Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Appendix H Pipeline Route Selection

Upload: others

Post on 27-Jun-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection

Shell Canada Limited November 2010

Appendix H Pipeline Route Selection

Page 2: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Appendix H: Pipeline Route Selection Quest Carbon Capture and Storage Project

Volume 1: Project Description

November 2010 Shell Canada Limited

Page 3: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection

Shell Canada Limited November 2010 Page H-i

Table of Contents

Appendix H Pipeline Route Selection H.1 Pipeline Route Selection Criteria .................................................................................... H-1 H.2 Route Options Considered .............................................................................................. H-1

H.2.1 Initial Five Route Options ................................................................................... H-1 H.2.2 Final Route Selection .......................................................................................... H-3

H.3 Re-Routes to Selected Route .......................................................................................... H-5 H.3.1 Well Location Adjustments ................................................................................ H-5 H.3.2 Pipeline Length Optimized ................................................................................. H-5 H.3.3 North Saskatchewan River Re-Route ................................................................. H-5 H.3.4 Northwest of Bruderheim Natural Area Re-route ............................................... H-5

List of Tables

Table H-1 Pipeline Route Selection Criteria ........................................................................ H-1 Table H-2 Pipeline Route Selection Criteria ........................................................................ H-3

List of Figures

Figure H-1 Original Route Options ....................................................................................... H-2 Figure H-2 Re-Routes to Final Route .................................................................................... H-4

Page 4: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Appendix H: Pipeline Route Selection Quest Carbon Capture and Storage Project

Volume 1: Project Description

November 2010 Shell Canada Limited Page H-ii

Page 5: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection

Shell Canada Limited November 2010 Page H-iii

Acronyms

AOSPL ....................................................................................... Alberta Oil Sands Pipeline HDD ....................................................................................... horizontal directional drilling

Page 6: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Appendix H: Pipeline Route Selection Quest Carbon Capture and Storage Project

Volume 1: Project Description

November 2010 Shell Canada Limited Page H-iv

Page 7: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection

Shell Canada Limited November 2010 Page H-1

H.1 Pipeline Route Selection Criteria The route selection for the pipeline involved careful review and consideration of selected criteria to determine preferred and optional routing (see Table H-1).

Table H-1 Pipeline Route Selection Criteria Criteria Considerations

Health and safety • limiting the number of infrastructure crossings • limiting the potential for line strikes

Environment • limiting pipeline and tie-in length • using existing corridors where possible • limiting the number of watercourse and wetland crossings • crossing waterbodies at appropriate locations and during appropriate timing windows,

where feasible • avoiding the Northwest of Bruderheim Natural Area

Regulatory and landowner access requirements

• responding to public and landowner input on route • coordinating with existing and planned land use along the proposed route • avoiding potential future development possibilities

Cost • limiting pipeline and tie-in length • limiting construction costs by avoiding identified obstacles and locations with additional

construction challenges

H.2 Route Options Considered

H.2.1 Initial Five Route Options Prior to public disclosure, five pipeline routes were identified for further study (see Figure H-1). These routes generally paralleled existing corridors and were identified, west to east, as the Access, Enhance, Suncor Oil Sands Pipeline, Enbridge Waupisoo and Alberta Oil Sands Pipeline (AOSPL) routes.

All five route options began at the Scotford Upgrader and ended north of the village of Thorhild, at the CO2 storage area. The number and location of injection wells had yet to be determined when these five route options underwent a review based on available information. Therefore, two potential endpoints were considered in the routing selection.

Endpoint 1 (03-059-20 W4M) was the meeting point for the four more westerly routes (Access, Enhance, Suncor and Enbridge), all of which then followed the same route proceeding northeast to Endpoint 2 (09-060-19 W4M). The most easterly route, AOSPL, bypassed Endpoint 1, terminating north at Endpoint 2.

All five route options had the potential for further commercial options and phased capital expansion, through the use of the CO2 pipeline for enhanced oil recovery in the Redwater Reef.

The Suncor route was removed from consideration because the Suncor pipeline corridor is highly congested, requiring multiple line crossings and increasing the potential for a line strike. Additionally, this route passes directly through the Hamlet of Radway and the Redwater Natural Area, which would potentially increase environmental effects, as well as increasing regulatory requirements and emergency response planning.

Page 8: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

BCSK

AB

FIGURE NO.

H-1

Areaof

Interest

PREPARED FOR

Last

Mod

ified

: Nov

09,

201

0 B

y: a

olso

nQUEST CARBON CAPTURE AND STORAGE PROJECT

Acknowledgements: Original Drawing by StantecPipeline: Sunstone Engineering August 11, 2010, Wells: Shell August 26, 2010, Basedata: National Road Network, Canvec, Altalis. Pipelines: Shell Canada

PREPARED BY

Original Route Options

RGE 23 RGE 22 RGE 21 RGE 20 RGE 19 RGE 18W4M

TWP 61

TWP 60

TWP 59

TWP 58

TWP 57

TWP 56

Smoky Lake

RGE 24

E 25

TWP 55

831

18

661

63

Endpoint 1

Endpoint 2

Lamont

Warspite

Egremont Radway

Opal

Star

Thorhild

Abee

Newbrook

Tawatinaw

Rochester

Namao

JosephburgFortSaskatchewan

Bon Accord

Gibbons

Bruderheim

Redwater

Redwater River

Sturg

eon

River

Beaverhill Creek

North Saskatchewan River

16

15

45

29

28829

825

28A

28

651

830

15

37

830

15

827

WP 10-6

WP 8-19

WP 7-11

WP 15-29

WP 12-14

Elk IslandNational Park

North BruderheimNatural Area

RedwaterNatural Area

Northwest of BruderheimNatural Area

TawatinawNatural Area

345000

345000

365000

365000

385000

385000

5965

000

5965

000

5985

000

5985

000

6005

000

6005

000

6025

000

6025

000

123510425-123 REVD

4 0 4 8

Kilometres

Endpoint

Route Options

Access Pipeline

AOSPL

Enbridge Waupisoo Pipeline

Enhance Pipeline

Suncor Pipeline

Injection Well

Pipeline Route

Shell Scotford

Major Road

Railway

Watercourse

Waterbody

Protected Area

Urban Area

Page 9: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection

Shell Canada Limited November 2010 Page H-3

The Access and Enhance routes are similar, following the same route from the Redwater River north to Endpoint 1. However, the Access route is shorter and more direct between the Scotford Upgrader and the Redwater River. Therefore the Access route was chosen.

The AOSPL route closely follows the Enbridge Waupisoo route until diverging at the town of Bruderheim. The Enbridge Waupisoo route was preferred, because the AOSPL route bypasses Endpoint 1 and would not be able to access any potential injection well sites between Endpoint 1 and Endpoint 2.

The Enbridge Waupisoo (east) and Access (west) routes remained as the preferred options.

H.2.2 Final Route Selection The east (Enbridge) and west (Access) routes were compared using route selection criteria (see Table H-2). Based on these criteria, the east (Enbridge) route was chosen.

Table H-2 Pipeline Route Selection Criteria Criteria East Route West Route Comments

Health and safety Preferred Not preferred • West route requires greater number of pipeline crossings in the Redwater Reef, with increased chance of a line strike

Environment Preferred Not preferred • East route has fewer watercourse crossings

• West route has challenging soil conditions at the Redwater and North Saskatchewan River crossing locations

• East route passes through Northwest of Bruderheim Natural Area

Regulatory and landowner access requirements

Preferred Not preferred • East route has more established community relations

Cost Both options viable • East route estimated at $70 million • West route estimated at $66 million

Schedule Both options viable

The east (Enbridge) route was selected as the preferred route because it avoids the congested Redwater Reef area, and encounters more favourable geotechnical conditions at the North Saskatchewan River crossing location. The initial 10 km of the east (Enbridge) route passes through an area where Shell had existing community relations with landowners. However, the east (Enbridge) route originally passed through the Northwest of Bruderheim Natural Area.

The preferred route is east from Shell Scotford, before turning north to parallel the Enbridge Waupisoo pipeline. After crossing the North Saskatchewan River, the preferred route goes north for approximately 10 km before proceeding northwest to the CO2 storage area (see Figure H-2).

Page 10: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

BC SKAB

FIGURE NO.

H-2

Areaof

Interest

PREPARED FOR

Last

Mod

ified

: Nov

. 9, 2

010

By:

aol

sonQUEST CARBON CAPTURE AND STORAGE PROJECT

Acknowledgements: Original Drawing by StantecPipeline: Sunstone Engineering August 11, 2010, Original Route: April 7, 2010, Reroutes: August 11, 2010 Wells: Shell August 26, 2010, Basedata: National Road Network, Canvec, Altalis

PREPARED BY

Re-Routes to Final Route

FortSaskatchewan

RGE 23 RGE 22 RGE 21 RGE 20 RGE 19 RGE 18W4M

RGE 17

TWP 61

TWP 60

TWP 59

TWP 58

TWP 57

TWP 56

Smoky Lake

Bon Accord

Gibbons

Redwater

Bruderheim

RGE 24

TWP 55

831

18

661

63

Lamont

Warspite

Egremont Radway

Opal

Star

Thorhild

Abee

Newbrook

Tawatinaw

Rochester

Redwater River

Sturg

eon

River

Beaverhill Creek

North Saskatchewan River

15

45

29

28829

Josephburg

Namao

825

28A

28

651

830

15

37

830

15

827

WP 10-6

WP 8-19

WP 7-11

WP 15-29

WP 12-14

TawatinawNatural Area

RedwaterNatural Area

Northwest of BruderheimNatural Area

North BruderheimNatural Area

Elk IslandNational Park

345000

345000

365000

365000

385000

385000

5965

000

5965

000

5985

000

5985

000

6005

000

6005

000

6025

000

6025

000

123510425-124 REVE

4 0 4 8

Kilometres

Route Options

Original Route

Route Reduction

Bruderheim Re-route

Well Location Adjustment

North Saskatchewan River Re-route

Injection Well

Shell Scotford

Major Road

Railway

Watercourse

Waterbody

Protected Area

Urban Area

Page 11: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Quest Carbon Capture and Storage Project Volume 1: Project Description Appendix H: Pipeline Route Selection

Shell Canada Limited November 2010 Page H-5

H.3 Re-Routes to Selected Route

H.3.1 Well Location Adjustments Several minor route modifications were made near the injection wells located in 12-14-60-21 W4M and 10-6-60-20 W4M based on landowner responses and feedback (see Figure H-2).

H.3.2 Pipeline Length Optimized The termination point for the pipeline was reviewed based on the following items:

• final section of pipeline route was located within traditional use areas identified by the Beaver Lake Cree Nation

• less favourable subsurface conditions would limit the effectiveness of CO2 storage, as a result of discontinuities in the BCS in the northeast portion of the storage area

As a result of these factors, the pipeline termination point was moved to 15-29-60-21 W4M (see Figure H-2).

H.3.3 North Saskatchewan River Re-Route The preferred route crosses the North Saskatchewan River at NW-14-57-20 W4M, parallel to the Waupisoo pipeline. This section of the river falls within the Beverly Channel, a subsurface palaeo-channel feature that is generally not suitable for horizontal directional drilling (HDD). To reduce the potential adverse environmental effects of the pipeline on the aquatic environment, Shell reviewed a number of alternative crossing locations for the North Saskatchewan River to determine if HDD was viable.

Geotechnical studies done in 2010 located a suitable HDD crossing location north of the Beverly Channel, at NW 36-57-20 W4M. Preliminary results of the geotechnical investigation indicated that this location would be suitable for a crossing, using either HDD (the preferred method) or alternatively by open cut. As a result, the pipeline was re-routed farther east by about 4 km.

H.3.4 Northwest of Bruderheim Natural Area Re-route The preferred route passes through the Northwest of Bruderheim Natural Area east of the Scotford Upgrader. However, consultation with Alberta Tourism, Parks and Recreation indicated it preferred Shell re-route the pipeline away from the Northwest of Bruderheim Natural Area. The pipeline ROW was re-routed to the south of the natural area, paralleling the Inter Pipeline (Corridor) Inc. Corridor Pipeline route for about 2 km before intersecting the existing route farther to the east.

Page 12: Appendix H Pipeline Route Selection...Volume 1: Project Description Appendix H: Pipeline Route Selection Shell Canada Limited November 2010 Page H-3 The Access and Enhance routes are

Appendix H: Pipeline Route Selection Quest Carbon Capture and Storage Project

Volume 1: Project Description

November 2010 Shell Canada Limited Page H-6