8
GGP 0000 REV 0
APPLICATION FOR PLANNED OVERTIMEUnique Identifier 36-559
Doc Type WORK INSTRUCTION
Revision 1
Effective date AUGUST 2010
DEFINITIONDAILY MINIMUM REST PERIODSWEEKLY MINIMUM REST PERIODSDAILY LIMITSWEEKLY LIMITS
Pre-arranged overtime as authorised and scheduled by the manager before commencement of the overtime, as per business requirements.12 consecutive hours applicable plus one of the following: (refer weekly minimum rest periods)36 consecutive hrs or 60hrs every two weeks if 36 hours were not granted.4 hours overtime (Employee is allowed to work more than 4hrs on Sat/Sun/Pub Hol. Adhere to all applicable daily & weekly rest periods) 15 hours per week
DEPARTMENT:OPERATINGSECTION:EOD
Name Unique NrDesignationPlanned Hours worked to date for the applicable monthRemaining Planned Hours for the applicable month (Limit 65hrs)Date to be workedTime From Time ToNr of Hours to be worked
J BORLEY4001326A.S.S4Hrs61Hrs05/04/201510h0014h004Hrs
Short description of task/(s) to be performed:Motivation to perform the task/(s) outside normal working hours:
Ass Duties 56Hr cycle C Absent A Shift on F/L
Note: Line Manager / Group Manager not to approve if hours worked to date and remaining hours are not completed.
For a total of => of 60 hours Planned overtime booked and/or in contravention of Rest Period, or 35 Standby Periods Exceeded
- to be authorised by Group Manager & Power Station Manager
REQUESTED BYSUPPORTED BYAUTHORISED BYPSM Approval
Rest Period Contravened / => 60hrs Plnd OT
Signature
Name in PrintJan du Plessis
DesignationSUPERVISORLINE MANAGERGROUP MANAGERPOWER STATION MANAGER
Date04/05/2015
EMBED Word.Picture.8