapter 15 VP5 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.39.2 Environmental Statement 6.1.15.3.39.2. ES Chapter 15 VP5 IP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.39.3 Environmental Statement 6.1.15.3.39.3. ES Chapter 15 VP5 IP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.36.1 Environmental Statement 6.1.15.3.36.1. ES Chapter 15 VP5 PP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.36.2 Environmental Statement 6.1.15.3.36.2. ES Chapter 15 VP5 PP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.36.3 Environmental Statement 6.1.15.3.36.3. ES Chapter 15 VP5 PP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.37.1 Environmental Statement 6.1.15.3.37.1. ES Chapter 15 VP5 PP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.37.2 Environmental Statement 6.1.15.3.37.2. ES Chapter 15 VP5 PP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.37.3 Environmental Statement 6.1.15.3.37.3. ES Chapter 15 VP5 PP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.32.3 Environmental Statement 6.1.15.3.32.3. ES Chapter 15 VP4 IP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.33 Environmental
Statement
6.1.15.3.33. ES Chapter 15 VP5 LP.pdf
RC-ALG-FIG-6.1.15.3.34 Environmental
Statement
6.1.15.3.34. ES Chapter 15 VP5 BP.pdf
RC-ALG-FIG-6.1.15.3.35.1 Environmental Statement 6.1.15.3.35.1. ES Chapter 15 VP5 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.35.2 Environmental Statement 6.1.15.3.35.2. ES Chapter 15 VP5 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.35.3 Environmental Statement 6.1.15.3.35.3. ES Chapter 15 VP5 PP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.30.3 Environmental Statement 6.1.15.3.30.3. ES Chapter 15 VP4 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.31.1 Environmental Statement 6.1.15.3.31.1. ES Chapter 15 VP4 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.31.2 Environmental Statement 6.1.15.3.31.2. ES Chapter 15 VP4 IP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.31.3 Environmental Statement 6.1.15.3.31.3. ES Chapter 15 VP4 IP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.32.1 Environmental Statement 6.1.15.3.32.1. ES Chapter 15 VP4 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.32.2 Environmental Statement 6.1.15.3.32.2. ES Chapter 15 VP4 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.30.1 Environmental Statement 6.1.15.3.30.1. ES Chapter 15 VP4 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.30.2 Environmental Statement 6.1.15.3.30.2. ES Chapter 15 VP4 IP Y1
S2.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 6 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 6 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6
llustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 6
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 7 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 7 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Parameters Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
llustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7
Illustrative Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 8 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 8 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 8 Parameters Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 8 Illustrative Photomontage Year 1
26.10.18 RSK
RC-ALG-FIG-6.1.15.3.52.3 Environmental Statement 6.1.15.3.52.3. ES Chapter 15 VP7 IP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.53 Environmental
Statement
6.1.15.3.53. ES Chapter 15 VP8 LP.pdf
RC-ALG-FIG-6.1.15.3.54 Environmental
Statement
6.1.15.3.54. ES Chapter 15 VP8 BP.pdf
RC-ALG-FIG-6.1.15.3.55 Environmental
Statement
6.1.15.3.55. ES Chapter 15 VP8 PP Y1.pdf
RC-ALG-FIG-6.1.15.3.56 Environmental
Statement
6.1.15.3.56. ES Chapter 15 VP8 IP Y1.pdf
RC-ALG-FIG-6.1.15.3.50.3 Environmental Statement 6.1.15.3.50.3. ES Chapter 15 VP7 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.51.1 Environmental Statement 6.1.15.3.51.1. ES Chapter 15 VP7 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.51.2 Environmental Statement 6.1.15.3.51.2. ES Chapter 15 VP7 IP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.51.3 Environmental Statement 6.1.15.3.51.3. ES Chapter 15 VP7 IP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.52.1 Environmental Statement 6.1.15.3.52.1. ES Chapter 15 VP7 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.52.2 Environmental Statement 6.1.15.3.52.2. ES Chapter 15 VP7 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.48.3 Environmental Statement 6.1.15.3.48.3. ES Chapter 15 VP7 PP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.49.1 Environmental Statement 6.1.15.3.49.1. ES Chapter 15 VP7 PP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.49.2 Environmental Statement 6.1.15.3.49.2. ES Chapter 15 VP7 PP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.49.3 Environmental Statement 6.1.15.3.49.3. ES Chapter 15 VP7 PP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.50.1 Environmental Statement 6.1.15.3.50.1. ES Chapter 15 VP7 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.50.2 Environmental Statement 6.1.15.3.50.2. ES Chapter 15 VP7 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.46 Environmental
Statement
6.1.15.3.46. ES Chapter 15 VP7 BP.pdf
RC-ALG-FIG-6.1.15.3.47.1 Environmental Statement 6.1.15.3.47.1. ES Chapter 15 VP7 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.47.2 Environmental Statement 6.1.15.3.47.2. ES Chapter 15 VP7 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.47.3 Environmental Statement 6.1.15.3.47.3. ES Chapter 15 VP7 PP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.48.1 Environmental Statement 6.1.15.3.48.1. ES Chapter 15 VP7 PP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.48.2 Environmental Statement 6.1.15.3.48.2. ES Chapter 15 VP7 PP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.43.2 Environmental Statement 6.1.15.3.43.2. ES Chapter 15 VP6 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.43.3 Environmental Statement 6.1.15.3.43.3. ES Chapter 15 VP6 PP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.44.1 Environmental Statement 6.1.15.3.44.1. ES Chapter 15 VP6 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.44.2 Environmental Statement 6.1.15.3.44.2. ES Chapter 15 VP6 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.44.3 Environmental Statement 6.1.15.3.44.3. ES Chapter 15 VP6 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.45 Environmental
Statement
6.1.15.3.45. ES Chapter 15 VP7 LP.pdf
RC-ALG-FIG-6.1.15.3.41 Environmental
Statement
6.1.15.3.41. ES Chapter 15 VP6 LP.pdf
RC-ALG-FIG-6.1.15.3.42 Environmental
Statement
6.1.15.3.42. ES Chapter 15 VP6 BP.pdf
RC-ALG-FIG-6.1.15.3.43.1 Environmental Statement 6.1.15.3.43.1. ES Chapter 15 VP6 PP Y1
S1.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 10 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 10 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 10 Parameters Wireline Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 11 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 11 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 11 Parameters Wireline Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 12 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 12 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 12
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 13 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 13 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 13 Parameters Wireline Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 13 Parameters Wireline Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 13
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 14 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 14 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 14 Parameters Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 14 Illustrative Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Parameters Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Parameters Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Parameters Wireframe Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Illustrative Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Illustrative Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Illustrative Photomontage Year 15
26.10.18 RSKRC-ALG-FIG-6.1.15.3.83 Environmental
Statement
6.1.15.3.83. ES Chapter 15 VP15 IP
Y15.pdf
RC-ALG-FIG-6.1.15.3.77 Environmental
Statement
6.1.15.3.77. ES Chapter 15 VP15 BP.pdf
RC-ALG-FIG-6.1.15.3.78 Environmental
Statement
6.1.15.3.78. ES Chapter 15 VP15 PP Y1.pdf
RC-ALG-FIG-6.1.15.3.79 Environmental
Statement
6.1.15.3.79. ES Chapter 15 VP15 PP Y7.pdf
RC-ALG-FIG-6.1.15.3.80 Environmental
Statement
6.1.15.3.80. ES Chapter 15 VP15 Pp
Y15.pdf
RC-ALG-FIG-6.1.15.3.81 Environmental
Statement
6.1.15.3.81. ES Chapter 15 VP15 IP Y1.pdf
RC-ALG-FIG-6.1.15.3.82 Environmental
Statement
6.1.15.3.82. ES Chapter 15 VP15 IP Y7.pdf
RC-ALG-FIG-6.1.15.3.71.2 Environmental Statement 6.1.15.3.71.2. ES Chapter 15 VP13 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.72 Environmental
Statement
6.1.15.3.72. ES Chapter 15 VP14 LP.pdf
RC-ALG-FIG-6.1.15.3.73 Environmental
Statement
6.1.15.3.73. ES Chapter 15 VP14 BP.pdf
RC-ALG-FIG-6.1.15.3.74 Environmental
Statement
6.1.15.3.74. ES Chapter 15 VP14 PP Y1.pdf
RC-ALG-FIG-6.1.15.3.75 Environmental
Statement
6.1.15.3.75. ES Chapter 15 VP14 IP Y1.pdf
RC-ALG-FIG-6.1.15.3.76 Environmental
Statement
6.1.15.3.76. ES Chapter 15 VP15 LP.pdf
RC-ALG-FIG-6.1.15.3.68 Environmental
Statement
6.1.15.3.68. ES Chapter 15 VP13 BP.pdf
RC-ALG-FIG-6.1.15.3.69.1 Environmental Statement 6.1.15.3.69.1. ES Chapter 15 VP13 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.69.2 Environmental Statement 6.1.15.3.69.2. ES Chapter 15 VP13 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.70.1 Environmental
Statement
6.1.15.3.70.1. ES Chapter 15 VP13 PW Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.70.2 Environmental
Statement
6.1.15.3.70.2. ES Chapter 15 VP13 PW Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.71.1 Environmental Statement 6.1.15.3.71.1. ES Chapter 15 VP13 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.64 Environmental
Statement
6.1.15.3.64. ES Chapter 15 VP12 BP.pdf
RC-ALG-FIG-6.1.15.3.65.1 Environmental Statement 6.1.15.3.65.1. ES Chapter 15 VP12 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.65.2 Environmental Statement 6.1.15.3.65.2. ES Chapter 15 VP12 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.66.1 Environmental Statement 6.1.15.3.66.1. ES Chapter 15 VP12 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.66.2 Environmental Statement 6.1.15.3.66.2. ES Chapter 15 VP12 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.67 Environmental
Statement
6.1.15.3.67. ES Chapter 15 VP13 LP.pdf
RC-ALG-FIG-6.1.15.3.58 Environmental
Statement
6.1.15.3.58. ES Chapter 15 VP10 BP.pdf
RC-ALG-FIG-6.1.15.3.59 Environmental
Statement
6.1.15.3.59. ES Chapter 15 VP10 PW
Y1.pdf
RC-ALG-FIG-6.1.15.3.60 Environmental
Statement
6.1.15.3.60. ES Chapter 15 VP11 LP.pdf
RC-ALG-FIG-6.1.15.3.61 Environmental
Statement
6.1.15.3.61. ES Chapter 15 VP11 BP.pdf
RC-ALG-FIG-6.1.15.3.62 Environmental
Statement
6.1.15.3.62. ES Chapter 15 VP11 PW
Y1.pdf
RC-ALG-FIG-6.1.15.3.63 Environmental
Statement
6.1.15.3.63. ES Chapter 15 VP12 LP.pdf
RC-ALG-FIG-6.1.15.3.57 Environmental
Statement
6.1.15.3.57. ES Chapter 15 VP10 LP.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 16 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 16 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Parameters Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Parameters Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Parameters Photomontage Year 15 Sheet
1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Parameters Photomontage Year 15 Sheet
2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 16
Illustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 17 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 17 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 17 Parameters Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 15 Sheet
2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Parameters Photomontage Year 15 Sheet
3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
RC-ALG-FIG-6.1.15.3.96.2 Environmental Statement 6.1.15.3.96.2. ES Chapter 15 VP17 PP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.96.3 Environmental Statement 6.1.15.3.96.3. ES Chapter 15 VP17 PP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.97.1 Environmental Statement 6.1.15.3.97.1. ES Chapter 15 VP17 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.97.2 Environmental Statement 6.1.15.3.97.2. ES Chapter 15 VP17 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.97.3 Environmental Statement 6.1.15.3.97.3. ES Chapter 15 VP17 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.98.1 Environmental Statement 6.1.15.3.98.1. ES Chapter 15 VP17 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.94.2 Environmental Statement 6.1.15.3.94.2. ES Chapter 15 VP17 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.94.3 Environmental Statement 6.1.15.3.94.3. ES Chapter 15 VP17 PP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.95.1 Environmental Statement 6.1.15.3.95.1. ES Chapter 15 VP17 PP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.95.2 Environmental Statement 6.1.15.3.95.2. ES Chapter 15 VP17 PP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.95.3 Environmental Statement 6.1.15.3.95.3. ES Chapter 15 VP17 PP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.96.1 Environmental Statement 6.1.15.3.96.1. ES Chapter 15 VP17 PP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.90.2 Environmental Statement 6.1.15.3.90.2. ES Chapter 15 VP16 IP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.91.1 Environmental Statement 6.1.15.3.91.1. ES Chapter 15 VP16 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.91.2 Environmental Statement 6.1.15.3.91.2. ES Chapter 15 VP16 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.92 Environmental
Statement
6.1.15.3.92. ES Chapter 15 VP17 LP.pdf
RC-ALG-FIG-6.1.15.3.93 Environmental
Statement
6.1.15.3.93. ES Chapter 15 VP17 BP.pdf
RC-ALG-FIG-6.1.15.3.94.1 Environmental Statement 6.1.15.3.94.1. ES Chapter 15 VP17 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.87.2 Environmental Statement 6.1.15.3.87.2. ES Chapter 15 VP16 PP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.88.1 Environmental Statement 6.1.15.3.88.1. ES Chapter 15 VP16 PP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.88.2 Environmental Statement 6.1.15.3.88.2. ES Chapter 15 VP16 PP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.89.1 Environmental Statement 6.1.15.3.89.1. ES Chapter 15 VP16 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.89.2 Environmental Statement 6.1.15.3.89.2. ES Chapter 15 VP16 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.90.1 Environmental Statement 6.1.15.3.90.1. ES Chapter 15 VP16 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.84 Environmental
Statement
6.1.15.3.84. ES Chapter 15 VP16 LP.pdf
RC-ALG-FIG-6.1.15.3.85 Environmental
Statement
6.1.15.3.85. ES Chapter 15 VP16 BP.pdf
RC-ALG-FIG-6.1.15.3.86.1 Environmental Statement 6.1.15.3.86.1. ES Chapter 15 VP16 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.86.2 Environmental Statement 6.1.15.3.86.2. ES Chapter 15 VP16 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.87.1 Environmental Statement 6.1.15.3.87.1. ES Chapter 15 VP16 PP Y7
S1.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Illustrative Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Parameters Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Parameters Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Parameters Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Illustrative Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Illustrative Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Illustrative Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 19 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 19 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 19 Parameters Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 19 Illustrative Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 20 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 20 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 20 Parameters Wireline Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Parameters Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Parameters Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Parameters Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Illustrative Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Illustrative Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Illustrative Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 22 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 22 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 22 Parameters Wireline Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 22 Parameters Wireline Year 1 sheet 2
26.10.18 RSK
RC-ALG-FIG-6.1.15.3.125.1 Environmental
Statement
6.1.15.3.125.1. ES Chapter 15 VP22 PW Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.125.2 Environmental
Statement
6.1.15.3.125.2. ES Chapter 15 VP22 PW Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.119 Environmental
Statement
6.1.15.3.119. ES Chapter 15 VP21 PP
Y15.pdf
RC-ALG-FIG-6.1.15.3.120 Environmental
Statement
6.1.15.3.120. ES Chapter 15 VP21 IP
Y1.pdf
RC-ALG-FIG-6.1.15.3.121 Environmental
Statement
6.1.15.3.121. ES Chapter 15 VP21 IP
Y7.pdf
RC-ALG-FIG-6.1.15.3.122 Environmental
Statement
6.1.15.3.122. ES Chapter 15 VP21 IP
Y15.pdf
RC-ALG-FIG-6.1.15.3.123 Environmental
Statement
6.1.15.3.123. ES Chapter 15 VP22 LP.pdf
RC-ALG-FIG-6.1.15.3.124 Environmental
Statement
6.1.15.3.124. ES Chapter 15 VP22 BP.pdf
RC-ALG-FIG-6.1.15.3.113 Environmental
Statement
6.1.15.3.113. ES Chapter 15 VP20 BP.pdf
RC-ALG-FIG-6.1.15.3.114 Environmental
Statement
6.1.15.3.114. ES Chapter 15 VP20 PW
Y1.pdf
RC-ALG-FIG-6.1.15.3.115 Environmental
Statement
6.1.15.3.115. ES Chapter 15 VP21 LP.pdf
RC-ALG-FIG-6.1.15.3.116 Environmental
Statement
6.1.15.3.116. ES Chapter 15 VP21 BP.pdf
RC-ALG-FIG-6.1.15.3.117 Environmental
Statement
6.1.15.3.117. ES Chapter 15 VP21 PP
Y1.pdf
RC-ALG-FIG-6.1.15.3.118 Environmental
Statement
6.1.15.3.118. ES Chapter 15 VP21 PP
Y7.pdf
RC-ALG-FIG-6.1.15.3.107 Environmental
Statement
6.1.15.3.107. ES Chapter 15 VP18 IP
Y15.pdf
RC-ALG-FIG-6.1.15.3.108 Environmental
Statement
6.1.15.3.108. ES Chapter 15 VP19 LP.pdf
RC-ALG-FIG-6.1.15.3.109 Environmental
Statement
6.1.15.3.109. ES Chapter 15 VP19 BP.pdf
RC-ALG-FIG-6.1.15.3.110 Environmental
Statement
6.1.15.3.110. ES Chapter 15 VP19 PP.pdf
RC-ALG-FIG-6.1.15.3.111 Environmental
Statement
6.1.15.3.111. ES Chapter 15 VP19 IP
Y1.pdf
RC-ALG-FIG-6.1.15.3.112 Environmental
Statement
6.1.15.3.112. ES Chapter 15 VP20 LP.pdf
RC-ALG-FIG-6.1.15.3.101 Environmental
Statement
6.1.15.3.101. ES Chapter 15 VP18 BP.pdf
RC-ALG-FIG-6.1.15.3.102 Environmental
Statement
6.1.15.3.102. ES Chapter 15 VP18 PP
Y1.pdf
RC-ALG-FIG-6.1.15.3.103 Environmental
Statement
6.1.15.3.103. ES Chapter 15 VP18 PP
Y7.pdf
RC-ALG-FIG-6.1.15.3.104 Environmental
Statement
6.1.15.3.104. ES Chapter 15 VP18 PP
Y15.pdf
RC-ALG-FIG-6.1.15.3.105 Environmental
Statement
6.1.15.3.105. ES Chapter 15 VP18 IP
Y1.pdf
RC-ALG-FIG-6.1.15.3.106 Environmental
Statement
6.1.15.3.106. ES Chapter 15 VP18 IP
Y7.pdf
RC-ALG-FIG-6.1.15.3.98.2 Environmental Statement 6.1.15.3.98.2. ES Chapter 15 VP17 IP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.98.3 Environmental Statement 6.1.15.3.98.3. ES Chapter 15 VP17 IP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.99.1 Environmental Statement 6.1.15.3.99.1. ES Chapter 15 VP17 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.99.2 Environmental Statement 6.1.15.3.99.2. ES Chapter 15 VP17 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.99.3 Environmental Statement 6.1.15.3.99.3. ES Chapter 15 VP17 IP Y15
S3.pdf
RC-ALG-FIG-6.1.15.3.100 Environmental
Statement
6.1.15.3.100. ES Chapter 15 VP18 LP.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 23 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 23 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 23 Parameters Wireline Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 23 Parameters Wireline Year 1 sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 24 Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 24 Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 15 Sheet
1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 15 Sheet
2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Parameters Photomontage Year 15 Sheet
3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Illustrative Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint A Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint A Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint B Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint B Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint C Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint C Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint D Location Plan and Data
26.10.18 RSK
RC-ALG-FIG-6.1.15.4.5 Environmental
Statement
6.1.15.4.5. ES Chapter 15 VP C LP.pdf
RC-ALG-FIG-6.1.15.4.6 Environmental
Statement
6.1.15.4.6. ES Chapter 15 VP C Baseline
Panorama.pdf
RC-ALG-FIG-6.1.15.4.7 Environmental
Statement
6.1.15.4.7. ES Chapter 15 VP D LPAD.pdf
RC-ALG-FIG-6.1.15.3.136.2 Environmental Statement 6.1.15.3.136.2. ES Chapter 15 VP24 IP Y15
S2.pdf
RC-ALG-FIG-6.1.15.3.136.3 Environmental Statement 6.1.15.3.136.3. ES Chapter 15 VP24 IP Y15
S3.pdf
RC-ALG-FIG-6.1.15.4.1 Environmental
Statement
6.1.15.4.1. ES Chapter 15 VP A LP.pdf
RC-ALG-FIG-6.1.15.4.2 Environmental
Statement
6.1.15.4.2. ES Chapter 15 VP A BP.pdf
RC-ALG-FIG-6.1.15.4.3 Environmental
Statement
6.1.15.4.3. ES Chapter 15 VP B LP.pdf
RC-ALG-FIG-6.1.15.4.4 Environmental
Statement
6.1.15.4.4. ES Chapter 15 VP B BP.pdf
RC-ALG-FIG-6.1.15.3.134.2 Environmental Statement 6.1.15.3.134.2. ES Chapter 15 VP24 IP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.134.3 Environmental Statement 6.1.15.3.134.3. ES Chapter 15 VP24 IP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.135.1 Environmental Statement 6.1.15.3.135.1. ES Chapter 15 VP24 IP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.135.2 Environmental Statement 6.1.15.3.135.2. ES Chapter 15 VP24 IP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.135.3 Environmental Statement 6.1.15.3.135.3. ES Chapter 15 VP24 IP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.136.1 Environmental Statement 6.1.15.3.136.1. ES Chapter 15 VP24 IP Y15
S1.pdf
RC-ALG-FIG-6.1.15.3.132.2 Environmental Statement 6.1.15.3.132.2. ES Chapter 15 VP24 PP Y7
S2.pdf
RC-ALG-FIG-6.1.15.3.132.3 Environmental Statement 6.1.15.3.132.3. ES Chapter 15 VP24 PP Y7
S3.pdf
RC-ALG-FIG-6.1.15.3.133.1 Environmental Statement 6.1.15.3.133.1. ES Chapter 15 VP24 PP
Y15 S1.pdf
RC-ALG-FIG-6.1.15.3.133.2 Environmental Statement 6.1.15.3.133.2. ES Chapter 15 VP24 PP
Y15 S2.pdf
RC-ALG-FIG-6.1.15.3.133.3 Environmental Statement 6.1.15.3.133.3. ES Chapter 15 VP24 PP 15
S3.pdf
RC-ALG-FIG-6.1.15.3.134.1 Environmental Statement 6.1.15.3.134.1. ES Chapter 15 VP24 IP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.129 Environmental
Statement
6.1.15.3.129. ES Chapter 15 VP24 LP.pdf
RC-ALG-FIG-6.1.15.3.130 Environmental
Statement
6.1.15.3.130. ES Chapter 15 VP24 BP.pdf
RC-ALG-FIG-6.1.15.3.131.1 Environmental Statement 6.1.15.3.131.1. ES Chapter 15 VP24 PP Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.131.2 Environmental Statement 6.1.15.3.131.2. ES Chapter 15 VP24 PP Y1
S2.pdf
RC-ALG-FIG-6.1.15.3.131.3 Environmental Statement 6.1.15.3.131.3. ES Chapter 15 VP24 PP Y1
S3.pdf
RC-ALG-FIG-6.1.15.3.132.1 Environmental Statement 6.1.15.3.132.1. ES Chapter 15 VP24 PP Y7
S1.pdf
RC-ALG-FIG-6.1.15.3.126 Environmental
Statement
6.1.15.3.126. ES Chapter 15 VP23 LP.pdf
RC-ALG-FIG-6.1.15.3.127 Environmental
Statement
6.1.15.3.127. ES Chapter 15 VP23 BP.pdf
RC-ALG-FIG-6.1.15.3.128.1 Environmental
Statement
6.1.15.3.128.1. ES Chapter 15 VP23 PW Y1
S1.pdf
RC-ALG-FIG-6.1.15.3.128.2 Environmental
Statement
6.1.15.3.128.2. ES Chapter 15 VP23 PW Y1
S2.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint D Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint E Location Plan and Data
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint E Baseline Panorama
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 5 Night-
time Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 7 Night-
time Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Night-time Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Night-time Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 15 Night-time Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 15 Sheet 2
26.10.18 RSK
RC-ALG-FIG-6.1.15.5.11.1 Environmental Statement 6.1.15.5.11.1. ES Chapter 15 VP17 Y7
S1.pdf
RC-ALG-FIG-6.1.15.5.11.2 Environmental Statement 6.1.15.5.11.2. ES Chapter 15 VP17 Y7
S2.pdf
RC-ALG-FIG-6.1.15.5.11.3 Environmental Statement 6.1.15.5.11.3. ES Chapter 15 VP17 Y7
S3.pdf
RC-ALG-FIG-6.1.15.5.12.1 Environmental Statement 6.1.15.5.12.1. ES Chapter 15 VP 17 Y15
S1.pdf
RC-ALG-FIG-6.1.15.5.12.2 Environmental Statement 6.1.15.5.12.2. ES Chapter 15 VP 17 Y15
S2.pdf
RC-ALG-FIG-6.1.15.5.7 Environmental
Statement
6.1.15.5.7. ES Chapter 15 VP 15 Y1.pdf
RC-ALG-FIG-6.1.15.5.8 Environmental
Statement
6.1.15.5.8. ES Chapter 15 VP 15 Y7.pdf
RC-ALG-FIG-6.1.15.5.9 Environmental
Statement
6.1.15.5.9. ES Chapter 15 VP15 Y15.pdf
RC-ALG-FIG-6.1.15.5.10.1 Environmental Statement 6.1.15.5.10.1. ES Chapter 15 VP 17 Y1
S1.pdf
RC-ALG-FIG-6.1.15.5.10.2 Environmental Statement 6.1.15.5.10.2. ES Chapter 15 VP17 Y1
S2.pdf
RC-ALG-FIG-6.1.15.5.10.3 Environmental Statement 6.1.15.5.10.3. ES Chapter 15 VP17 Y1
S3.pdf
RC-ALG-FIG-6.1.15.5.5.1 Environmental Statement 6.1.15.5.5.1. ES Chapter 15 VP7 Y7 S1.pdf
RC-ALG-FIG-6.1.15.5.5.2 Environmental Statement 6.1.15.5.5.2. ES Chapter 15 VP7 Y7 S2.pdf
RC-ALG-FIG-6.1.15.5.5.3 Environmental Statement 6.1.15.5.5.3. ES Chapter 15 VP7 Y7 S3.pdf
RC-ALG-FIG-6.1.15.5.6.1 Environmental Statement 6.1.15.5.6.1. ES Chapter 15 VP7 Y15
S1.pdf
RC-ALG-FIG-6.1.15.5.6.2 Environmental Statement 6.1.15.5.6.2. ES Chapter 15 VP7 Y15
S2.pdf
RC-ALG-FIG-6.1.15.5.6.3 Environmental Statement 6.1.15.5.6.3. ES Chapter 15 VP 7 Y15
S3.pdf
RC-ALG-FIG-6.1.15.5.3.1 Environmental Statement 6.1.15.5.3.1. ES Chapter 15 VP5 Y15
S1.pdf
RC-ALG-FIG-6.1.15.5.3.2 Environmental Statement 6.1.15.5.3.2. ES Chapter 15 VP5 Y15
S2.pdf
RC-ALG-FIG-6.1.15.5.3.3 Environmental Statement 6.1.15.5.3.3. ES Chapter 15 VP5 Y15
S3.pdf
RC-ALG-FIG-6.1.15.5.4.1 Environmental Statement 6.1.15.5.4.1. ES Chapter 15 VP7 Y1 S1.pdf
RC-ALG-FIG-6.1.15.5.4.2 Environmental Statement 6.1.15.5.4.2. ES Chapter 15 VP7 Y1 S2.pdf
RC-ALG-FIG-6.1.15.5.4.3 Environmental Statement 6.1.15.5.4.3. ES Chapter 15 VP7 Y1 S3.pdf
RC-ALG-FIG-6.1.15.5.1.1 Environmental Statement 6.1.15.5.1.1 ES Chapter 15 VP5 Y1 S1.pdf
RC-ALG-FIG-6.1.15.5.1.2 Environmental Statement 6.1.15.5.1.2. ES Chapter 15 VP 5 Y1 S2.pdf
RC-ALG-FIG-6.1.15.5.1.3 Environmental Statement 6.1.15.5.1.3. ES Chapter 15 VP5 Y1 S3.pdf
RC-ALG-FIG-6.1.15.5.2.1 Environmental Statement 6.1.15.5.2.1. ES Chapter 15 VP 5 Y7 S1.pdf
RC-ALG-FIG-6.1.15.5.2.2 Environmental Statement 6.1.15.5.2.2. ES Chapter 15 VP5 Y7 S2.pdf
RC-ALG-FIG-6.1.15.5.2.3 Environmental Statement 6.1.15.5.2.3. ES Chapter 15 VP5 Y7 S2.pdf
RC-ALG-FIG-6.1.15.4.8 Environmental
Statement
6.1.15.4.8. ES Chapter 15 VP D Baseline
Panorama.pdf
RC-ALG-FIG-6.1.15.4.9 Environmental
Statement
6.1.15.4.9. ES Chapter 15 VP E LPAD.pdf
RC-ALG-FIG-6.1.15.4.10 Environmental
Statement
6.1.15.4.10. ES Chapter 15 VP E Baseline
Panorama.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 17
Night-time Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Night-time Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Night-time Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 18 Night-time Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Night-time Photomontage Year 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Night-time Photomontage Year 7
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure –
Viewpoint 21 Night-time Photomontage Year 15
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 1 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 1 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 1 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 7 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 7 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 7 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 15 Sheet 1
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 15 Sheet 2
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Figure – Viewpoint 24
Night-time Photomontage Year 15 Sheet 3
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.6 –
Representative Viewpoint Assessment
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.7 –
Visual Effects to Residential Receptors
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.8 – Visual
Effects to Users of Recreational Routes & Public
Rights of Way
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.9 –
Visual Effects to Road Users
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 15 Appendix 15.10
– Photographic Surveys & Verifiable Photomontage Methodology
26.10.18 RSK
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.1 –
Glossary of Acoustic Terms
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.2 – Baseline
noise and vibration monitoring locations,
equipment list and calibration details
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.3 – Baseline
noise and vibration monitoring analysis and
results
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.4 –
Construction traffic distribution plan
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.5 –
Road traffic flow data and Basic Noise Level (BNL) calculations
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.6 – Road
traffic Basic Noise Level (BNL) changes
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.7 – Road
traffic operating noise contour plots and tables
results at NSRs
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.8 –
Site construction noise assumptions
26.10.18 Spectrum
6.1.16.5 Environmental Statement 6.1.16.5. ES Chapter 16 Appendix 16.5.pdf
6.1.16.6 Environmental Statement 6.1.16.6. ES Chapter 16 Appendix 16.6.pdf
6.1.16.7 Environmental Statement 6.1.16.7. ES Chapter 16 Appendix 16.7.pdf
6.1.16.8 Environmental
Statement
6.1.16.8. ES Chapter 16 Appendix 16.8.pdf
6.1.15.9 Environmental
Statement
6.1.15.9. ES Chapter 15 Appendix 15.9.pdf
6.1.15.10 Environmental Statement 6.1.15.10. ES Chapter 15 Appendix
15.10.pdf
6.1.16.1 Environmental
Statement
6.1.16.1. ES Chapter 16 Appendix 16.1.pdf
6.1.16.2 Environmental Statement 6.1.16.2. ES Chapter 16 Appendix 16.2.pdf
6.1.16.3 Environmental Statement 6.1.16.3. ES Chapter 16 Appendix 16.3.pdf
6.1.16.4 Environmental
Statement
6.1.16.4. ES Chapter 16 Appendix 16.4.pdf
RC-ALG-FIG-6.1.15.5.21.1 Environmental Statement 6.1.15.5.21.1. ES Chapter 15 VP24 Y15
S1.pdf
RC-ALG-FIG-6.1.15.5.21.2 Environmental Statement 6.1.15.5.21.2. ES Chapter 15 VP24 Y15
S2.pdf
RC-ALG-FIG-6.1.15.5.21.3 Environmental Statement 6.1.15.5.21.3. ES Chapter 15 VP24 Y15
S3.pdf
6.1.15.6 Environmental
Statement
6.1.15.6. ES Chapter 15 Appendix 15.6.pdf
6.1.15.7 Environmental
Statement
6.1.15.7. ES Chapter 15 Appendix 15.7.pdf
6.1.15.8 Environmental Statement 6.1.15.8. ES Chapter 15 Appendix 15.8.pdf
RC-ALG-FIG-6.1.15.5.19.1 Environmental Statement 6.1.15.5.19.1. ES Chapter 15 VP24 Y1
S1.pdf
RC-ALG-FIG-6.1.15.5.19.2 Environmental Statement 6.1.15.5.19.2. ES Chapter 15 VP24 Y1
S2.pdf
RC-ALG-FIG-6.1.15.5.19.3 Environmental Statement 6.1.15.5.19.3. ES Chapter 15 VP24 Y1
S3.pdf
RC-ALG-FIG-6.1.15.5.20.1 Environmental Statement 6.1.15.5.20.1. ES Chapter 15 VP24 Y7
S1.pdf
RC-ALG-FIG-6.1.15.5.20.2 Environmental Statement 6.1.15.5.20.2. ES Chapter 15 VP24 Y7
S2.pdf
RC-ALG-FIG-6.1.15.5.20.3 Environmental Statement 6.1.15.5.20.3. ES Chapter 15 VP24 Y7
S3.pdf
RC-ALG-FIG-6.1.15.5.13 Environmental
Statement
6.1.15.5.13. ES Chapter 15 VP 18 Y1.pdf
RC-ALG-FIG-6.1.15.5.14 Environmental
Statement
6.1.15.5.14. ES Chapter 15 VP 18 Y7.pdf
RC-ALG-FIG-6.1.15.5.15 Environmental
Statement
6.1.15.5.15. ES Chapter 15 VP 18 Y15.pdf
RC-ALG-FIG-6.1.15.5.16 Environmental
Statement
6.1.15.5.16. ES Chapter 15 VP21 Y1.pdf
RC-ALG-FIG-6.1.15.5.17 Environmental
Statement
6.1.15.5.17. ES Chapter 15 VP21 Y7.pdf
RC-ALG-FIG-6.1.15.5.18 Environmental
Statement
6.1.15.5.18. ES Chapter VP21 Y15.pdf
RC-ALG-FIG-6.1.15.5.12.3 Environmental Statement 6.1.15.5.12.3. ES Chapter 15 VP17 Y15
S3.pdf
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.9 –
Site construction noise calculation procedure and tabled results
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.10
– Cumulative effects assessment projects
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.11
– Site operational noise assumptions and calculation procedures
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.12
– Site operational noise prediction results including source
contributions at NSRs
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.13
– Site noise mitigation
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.14
– Consultation
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.15
– Noise and vibration impact to terrestrial ecology
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.16
– Noise and vibration assessment to heritage assets
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Appendix 16.17
– Legislation, Policy and Guidance
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Figure 16.18 –
Study area for operational noise and vibration on main SRFI site
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Figure 16.19 –
Study area for operational noise on J15a
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 16 Figure 16.20 –
Study area for construction noise on J15a
26.10.18 Spectrum
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 17 Appendix 17.1 –
Transport Assessment (including Appendices and Figures A-AB)
26.10.18 TPA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 17 Figure 17.2 –
Agreed Study Area Plan
26.10.18 TPA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 17 Figure 17.3 –
Junction Mitigation Location Plan
26.10.18 TPA
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.1 – Pre-
Development Baseline Survey – Main Site
26.10.18 Hoare Lea
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.2 – Pre-
Development Baseline Survey – Junction 15a
26.10.18 Hoare Lea
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.3 –
Operational Lighting Parameters – Main Site
26.10.18 Hoare Lea
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Figure 19.4 – Operational
Lighting Parameters Plan – Junction 15a
26.10.18 Hoare Lea
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.5 –
Illumination Impact Profile – Main Site
26.10.18 Hoare Lea
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 19 Appendix 19.6 –
Illumination Impact Profile – Junction 15a
26.10.18 Hoare Lea
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 21 Appendix 21.1 –
Rail Central GHG Assessment
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 21 Appendix 21.2 –
Rail Central Freight Emissions
26.10.18 Turley
Environmental Statement Technical Appendices (Part 14a) Environmental Statement – Chapter 21 Appendix 21.3 – Rail
Central Climate Change Risk Assessment
26.10.18 Turley
Environmental Statement Environmental Impact Assessment
(Part 14a)
Non-Technical Summary 26.10.18 Turley
Report Other Planning Statement 26.10.18 Turley
Report Other Design and Access Statement 26.10.18 Turley
Report Other Alternative Sites Assessment 26.10.18 Turley
Report Other Market Assessment Report 26.10.18 JLL
Report Other Rail Operations Report 26.10.18 Intermodality
Report Other Public Rights of Way Strategy 26.10.18 BCA
Report Other Heads of Terms for Development Consent Obligations 26.10.18 Womble Bond
Dickinson
6.1.19.6 Environmental
Statement
6.1.19.6. ES Chapter 19 Appendix 19.6.pdf
6.1.21.1 Environmental
Statement
6.1.21.1. ES Chapter 21 Appendix 21.1.pdf
6.1.21.2 Environmental
Statement
6.1.21.2. ES Chapter 21 Appendix 21.2.pdf
7.3. Alternative Sites Assessment.pdf
7.4. Market Assessment Report.pdf
7.5. Rail Operations Report.pdf
7.6. Public Rights of Way Strategy.pdf
7.7. Heads of Terms of Development
Consent Obligations.pdf
7.1
7.2
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
7.5
7.6
7.7
6.1.21.3 Environmental Statement 6.1.21.3. ES Chapter 21 Appendix 21.3.pdf
6.2 Environmental
Statement
6.2. Non-Technical Summary.pdf
7.3
7.4
7.1. Planning Statement.pdf
7.2. Design and Access Statement.pdf
RC-ALG-FIG-6.1.17.3 Environmental
Statement
6.1.17.3. ES Chapter 17 Figure 17.3.pdf
6.1.19.1 Environmental Statement 6.1.19.1. ES Chapter 19 Appendix 19.1.pdf
6.1.19.2 Environmental Statement 6.1.19.2. ES Chapter 19 Appendix 19.2.pdf
6.1.19.3 Environmental
Statement
6.1.19.3. ES Chapter 19 Appendix 19.3.pdf
RC-ALG-FIG-6.1.19.4 Environmental Statement 6.1.19.4. ES Chapter 19 Figure 19.4.pdf
6.1.19.5 Environmental
Statement
6.1.19.5. ES Chapter 19 Appendix 19.5.pdf
6.1.16.17 Environmental
Statement
6.1.16.17. ES Chapter 16 Appendix
16.17.pdf
RC-ALG-FIG-6.1.16.18 Environmental Statement 6.1.16.18. ES Chapter 16 Figure 16.18.pdf
RC-ALG-FIG-6.1.16.19 Environmental
Statement
6.1.16.19. ES Chapter 16 Figure 16.19.pdf
RC-ALG-FIG-6.1.16.20 Environmental
Statement
6.1.16.20. ES Chapter 16 Figure 16.20.pdf
6.1.17.1 Environmental Statement 6.1.17.1. ES Chapter 17 Transport
Assessment.pdf
RC-ALG-FIG-6.1.17.2 Environmental
Statement
6.1.17.2. ES Chapter 17 Figure 17.2.pdf
6.1.16.11 Environmental Statement 6.1.16.11. ES Chaper 16 Appendix
16.11.pdf
6.1.16.12 Environmental Statement 6.1.16.12. ES Chapter 16 Appendix
16.12.pdf
6.1.16.13 Environmental
Statement
6.1.16.13. ES Chapter 16 Appendix
16.13.pdf
6.1.16.14 Environmental
Statement
6.1.16.14. ES Chapter 16 Appendix
16.14.pdf
6.1.16.15 Environmental Statement 6.1.16.15. ES Chapter 16 Appendix
16.15.pdf
6.1.16.16 Environmental Statement 6.1.16.16. ES Chapter 16 Appendix
16.16.pdf
6.1.16.9 Environmental Statement 6.1.16.9. ES Chapter 16 Appendix 16.9.pdf
6.1.16.10 Environmental
Statement
6.1.16.10. ES Chapter 16 Appendix
16.10.pdf
Report Other Framework Travel Plan 26.10.18 TPA
Report Other Construction Traffic Management Plan 26.10.18 TPA
Report Other Operational Traffic Management Plan 26.10.18 TPA
Report Other Outline Ecological Creation and Habitat Management
Plan
26.10.18 RSK
Report Other 15 year Management and Maintenance Plan 26.10.18 BCA
Report Other Landscape and Ecological Infrastructure Strategy 26.10.18 BCA and RSK
Report Other Biodiversity Offsetting Report 26.10.18 RSK
Report Other Outline Written Scheme of Investigation Archaeology
and Cultural Heritage
26.10.18 CFA Archaeology
Plans/Drawings Other In Principle Monitoring Plan 26.10.18 Turley
Plans/Drawings Other Plan of Plans 26.10.18 Turley
Report Other Sustainability Appraisal 26.10.18 Turley
Report Other Draft Section 55 Check List 26.10.18 Womble Bond
Dickinson
Report Other Economic Benefits Statement 26.10.18 Turley
Report Other Northampton Gateway Interrelationship Report 26.10.18 Womble Bond
Dickinson
Other Documents
Other Documents
Other Documents
Other Documents
7.8 7.8. Framework Travel Plan.pdf
7.9a
7.9b
7.10
7.11
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
Other Documents
7.12
7.13
7.9a. Construction Traffic Management
Plan.pdf
7.9b. Operational Traffic Management
Plan.pdf7.10. Outline Ecological Creation and
Habitat Management Plan.pdf
7.11.15 year Management and Maintenance
Plan.pdf
7.20
7.14
7.15
7.16
7.17
7.18
7.19 7.19. Economic Benefits Statement.pdf
7.20. NG Interrelationship Report.pdf
7.12. Landscape and Ecological
Infrastructure Strategy.pdf
7.13. Biodiversity Offsetting Report.pdf
7.14. Outline WSIA and CH.pdf
7.15. In Principle Monitoring Plan.pdf
7.16. Plan of Plans.pdf
7.17. Sustainability Appraisal.pdf
7.18. Draft S55 Check List.pdf
Other Documents
Other Documents