    APPENDIX F: POTENTIAL CONSTRUCTION SEQUENCE AT I-280

    California High‐Speed Rail Project March 2019

    San Jose to Central Valley Wye Constructability Assessment Report – Record PEPD Page  |  F‐1  

  • ··-\,_....__.,, \

    ... �==---------

    ---------------...

    ...

    kmageeCalloutSHIFT TRAFFIC AND CONSTRUCT FOOTING/COLUMN WITHIN MEDIAN

    kmageePolygon

    kmageePolygon

    kmageeText BoxI-280 MAINLINE AND OFF RAMP TRAFFIC SHIFT FOR SHOULDER FOOTING/COLUMN CONSTRUCTION

  • kmageePolygon

    kmageeCalloutSHIFT TRAFFIC AND CONSTRUCT FOOTING/COLUMN WITHIN MEDIAN

    kmageeText BoxI-280 MAINLINE TRAFFIC SHIFT FOR MEDIAN FOOTING/COLUMN CONSTRUCTION

    APPENDIX F: POTENTIAL CONSTRUCTION SEQUENCE AT I-280