appendix l.2 dsl permit no. 37712 for removal/fill for...
TRANSCRIPT
RESOURCE REPORT 2 JCEP LNG Terminal Project
Docket No. CP17-_-000
September 2017
Appendix L.2
DSL Permit No. 37712 for Removal/Fill for Slip and Access Channel
RESOURCE REPORT 2 JCEP LNG Terminal Project
Docket No. CP17-_-000
September 2017
Appendix M.2
Compensatory Wetland Mitigation Plan (DEA 2017)
Appendix M.2 Compensatory Wetland Mitigation Plan
This document is currently in progress and will be submitted separately to FERC
to be inserted in this location.
RESOURCE REPORT 2 JCEP LNG Terminal Project
Docket No. CP17_-000
September 2017
Appendix N.2
Permit Application Table of Contents
PERMIT APPLICATION TABLE OF CONTENTS
The following permit applications are currently being prepared for the JCEP Project. The table of contents for each are shown on the following pages.
Section 404/10 Permit Application for the U.S. Army Corps of Engineers, including the Section 401 Water Quality Certification and Section 7 of the Endangered Species Act
Removal-Fill Permit Application for the Oregon Department of State Lands
Section 408 Authorization Package for the U.S. Army Corps of Engineers
Jordan Cove Energy Project
404/10 Permit Application October 2017
TABLE OF CONTENTS
Joint Permit Application – JCLNG
Part 1: JCLNG Joint Permit Application
Attachment 1.1 Vicinity Map
Attachment 1.2 Tax Lot Map Figures
Attachment 4.1 Delineated Wetland and Waters Figures
Attachment 4.2 Wetlands PJD
Attachment 4.3 Wetlands F & G Jursidiction Letter
Attachment 5.1 Alternatives Analysis
Attachment 6.1 Wetland and Water Impacts - Figures & Summary Table
Attachment 6.2 Design Drawings
Attachment 6.3 Summary of Wetland Impacts / Figure 6.3 Bulk Upload Template
Attachment 6.4 Dredged Material Management Plan
Attachment 6.5 PSET Letter
Attachment 6.6 Wetland and Water Impacts Table
Attachment 7.1 Biological Assessment
Attachment 7.2 401 Water Quality Certification Compliance Report
7.21 Turbidity Report
7.2.2 Stormwater Management Plan
7.2.3 Groundwater Report
Attachment 7.3 Cultural Resources Report
Attachment 7.4 Summary of Approvals/Denials Required
Attachment 8.1 Site Restoration Plan
Attachment 8.2 Compensatory Wetland Mitigation Plan
Attachment 9.1 List of Adjacent Property Owners
Jordan Cove Energy Project
Removal Fill Permit Application October 2017
TABLE OF CONTENTS
Joint Permit Application – JCLNG
Part 1: JCLNG Joint Permit Application
Attachment 1.1 Vicinity Map
Attachment 1.2 Tax Lot Map Figures
Attachment 4.1 Delineated Wetland and Waters Figures
Attachment 4.2 Wetlands Concurrence Letters
Attachment 5.1 Alternatives Analysis
Attachment 6.1 Wetland and Water Impacts Figures
Attachment 6.2 Design Drawings
Attachment 6.3 Summary fo Wetland Impacts
Attachment 6.4 Dredged Material Management Plan
Attachment 6.5 PSET Letter
Attachment 7.1 Fish Passage Plan
Attachment 7.4 Summary of Approvals/Denials Required
Attachment 8.1 Site Restoration Plan
Attachment 8.2 Compensatory Wetland Mitigation Plan
Attachment 9.1 List of Adjacent Property Owners
Attachment 9.2 Land Use Compatability Statement
Jordan Cove Energy Project
Section 408 Authorization Package October 2017
TABLE OF CONTENTS
1. Introduction
2. Contact Information
3. Purpore and Need
4. Regulatory requirements for the project
5. Written Endorsement from the Non-Federal Sponsor
6. Project Description
6.1.1 Federal projects 6.1.1.1 Federal Navigation Channel 6.1.1.2 Pile Dikes
6.1.2 JCEP LNG Terminal 6.1.3 JCEP and PCGP Activities proximate to federal projects
6.1.3.1 Access Channel Dredging adjacent to the FNC 6.1.3.2 Navigation Reliability Improvement (NRI) Dredging adjacent to the FNC 6.1.3.3 Translocation and Disposal of Dredged Material
6.1.4 Pacific connector gas pipeline
7. Analysis of work activities on USACE intrastructure
7.1.1 Affects of Access Channel Dredging on the FNC 7.1.2 Affects of Access Channel Dredging on the Pile Dikes 7.1.3 Affects of Navigation Reliability Improvement (NRI) Dredging on the FNC 7.1.4 Affects of NRI Dredging on the Pile Dikes 7.1.5 Affects from temporary translocation of Dredge Material on USACE
Operations and navigational servitude 7.1.6 Affects of Gas Pipeline HDD Crossing on the FNC
8. References
9. Attachments
Attachment A: Figures Attachment B: Major Permits, Approvals, and Consultation for the LNG Terminal Project Attachment C: Written Endorsement from the Non-Federal Sponsor Attachment D: 408 Process and Construction Schedule Attachment E: Access Channel Design Plans Attachment F: Ship Simulation Data Attachment G: Dredged Material Management Plan Attachment H: Coos Bay HDD Plans Attachment I: Engineering and Construction Section 408 Checklist Attachment J: Navigation Section 408 Checklist Attachment K: Environmental Section 408 Checklist Attachment L: Real Estate Section 408 Checklist and Figures